1380, First Floor, Near Panat Hospital nivara construction Lane No.5, DHULE 424 001 (MS) Consulting Engineers Tel.: (02562) O. 240627 Prop. Er.Hemant Isai FORM 1 See Regulations| ARCHITECT'S CERTIFICATES (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) DATE:12/01/2023 To Mr. Gopal Kashinath Kele (Lad) HUF Plot no.01,Sur.no 74/1/B-1, Deopur Dhule-424002 Subject: Certificate of Percentage of Completion of Construction Work of 01 No. of Building/ Wing of the 01 Phase of the Project [MahaRERA Registration Number. Applied For) situated on the Plot bearing C.N. No/CTS No. 3530/Survey no.69/3+4+5/1/ Final Plot No.22 & 23 Demarcated by its boundaries (latitude and longitude of the end points) To the North:- Plot no 21,24 To the South:-Road, To the East:- Plot no 24,23 & Adj. S. no.69/3+4+5/2 To the West:-Plot no 09,22 Of Division: Nashik, City: Dhule, Taluka: Dhule, District: Dhule, Pin:424002 Admeasuring as per CTS- 1177.70 sq.mts Area being developed by Mr.Gopal Kashinath Gopal (Lad). Sir, V We Nivara Construction undertaken assignment as Architect Licensed Surveyor of certifying Percentage of Completion of Construction Work of the 01 Building/Wing of the 01 Phase of the Project, situated on the plot bearing C.N. No/ CTS No. 3530/Survey no.69/3+4+5/1 / Final Plot No.22 & 23 of Division: Nashik, Villege Walwadi City Dhule, Taluka: Dhule, District: Dhule, Pin:424002 Admeasuring :-as per CTS- 1177.70 sq.mts. area being developed by Mr.Gopal Kashinath Kele (Lad). I. Followingtechnical professionals are appointed by Owner/Promoter a) M/s/Shri Nivara Construction,Hemant Isai as Architect b) M/s /Shri Abhay V Bhadalikar as Structural Consultant C) M/s /Shri NO ANY ONE as MEP Consultant d) M/s /Shri NO ANY ONE as Site Supervisor 2. Based on Site Inspection, with respect to each of the Building/Wing of the aforesaid Real Estate Project , I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project as registered vide number Applied for under MahaRERA is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table A Building /Wing Number 01nos. (To be prepared separately for each Building /Wing ofthe Project) Sr.N Percentage of Task/Activity work done Excavation 100% Inos. Plinth 50% 00 number of Podiums 0% Stilt Floor 0% 03 number of Slabs of Super Structure 0% Internal walls, Internal Plaster, 0% Flooring within Flats/premises Door and windows to each ofthe Flat/ premises Sanitary Fitting within the Flat/ premises 0% Electric Fitting within the Flat/ premises 8 Staircases, Lifts Wells and Lobbies at each Floor level 0% connecting Staircases and Lifts, Overhead and Underground Water Tanks 9 The external plumbing and external plaster, elevation, 0% completion of terraces with waterproofing of the Building/Wing, 10 Installation of lifts, water pumps, Fire Fighting Fittings and 0% Equipment as per CFO NOC, Electrical fittings to Common Areas,electro, mechanical equipment Compliance to conditions of environment / CRZ NOC, Finishing to entrance lobby/s Plinth protection paving of areas appurtenant o Building/Wing, compound wall and all other requirements as may be required to Obtain Occupation /Completion Certificate TABLE B Internal & External Development Works in Respect of the entire Registered Phase Common areas and Proposed Percentage of Sr.No. Work done Details Facilities, Amenities (Yes/No) Internal Roads & NA NA No Footpaths 00 As per DMC Water Supply Yes Sewarage (chamber, Asper 3 lines, Septic Tank, Yes 00 drawing STP) Storm Water Drains No 00 NA Landscaping & Tree Yes 00 As per rules Planting Street Lighting No 00 NA 6 7 Community Buildings No 00 NA Treatment and disposal 00 As per rules 8 of sewage and sullage Yes water Solid Waste 00 NA 9 No management & Disposal Water conversation and As per rules 10 Yes 00 rain water harvesting Energy Management No 00 NA Fire protection and fire NA 12 No 00 safety Requirements Electrical meter room, 13 sub-station receiving Yes 00 As drawing station Other (Option to Add 14 more) Yours Faithfull Signature Name:-Hemant Isai HEMANT B.ISAI Consulting Engineer 1380,1st Floor, Near Panat Hospital,Dhule License No.-00219