'\ PARAG S. AHIRE Builder & Developer E 8 BUILDERS '(6 E Building a Better Life! 0> ISO: 2015 Annexure-A @ I'-- ~ ~ Q ~ ~G1lcTIC'1 tR, FORMl I'-- -.:t 'Qffi5 3llJOldlldSg ! -.:t [ see Regulation 3] ~ Q) ARCHITECT'S CERTIFICATE "0 (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) ::J .0 To, Date 0)'\ tI}I ~1.a ~ Parag Subhash Ahire, -fjj Shop No. 23, Shilpkruti, Bharat Nagar, Nakane Road, Deopur, Dhule - 424002. ~ "0 <0 Subject: Certificate of Percentage of Completion of Construction Work of Padmashree Residency a. VII situated at Mauje Deopur Shiwar, on the Plot bearing GAT No. / CTS / Survey No. 42/2 and E 44/7 Final Plot No. 36 having Maha-RERA Registration Number P49800050431 being 8~ developed by Mr. Parag Subhash Ahire. Q) "0 ::J Sir, 1/ We Mr. Parag Subhash Ahire have undertaken assignment as Architect /Licensed .0 Q) Surveyor of certifying Percentage of Completion of Construction Work of project name ~ ..c. (/) Padmashree Residency VII Apartment having Maha-RERA Registration Number <0 E P498000S0431 being developed by Mr. Parag Subhash Ahire. "0 <0 a. Based on Site Inspection, with respect to the Layout / Each Number of Building / Wing of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the ZERO Percentage ~ of Work Done for each of the Layout / Number of Building / Wing of the Real Estate Project is N as per Table - A herein below and the percentage of the work executed with respect to each of o o the activity of the entire phase is detailed in Table B. -.:t N -.:t Q) TABLE-A ::J (To be prepared separately for each Layout / Building / Wing Number of the project) ..c. o Building Name: - PADMASHREE RESIDENCY VII APARTMENT ..: ::J Building Number / Wing: - --- a. o Date of RERA Registration: - 12 April 2023 o Q) RERA Registration Number: - P49800050431 --_ _------ _---_._-_ _ _---_. __ ._ -._ - -_ _._._ _._------ "0 ____ •••• __ 'r ____ •• ------_.--------_- _--- -----_ _____ . _____ .~ ___________ ~ __ .•• ___ ~ - ______ • ___ •• __ .. - .. ... ... .. -- ,_ ..--- . - ......... .. co Proposed Date of Completion: - 30 November 2027 o I 0::: Sr. Tasks / Activity Percentage of c Q) No. (2) Actual Work Done ~ (1) (3) I Z <0 1 Excavation 0% ..: <0 2 Basement (If Any) --NA-- 0> <0 3 number of Podiums (If Any) --NA-- Z ..... 4 Plinth 0% ~ <0 5 Stilt Floor 0% ..c. rn C") N hva G.uDay ..... Page 1of2 6 FIVE number of Slabs of Super Structure 0% Internal Walls, Internal Plaster, Floorings, Doors and Windows within 7 each of the Flats/Premises. 0% 8 Sanitary Fittings, Electrical Fittings within the each Flat/Premises. 0% Staircases, Lifts Wells and Lobbies at each Floor level, Overhead and 9 Underground Water Tanks. 0% The external plumbing and external plaster, elevation, completion of 10 terraces with waterproofing of the BuildingJWing. 0% Installation oflifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing 11 to entrance lobby/s, plinth protection, paving of areas appurtenant to 0% Building/Wing, Compound Wall and all other requirements as may be required to obtain Occupation / Completion Certificate and complete project as per specifications in the Agreement of Sale. Any Other Activities. TABLE-B Common areas (Internal and External Development Works) in respect of the Registered Phase / Project Number. Sr. Common areas and Proposed Percentage of Details No. Facilities, Amenities (Yes/No) Actual Work done (5) (1) (2) (3) (4) 1 Internal Roads & Footpaths NO --NA-- --NA-- 2 Water Supply YES 0% In Progress 3 Sewerage YES 0% In Progress (chamber, lines, Septic Tank, STP). 4 Storm Water Drains NO --NA-- --NA-- 5 Landscaping & Number of YES 0% In Progress FIVE Tree Plantation. 6 Street Lighting NO --NA-- --NA-- 7 Community Buildings NO --NA-- --NA-- 8 Treatment and disposal of NO --NA-- --NA-- sewage and sullage water. 9 Solid Waste management & NO --NA-- --NA-- Disposal. 10 Water conservation, YES 0% In Progress Rain water harvesting. 11 Energy management NO --NA-- --NA-- 12 Fire protection and fire NO --NA-- --NA-- safE!"tY re_quirements. 13 Electrical Meter Room, Sub- Wooden Box Frame for YES 0% Station, Receiving Station. Electric Meters 14 Lift YES 0% In Progress 15 Others (Option to Add more). NO --NA-- --NA-- Yours Faithfully, '.~0 Eng.PARAG S.AHIRE )# ~ D.C.E~ & B.E.CIVIL Consulting Eng.& Gov.Contractor Agreed and Accepted by ARAG S. AHIRE Oeopur OHULE.(Reg.No.145) (License No. 145) ... Eng.~~ S.AHIRE Name: -PARA~~ ... Date: - cl')_.,\ ~ ~ Page 2 Of2