TUSHAR D. BHOLE B.E. Civil 147, Jilha Peth,*Front of J.M.P. Market, Jalgaon. Ph.: (0257) 2228691, Mob.: 9422235520 Ref. No. Date:o2-loA /2018 FORM 2(See Regular 3) ENGINEER'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account - Project wise) Date: To, Minakshi Construction (SIDDHIVINAYAK HEIGHTS), Partner 1) Hitendra Shankar Patil, 2) YaminiAjit Borole. Subject :- Certificate of Cost incurred for Development of (ProjectName) for Construction of --- Building(s)l ...L.... wing(s) of the 1. Buildingi Phase of the Project situated on the plot bearing c.No.No./CTS No./Survey No./ Final Plot No.8+9, G.No. l92,Pimprala, Jalgaon, demarcated by its boundaries 21.01070,75.541726 to2L010658, 75.541226 Road to the North 21.010548,75.541288 to 21.010451, 75.4t1751 road and Plot No.10 to the South 21.010451,75.541751 to 21.01070, 75.541726p1ot No.7, to the East to the West of Division Pimprala, Village Jalgaon Taluka Jalgoan District Jalgaon PIN 425001 admeasuring 891.85 sq.mtrs. area Partner being deveioped by Minakshi Construction (SIDDHIVINAYAK HEIGHTS) 1) Hitendra Shankar Patil, 2) Yamini Ajit Borole Ref: RERA Registration Number ... .. Sir, I/ We TUSHAR BHOLE have undertaken assignment of certiffing Estimated Cost for the Subject Real Estate Project proposed to be registered under RERA, being ....Building(s)/...1'...Wing(s)ofthe1..........Building/ phase of the project situated on the plot bearing C.No.No.lCTS No./Survey No./ Final Plot No.8+9, G.No. 192, Pimprala, lalgaon village Jalgaon Taluka Jalgoan District Jalgaon pIN 425001 admeasuring 891.85 sq.mtrs. area being developed byMinakshi Construction (SIDDHIVINAYAK HEIGHTS) Partner 1. Hitendra Shankar Patil, 2) Yamini Ajit Borole Z. Following technical professionals are appointed by Owneri Promoter:- (v) (lws/Shri/smt.KishorM.chopade as L.S/Architect; (vD lws/Shri/Smt.Ujval R.chaudhari as Structural consultant; (vii) Iws/shri/smt... ... as MRP Consultant; (viii) I\4/s/Shri/Smt... ... as Quantity Surveyor; 1. We have estimatedthe cost ofthe completionto obtain Occupation Certificate / Completion Certificate, of the Civil, MEP andAllied works, of the buildings (s) of the Project. Our estimated cost calculations are based on the Drawings/ plans Made available to us for the project under reference by the Developer and Consultants and the Schedule of items and quantity for the entire work as calculated by .. . quantity surveyor appointed by made by developeq and the assumption of the cost of matenal,labour and other inputs made by developer, and the site inspection carried out by us. 2, We estimate total cost of completion of the building(s) of the aforesaid project Under reference as Rs.3,26,00,000/-. The estimated total .or, o, project is with reference to the Civil, MEP and allied works required to be completed for the putpose of obtaining to occupation certificate/ completion certificate for the building(s) from the JALGAON MLNICIPAL CORPORATION, JALGAON bearing the planning Authority under whose jurisdiction the aforesaid project is being implemented. 3. The Estimated Cost incurred till date is calculated at Rs.180,00,000/-. The amount of Estimated Cost incurred is calculated on the base of amount of Total Estimated Cost. 4. The balance cost of completion of the Civil, MEP and allied works of the building(s) of the subject project to obtain Occupation Certificate/ Completion Certificate JALGAON MTINICIPAL CORPORATION, JALGAON(planning authority) is estimated at Rs.1,46,00,000/- 5. I certif,r that the cost of the Civil, MEP and allied works for the aforesaid project as completed on the date of this certificate is as given in Table A and B below. TABLE A Building/ Wing bearing Number I . . .. . .. . . or called (To be prepared separately for each building/ Wing of the Real Estate Project) Sr.No. Particulars Amount l. Total Estimated cost of the building/ Rs.3,26,00,000.00 wing as on .... date of registration is 2. Cost incurred as on 31.03.2018 Rs.1,80,00,000.00 (based on the Estimated cost) 3. Work done in percentage 55% (as Percentage of the estimated cost) 4. Balance cost to be incurred Rs.1,46,00,000.00 (based on the Estimated cost) 5. Cost incurred onAdditionaV Extra Items Rs.00.00 Estimated Cost (Annexure A) <)ft9;>-', TUSHAR D, BIOLE tEcill 1,+T,llltt murtpn