Annexure – A FORM 1 [ see Regulation13] ARCHITECT’S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) To, Date 07/01/2024 Mr. Parag Subhash Ahire, Shop No. 23, Shilpkruti, Bharat Nagar, Nakane Road, Deopur, Dhule – 424002. Subject: Certificate of Percentage of Completion of Construction Work of Padmashree Residency VII Apartment situated in Mauje Deopur Shiwar on the Plot bearing GAT No. / CTS / Survey No. 42/2 and 44/7 Final Plot No. 36 having Maha-RERA Registration Number P49800050431 being developed by Mr. Parag Subhash Ahire. Sir, I/ We Mr. Parag Subhash Ahire have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of Completion of Construction Work of project name Padmashree Residency VII Apartment having Maha-RERA Registration Number P49800050431 being developed by Mr. Parag Subhash Ahire. Based on Site Inspection, with respect to the Layout / Each Number of Building / Wing of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the THIRTY Percentage of Work Done for each of the Layout / Number of Building / Wing of the Real Estate Project is as per Table – A herein below and the percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. TABLE – A (To be prepared separately for each Layout / Building / Wing Number of the project) Building Name: - Padmashree Residency VII Apartment Building Number / Wing: - ---- Date of RERA Registration: - 12/04/2023 RERA Registration Number: - P49800050431 Proposed Date of Completion: - 30 November 2027 Sr. Tasks /Activity Percentage of No. (2) Actual Work Done (1) (3) 1 Excavation 100 % 2 Basement (If Any) --NA-- 3 _________ number of Podiums (If Any) --NA-- 4 Plinth 100 % 5 Stilt Floor 100 % 6 FIVE number of Slabs of Super Structure 20 % Internal Walls, Internal Plaster, Floorings, Doors and Windows 7 within each of the Flats/Premises. 0% 8 Sanitary Fittings, Electrical Fittings within the each Flat/Premises. 0% hv a G.uDay….. Page 1 of 2 Staircases, Lifts Wells and Lobbies at each Floor level, Overhead and 9 Underground Water Tanks. 0% The external plumbing and external plaster, elevation, completion of 10 terraces with waterproofing of the Building/Wing. 0% Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas 11 appurtenant to Building/Wing, Compound Wall and all other 0% requirements as may be required to obtain Occupation / Completion Certificate and complete project as per specifications in the Agreement of Sale. Any Other Activities. TABLE-B Common areas (Internal and External Development Works) in respect of the Registered Phase / Project Number. Sr. Common areas and Proposed Percentage of Details No. Facilities, Amenities (Yes/No) Actual Work done (5) (1) (2) (3) (4) 1 Internal Roads & Footpaths NO --NA-- --NA-- 2 Water Supply YES 0% In Progress 3 Sewerage YES 0% In Progress (chamber, lines, Septic Tank, STP). 4 Storm Water Drains NO --NA-- --NA-- 5 Landscaping & Number of FIVE YES 0% In Progress Tree Plantation. 6 Street Lighting NO --NA-- --NA-- 7 Community Buildings NO --NA-- --NA-- 8 Treatment and disposal of NO --NA-- --NA-- sewage and sullage water. 9 Solid Waste management & NO --NA-- --NA-- Disposal. 10 Water conservation, YES 0% In Progress Rain water harvesting. 11 Energy management NO --NA-- --NA-- 12 Fire protection and fire safety NO --NA-- --NA-- requirements. 13 Electrical Meter Room, Sub- YES 0% In Progress Station, Receiving Station. 14 Lift YES 0% In Progress 15 Others (Option to Add more). --NA-- Yours Faithfully, MR. PARAG SUBHASH AHIRE (License No. 145) Agreed and Accepted by Name: - MR. PARAG SUBHASH AHIRE. Date: - Page 2 of 2