nivara construction 1380, First Floor, Near Panat Hospital Lane No.5, DHULE - 424 001 (M.S.) Consulting Engineers Tel. : (02562) O.:240627 Prop. Er.Hemant Isai FORM 1|See Regulations] ARCHITECT'S CERTIFICATES (To besubmitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) DATE:20/05/2025 To Mr. Gopal Kashinath Kele (Lad) HUF Plot no.01,Sur.no 74/1/B-1, Deopur ,Dhule-424002 Subject: Certificate of Percentage of Completion of Construction Work of 01 No. of Building Wing of the 01 Phase of the Project [MahaRERA Registration Number. P49800050308] situated on the Plot bearing C.N. No/CTS No. 3530/Survey no.69/3+4+5/1/ Final Plot No.22 & 23 Demarcated by its boundaries (latitude and longitude of the end points) To the North :- Plot no 21,24 To the South:-Road, Tothe East :- Plot no 24,23 & Adi. S. no.69/3+4+5/2 To the West :-Plot no 09,22 Of Division: Nashik, City: Dhule, Taluka: Dhule, District: Dhule, Pin:424002 Admeasuring as per CTS- 1177.70sq.mtsArea being developed by Mr.Gopal Kashinath Gopal (Lad). Sir, V We Nivara Construction undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of Completion of Construction Work of the 01 Building Wing of the 01Phase of the Project, situated on the plot bearing C.N. No/ CTS No. 3530/Survey no.69/3+4+5/1 / Final Plot No.22 & 23 Of Division: Nashik, Villege Walwadi City Dhule, Taluka: Dhule, District: Dhule, Pin:424002 Admeasuring :-as per CTS- 1177.70 sq.mts. area being developed by Mr.Gopal Kashinath Kele (Lad). 1. Following technical professionals are appointed by Owner / Promoter : a M/s/Shri Nivara Construction,Hemant Isai as Architect ; b) M/s /Shri Abhay V Bhadalikar as Structural Consultant C) M/s /Shri NO ANY ONE as MEP Consultant d) M/s /Shri NO ANY ONE as Site Supervisor 2. Based on Site Inspection, with respect to each of the Building/Wing of the aforesaid Real Estate Project , Icertify that as on the date of this certificate, the Percentage of Work done for each of the building Wing of the Real Estate Project as registered vide number P49800050308 under MahaRERA is as per table Aherein below. The percentage of the work executed with respect toeach of the activity of the entire phase is detailed in Table B. Table A Building /Wing Number 0I nos. (To be prepared separately for cach Building /Wing of the Project) Sr.N Percentage of 0. Task/Activity work done 100% 1 Excavation 100% 2 Inos. Plinth 0% 3 00number of Podiums 4 Stilt Floor 100% 100% 5 03 number of Slabs of Super Structure 90% 6 Internal walls, Internal Plaster, Flooring within Flats/premises Door and windows to each of the Flat/ premises 70% 7 Sanitary Fitting within the Flat/ premises Electric Fitting within the Flat/ premises 8 Staircases, Lifts Wells and Lobbies at each Floor level 70% connecting Staircases and Lifts, Overhead and Underground Water Tanks 70% 9 The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/VWing, 10 Installation of lifts, water pumps, Fire Fighting Fittings and 60% Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment Compliance to conditions of environment / CRZ NOC, Finishing to entrance lobby/s Plinth protection paving of areas appurtenant to Building/Wing, compound wall and all other requirements as may be required to Obtain Occupation /Completion Certificate TABLE -B Internal& External Development Works in Respect of the entire Registered Phase Sr.No. Common areas and Proposed Percentage of Facilities, Amenities (Yes/No) Work done Details 1- Internal Roads & NA NA No Footpaths 2 Water Supply Yes 00 As per DMC Sewarage (chamber, As per 3 lines, Septic Tank, Yes 50 STP) drawing 4 Storm Water Drains No 00 NA 5 Landscaping & Tree Yes 50 Asper rules Planting 6 Street Lighting No 00 NA 7 No 00 NA Community Buildings Treatment and disposal of sewage and sullage Yes 50 As per rules water Solid Waste 00 NA 9 No management & Disposal Water conversation and 10 Yes 50 As per rules rain water harvesting 11 Energy Management No 00 NA 12 Fire protection and fire No 00 NA safety Requirements Electrical meter room, 13 sub-station receiving Yes 50 As drawing station 14 Other (Option to Add more) Yours Faithfull Sig'ature Name :-Hemant Isai HEMANT B.ISAI COASultingEngneer 1380,1st Floor, Near Parnat Hospital,Dhule License No.-00219