PARAG S. AHIRE Builder & Developer Building a Better Life! ISO: 2015 Annexure-A ~ ~ q~ '«1(;11<1')(1 tR, FORM 1 t:I5m 3i Il"l'tlll Cbg ! [ see Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) To, Date V1.-f()d ~ Parag Subhash Ahire, Shop No. 23, Shilpkruti, Bharat Nagar, Nakane Road, Deopur, Dhule - 424002. Subject: Certificate of Percentage of Completion of Construction Work of Padmashree Residency VII situated at Mauje Deopur Shiwar, on the Plot bearing GAT No. I ers I Survey No. 42/2 and E 44/7 Final Plot No. 36 having Maha-RERA Registration Number P49800050431 being 8...: developed by Mr. Parag Subhash Ahire. Q) "0 :::::I Sir, II We Mr. Parag Subhash Ahire have undertaken assignment as Architect /Licensed .0 Q) Surveyor of certifying Percentage of Completion of Construction Work of project name ~ ..c C/) Padmashree Residency VII Apartment having Maha-RERA Registration Number (1J E P498000S0431 being developed by Mr. Parag Subhash Ahire. "0 (1J a. Based on Site Inspection, with respect to the Layout I Each Number of Building I Wing of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the TWENTY Percentage of Work Done for each of the Layout I Number of Building I Wing of the Real Estate ! C\I Project is as per Table - A herein below and the percentage of the work executed with respect to o o each of the activity of the entire phase is detailed in Table B. '<:t C\I '<:t Q) TABLE-A I (To be prepared separately for each Layout / Building I Wing Number of the project) :::::I s: o Building Name: - PADMASHREE RESIDENCY VII APARTMENT ..: :::::I Building Number I Wing: - --- a. o Q) Date of RERA Registration: - 12 April 2023 o RERA Registration Number: - - --P49800050431 ____ ~ _____ ~_r_~ ____ - r _ - - --~' - - ---- .__ _ _ ••• ----, -~.--- - - -- ._~.- _"_,,_,, ._'.0 __ ._- •• "0 . . .,--- (1J Proposed Date of Completion: - 30 November 2027 o 0::: Sr. Tasks IActivity Percentage of Q) c No. (2) Actual Work Done (1J .::t! (1) (3) Z (1J 1 Excavation 100% ..: (1J 2 Basement (If Any) --NA-- 0> (1J number of Podiums (If Any) --NA-- Z 3 4 Plinth 100% 5 Stilt Floor 100% hv a G.uDay ..... Page 10f2 6 FIVE number of Slabs of Super Structure 00% Internal Walls, Internal Plaster, Floorings, Doors and Windows within 7 each of the Flats/Premises. 0% 8 Sanitary Fittings, Electrical Fittings within the each Flat/Premises. 0% Staircases, Lifts Wells and Lobbies at each Floor level, Overhead and 9 Underground Water Tanks. 0% The external plumbing and external plaster, elevation, completion of 10 terraces with waterproofing of the BuildingfWing. 0% Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFONOC,Electricalfittings to CommonAreas, electro, mechanical equipment, Complianceto conditions of environment /CRZ NOC,Finishing 11 to entrance lobby/s, plinth protection, paving of areas appurtenant to 0% Building/Wing, CompoundWall and all other requirements as may be required to obtain Occupation/ CompletionCertificateand complete project as per specificationsin the Agreement of Sale. Any Other Activities. TABLE-B Common areas (Internal and External Development Works) in respect of the Registered Phase I Project Number Sr. Common areas and Proposed Percentage of Details No. Facilities, Amenities (Yes/No) Actual Work done (5) (1) (2) (~) (4) 1 Internal Roads & Footpaths NO --NA-- --NA-- 2 Water Supply YES 0% In Progress 3 Sewerage YES 0% In Progress (chamber, lines, SepticTank, STP). 4 Storm Water Drains NO --NA-- --NA-- 5 Landscaping & Number of YES 50% In Progress FIVE Tree Plantation. 6 Street Lighting NO --NA-- --NA-- 7 Community Buildings NO --NA-- --NA-- 8 Treatment and disposal of --NA-- --NA-- NO sewage and sullage water. 9 Solid Waste management & NO --NA-- --NA-- Disposal. 10 Water conservation, YES 0% In Progress Rain water harvesting. 11 Energy management NO --NA-- --NA-- 12 Fire protection and fire NO --NA-- --NA-- safety requirements. 13 Electrical Meter Room, Sub- Wooden Box Frame for YES 0% Station, Receiving Station. Electric Meters 14 Lift YES 0% In Progress 15 Others (Option to Add more). NO --NA-- --NA-- Yours Faithfully, Eng.PARAG S.AHIRE D.C.E. & B.E.CIVIL Agreed and Accepted by MR. AHI~nsulting Eng.& Gov.Contractor (License No. 145) Deopur DHULE.(Reg.No.145) Eng.PARAG S.AHIRE Name: - Date: - PARAJJ:~;~ 0,I oYt .uru, Page 2 Of2