PARAG S. AHIRE Builder & Developer "1111"'" _ Building a Better Life! ISO:2015 Annexure-A ~ ~ q~ '("q"'lk11C'1 tR, FORM 1 'Qffi5 3whA Iepg ! [ see Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) To, Date o'Y1o~ ~ Parag Subhash Ahire, Shop No. 23, Shilpkruti, Bharat Nagar, Nakane Road, Deopur, Dhule - 424002. Subject: Certificate of Percentage of Completion of Construction Work of Padmashree Residency VII situated at Mauje Deopur Shiwar, on the Plot bearing GAT No. / CTS / Survey No. 42/2 and E 44/7 Final Plot No. 36 having Maha-RERA Registration Number P49800050431 being 8...: developed by Mr. Parag Subhash Ahire. Q) "0 ':; Sir, II We Mr. Parag Subhash Ahire have undertaken assignment as Architect /Licensed .0 Q) Surveyor of certifying Percentage of Completion of Construction Work of project name ~ .c (/) Padmashree Residency VII Apartment having Maha-RERA Registration Number ctI E P498000S0431 being developed by Mr. Parag Subhash Ahire. "0 ctI C. Based on Site Inspection, with respect to the Layout / Each Number of Building I Wing of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the FORTI ~ Percentage of Work Done for each of the Layout I Number of Building I Wing of the Real Estate Project is as per Table - A herein below and the percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. TABLE-A (To be prepared separately for each Layout / Building / Wing Number of the project) Building Name: - PADMASHREE RESIDENCY VII APARTMENT ..: ::J Building Number I Wing: - --- C. o Q) Date of RERA Registration: - 12April 2023 o RERA Registration Number: --- - -~ --- --- _.- - ---- - ---._'-_- _".-------- P498000S0431 ---_. ----- ._---_._ _---_, --- --~--'---- ---- _. _.-_ -_ -- - "0 -- ctI Proposed Date of Completion: - 30 November 2027 o 0::: Sr. Tasks IActivity Percentage of Q) c No. (2) Actual Work Done ~ ctI ctI (1) (3) Z 1 Excavation 100% ..: ctI 2 Basement (If Any) --NA-- C) ctI 3 number of Podiums (If Any) --NA-- Z 4 Plinth 100% 5 Stilt Floor 100% hva G.uDay ..... Page 1 Of2 6 FIVE number of Slabs of Super Structure 40% Internal Walls, Internal Plaster, Floorings, Doors and Windows within 7 each of the Flats/Premises. 20% 8 Sanitary Fittings, Electrical Fittings within the each Flat/Premises. 0% Staircases, Lifts Wells and Lobbies at each Floor level, Overhead and 9 Underground Water Tanks. 0% The external plumbing and external plaster, elevation, completion of 10 terraces with waterproofing of the Building/Wing. 0% Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing 11 to entrance lobby/s, plinth protection, paving of areas appurtenant to 0% BuildingjWing, Compound Wall and all other requirements as may be required to obtain Occupation / Completion Certificate and complete project as per specifications in the Agreement of Sale. Any Other Activities. TABLE-B Common areas (Internal and External Development Works) in respect of the Registered Phase / Project Number. Sr. Common areas and Proposed Percentage of Details No. Facilities, Amenities (Yes/No) Actual Work done (5) (1) (2) (3) (4) 1 Internal Roads & Footpaths NO --NA-- --NA-- 2 Water Supply YES 0% In Progress 3 Sewerage YES 0% In Progress (chamber, lines, Septic Tank, STP). 4 Storm Water Drains NO --NA-- --NA-- 5 Landscaping & Number of YES 50% In Progress FIVE Tree Plantation. 6 Street Lighting NO --NA-- --NA-- 7 Community Buildings NO --NA-- --NA-- 8 Treatment and disposal of NO --NA-- --NA-- sewage and sullage water. 9 Solid Waste management & NO --NA-- --NA-- Disposal. 10 Water conservation, YES 0% In Progress Rain water harvesting. 11 Energy management NO --NA-- --NA-- 12 Fire protection and fire NO --NA-- --NA-- safety requirements. 13 Electrical Meter Room, Sub- Wooden Box Frame for YES 0% Station, Receiving Station. Electric Meters 14 Lift YES 0% In Progress 15 Others (Option to Add more). NO --NA-- --NA-- Yours Faithfully, Eng.PARAG S.AHIRE D.C.E. & B.E.CIVIL Consulting Eng.& Gov.Contractor Agreed and Accepted by AHIRE Deopur DHULE.(Reg.No.145) (License No. 145) . EnQ.PARAG S.AJ-1 QE 1 Name: - PARA~:IIRE Date: - or'()~1~ Page 2 Of2