0M SHIV — 0M SHIV INFRA — INFRA FORM - 2 (See Regulation 3) ENGINEER'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account-Project wise) Date:29.12.2025 To, The Partners, 0m Shiv Infra, Plot No 19, Bhagamohan Nagar, Behind Natraj Talkies, Cotton Market Yard, Near Wakharkar Nagar, Dhule- 424001. Regency" having Subject: Certificate of Cost Incurred for Developmentof "Bhalchandra MahaRERA Registration Number:P49800080433being developed by 0m Shiv Infra. Sir, assignment of certifying Estimated 1. IMr. Akshay Pramod Mundke, have undertaken Number:P49800080433 Costfor"Bhalchandra Regency" having MahaRERARegistration being developed by 0m Shiv Infra. for completion ofthe 2. I have estimated the cost of civil. MEP and allied works required the project as apartments and proportionate completion of internal & external works of calculations are per specifications mentioned in agreement of sale.our estimated cost by the based on the drawings/ plans made available to us for the project under reference Developer/ consultants.The schedule of items and quantity required for the entire work as calculated by Quantity Surveyor*appointed by Developer/ Engineer, the assumption of the cost of material,labour and other inputs made by developer, and the site inspection carried out by us to ascertain / confirm the above analysis given to us. 0 19, Bhaga MohanNagar, Near Wakhaikar Nagar, Behind Nataraj Talkies, Cotton Market Yard, Dhu!e 9730190019,9011000019 0 viveky.bagu1019#mail.com estimate Total Estimated cost of completion of the aforesaid project under 3. 1 A B)at the time of Registration. The estimated (Totalof Table and project is with reference to the Civil, MEP and allied works requiredfor cost of apartments and proportionate completion of internal & external completion of the specificationsmentioned in agreement of sale and for the purposeof works, as per certificate/ completion certificate for the building(S) / Wing(S)/ obtaining occupation Development from the Dhule Municipal Corporation being the Layout / Plotted whose jurisdiction the aforesaid project is being implemented. planning authority under Incurred till 30.06.2025is calculated Rs.1,06,48,435/-(Total of Table A 4. The estimated Cost Cost Incurred is calculated on the basis of input and B). The amount of Estimated unit cost of these items. materials / services used and Completion of the Civil, MEP and Allied works for completion of the 5. The Balancecost of internal& external works, as per apartments and proportionate completion of project is estimated at specificationsmentioned in agreement of sale, of the (Total of Table A and B). allied work for the apartment and 6. I certify that the cost of the Civil, MEP and mentioned in agreement of proportionate internal & external works, as per specifications certificate is as given in Table A sale, of aforesaid Project as completed on the date of this and B Below: Table A "Bhalchandra Regency" Building/ Wing/ Layout/ Plotted Development bearing called Plotted Development of the (To be prepared separately for each Building / Wing/ Layout/ Real Estate Project) Particulars Amounts (In Rs. Sr. No. 1 Total Estimated cost of the buildin / win / La out/ Plotted Develo ment 2 Cost incurred as on 30.06.2025 21.30% 3 Work done in percentage (as percentage of the estimated cost 4 Balance Cost to be Incurred**(Basedon Estimated Cost 5 Cost incurred on additional / Extra Itemsnot included in the Estimated Cost Table-C Table B Internal & External Development Works in Respect of the Registered Phase Sr. No. Particulars Amounts In Rs. 1 Total Estimated cost of the Internal and External Development works including amenities and facilities in the la out 2 Cost incurred as on 30.06.2025 0.00 3 work done in percentage (as percentage of the 4 Balance cost to be Incurred Estimated Cost (Based on 5 Cost incurred on included in the additional / Extra Items not EstimatedCost Table-C Yours faithfully, MR. AKSHAY PRAMOD MUNDKE [Not Less than Bachelor's Degree Holder or equivalent as per section 2(u) of the Act] Local Authority licence no. (If applicable) Agreed and accepted by: For 0m Shiv Infra 0M INF PARTNER Signature of Promoter Name: Dinesh Yashwant Bagul Designation: Partner Date: 29.12.2025 Place: Nashik Note: 1. The scope of work is to complete Registered Real Estate Project as per Drawings approved from time to time and as per specifications mentioned in agreement of sale. 2. (*)Quantitysurvey can be done by office of engineer or can be done by an independent Quantity Surveyor, whose Certificateof quantity calculated can be relied upon by the Engineer.In case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked(*)and in case quantity are being calculated by the Engineer,the name of the person in the officeof Engineer,who is responsiblefor the quantity calculated should be mentioned at the place marked(*). 3. (**)BalanceCost to be incurred (4) may vary from Difference between Total estimated Cost (1) and Actual Cost incurred (2) due to deviation in quantity required / escalation of cost etc. As this is an estimated cost, any deviation in quantity required for development of the Real Estate Project will result in amendment of the cost incurred/ to be incurred. 4. All components of work with specifications are indicative are not exhaustive. 5. Please specify if there are any deviations / qualifications.Example:Any deviations in input material used from specification in agreement of sale. Table C List of Extra/ Additional/ Deleted Items considered in cost (Which were not part of the original estimated of Total Cost) Sr.N0. List of Extra/ Additional/ Deleted items Amount (In Rs.) Nil Nil