\ PARAG S. AHIRE Builder & Developer Building a Better Life! ISO: 2015 Annexure-A ~~Q~ 'RlG1lcfl("l tR, FORM 1 tmI5 31ll1tllldSg ! [ see Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) To, Date "oyf 0\ ,~ Parag Subhash Ahire, Shop No. 23, Shilpkruti, Bharat Nagar, Nakane Road, Deopur, Dhule - 424002. Subject: Certificate of Percentage of Completion of Construction Work of Padmashree Residency VII situated at Mauje Deopur Shiwar, on the Plot bearing GATNo. I ers I Survey No. 42/2 and E 44/7 Final Plot No. 36 having Maha-RERA Registration Number P49800050431 being 8...: developed by Mr. Parag Subhash Ahire. Q) "'C '5 Sir, II We Mr. Parag Subhash Ahire have undertaken assignment as Architect ILicensed .0 Q) Surveyor of certifying Percentage of Completion of Construction Work of project name ~ ..c: en Padmashree Residency VII Apartment having Maha-RERA Registration Number ro E P498000S0431 being developed by Mr. Parag SubhashAhire. "'C ro 0. Based on Site Inspection, with respect to the Layout I Each Number of Building I Wing of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the NINETY Percentage of Work Done for each of the Layout I Number of Building / Wing of the Real Estate i ('\( Project is as per Table - A herein below and the percentage of the work executed with respect to o o each of the activity of the entire phase is detailed in Table B. ~ ...:t Q) TABLE-A "S (To be prepared separately for each Lavout / Building / Wing Number of the project) s: o Building Name: - PADMASHREE RESIDENCY VII APARTMENT ...:- Building Number / Wing: - --- ::J 0. o Q) Date of RERA Registration: - 12 April 2023 o RERA -_ Registration -- Number: - P49800050431 ~-.-,,----- _-_- - -- -_._ --~-~--~.-.-.--.--'.---~- ,_-_. "_ ---_.-. ~.--- _._--_-- -_.__ --_-_ --_.----_ "'C _ .. . .. - - '-'--"--'-'~------------_ Proposed Date of Completion: - 30 November 2027 ~ a::: Sr. Tasks / Activity I Percentage of Q) c ro No. (2) Actual Work Done ..:.:: (1) ro (3) Z 1 Excavation 100% ...:- ro 2 Basement (If Any) --NA-- 0) ro number of Podiums (If Any) --NA-- Z 3 4 Plinth 100% 5 Stilt Floor 100% hva G.uDay ..... Page 1 Of2 6 FIVE number of Slabs of Super Structure 100% Internal Walls, Internal Plaster, Floorings, Doors and Windows within 7 each of the Flats/Premises. 80% 8 Sanitary Fittings, Electrical Fittings within the each Flat/Premises. 0% Staircases, Lifts Wells and Lobbies at each Floor level, Overhead and 9 Underground Water Tanks. 50% The external plumbing and external plaster, elevation, completion of 10 terraces with waterproofing of the BuildingjWing. 0% Installation oflifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing 11 to entrance lobby/s, plinth protection, paving of areas appurtenant to 0% BuildingfWing, Compound Wall and all other requirements as may be required to obtain Occupation / Completion Certificate and complete project as per specifications in the Aireement of Sale. Any Other Activities. TABLE-B Common areas (Internal and External Development Works) in respect of the Registered Phase / Project Number Sr. Common areas and Proposed Percentage of Details No. Facilities, Amenities (Yes/No) Actual Work done (5) (1) (2) (~) (4) 1 Internal Roads & Footpaths NO --NA-- --NA-- 2 Water Supply YES 0% In Progress 3 Sewerage YES 0% In Progress (chamber, lines, Septic Tank, STP). 4 Storm Water Drains NO --NA-- --NA-- 5 Landscaping & Number of YES 50% In Progress FIVE Tree Plantation. 6 Street Lighting NO --NA-- --NA-- 7 Community Buildings NO --NA-- --NA-- 8 Treatment and disposal of NO --NA-- --NA-- sewage and sullage water. 9 Solid Waste management & NO --NA-- --NA-- Disposal. 10 Water conservation, YES 0% In Progress Rain water harvesting. 11 Energy management NO --NA-- --NA-- 12 Fire protection and fire NO --NA-- --NA-- safety requirements. 13 Electrical Meter Room, Sub- Wooden Box Frame for YES 0% Station, Receiving Station. Electric Meters 14 Lift YES 0% In Progress 15 Others (Option to Add more). NO --NA-- --NA-- Yours Faithfully, Eng.PARAG S.AHIRE D.C.E. & B.E.CIVIL , Agreed and Accepted by S..AJtlQBsulting Eng.& Gov.Contractor (License No. 145) Oeopur DHULE.(Reg.No.145) Fnn.P~G.~.itHIRE Name: - PARA~~IRE Date: - Q))\\O ~ \ ~ Page 2 Of2