PARAG S. AHIRE Builder & Developer JIDJJIi1ill:llUGfe BUILDERS lIlI""'" - Building a Better Life! ISO: 2015 Annexure - A ~ ~ cr W ~G"lI C1l 3 number of Podiums (If Any) --NA-- Z 4 Plinth 100% 5 Stilt Floor 100% hva G.uDay ..... Page 1 Of2 6 FIVE number of Slabs of Super Structure 100% Internal Walls, Internal Plaster, Floorings, Doors and Windows within 7 each of the Flats/Premises. 60% 8 Sanitary Fittings, Electrical Fittings within the each Flat/Premises. 0% Staircases, Lifts Wells and Lobbies at each Floor level, Overhead and 9 Underground Water Tanks. so% The external plumbing and external plaster, elevation, completion of 10 terraces with waterproofing of the BuildingfWing. 0% Installation oflifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment jCRZ NOC, Finishing 11 to entrance lobby/s, plinth protection, paving of areas appurtenant to 0% BuildingfWing, Compound Wall and all other requirements as may be required to obtain Occupation / Completion Certificate and complete project as per specifications in the Agreement of Sale. Any Other Activities. TABLE-B Common areas (Internal and External Development Works) in respect of the Registered Phase I Project Number Sr. Common areas and Proposed Percentage of Details No. Facilities, Amenities (Yes/No) Actual Work done (S) (1) (2) (~) (4) 1 Internal Roads & Footpaths NO --NA-- --NA-- 2 Water Supply YES 0% In Progress 3 Sewerage YES 0% In Progress (chamber, lines, Septic Tank, STP). 4 Storm Water Drains NO --NA-- --NA-- S Landscaping & Number of YES so% In Progress FIVE Tree Plantation. 6 Street lighting NO --NA-- --NA-- 7 Community Buildings NO --NA-- --NA-- 8 Treatment and disposal of --NA-- --NA-- NO sewage and sullage water. 9 Solid Waste management & NO --NA-- --NA-- Disposal. 10 Water conservation, YES 0% In Progress Rain water harvesting. 11 Energy management NO --NA-- --NA-- 12 Fire protection and fire NO --NA-- --NA-- safety requirements. 13 Electrical Meter Room, Sub- Wooden Box Frame for YES 0% Station, Receiving Station. Electric Meters 14 Lift YES 0% In Progress IS Others (Option to Add more). NO --NA-- --NA-- Agreed and Accepted by Enq.p~G S.AHIRE ~~ Name: - PARAG H IRE Date: - ~,\~\ ~ Page 2 Of2