Fom 1 (See Regulaticn 3) ARCHITECT"'S CERTIFICATE Date: 28/01/2025 To M/s. Navjeevan Developers and Infiasthucture Services, Plot No, 20,21,22, Samartha Nagar, Shirpur, Taluka -Shipur, Dist Dhule, 425405 Subject: Certificate of Percentage of Completion of Canstuction Work of "hamngal Society,"'situated an the Plot No 58/59, S.No. 26/1/D/2, demarcated by boundaries Plot No.57 to the East, Plot No.60 &9to the West, GAT No.25/1A to the South, Road to the North at Mandal, Talkuka -Shirpur, Distrit-Dhule, PIN - 425405 acimeasuring 243.43 sqmts. area of Plot S8 arnd 256.50 sq.mts. Area of Plot No.59 being developed by M/s Navjeevan Developers and Infrastructure Services, (Partnersip Fim). Sir, L, Piyush Rameshcand Jain have undetaken assigmet as Engineer of certifying Percentage of Campletian of Constructian Watk of the "htanangal Society", situated on the Plot No. 58/59, S. No. 26/1/D2, At Mandal, Tauka- Shirpur, District- Dhule, PIN 425405 admeasuring 243.43 sq mts area of Plot No. 58 arnd 256.50 sq mts area of Pot No. 59 being developed by M/s Navjeevan Developers and Infrastructure Services Following tecrical professials are appointed by Owner/ Pramoter: (i) Shri Piyush RJain as Architect/Engineer ; (ii) Shri Mitesh Vijaykumar Muha as Structural Consultant Based on Site Inspecion, with respect to each of the Bulding of the aforesaid Real Estate Project, Icertify that as an the date of this certificate, the Percentage of Work Done for the building of the Real Estate Project as registered vide rumber - Applied For under MabaRERA is as per Table Aherein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table A "htanangal Society", Shirr. Sr. No Tasks |Activity Percentage of work done 1 Excavation 100 1umber of Plinth 100 Ommber of Podiums NA. 4 Stilt Floor 00 4 mmber of Slabs of Super Structure 00 6 Intemal walls, Intemal Plaster, Floorings within 00 Flats/Premises, Doors and Wndows to each of the Flat/Premises 7 Sanitary Fitings within the Flat/Prermises, Electrical 0 Fittings within the Flat/Premises. Staircases, Lifts Wells and Lobbies at each Floor level 00 comecting Staircases and Lifts, Overhead and Underground Water Tanks. 9 The extemal plunbing and extemal plaster, elevatian, Campletian of tenaces with waterproofing of the Building Wing, 10 nstallation of Lifts, Water Pumps, Fire Fighting Fíttings and Equipment as per CFO NOC, Electical Fittings to Commn areas, Electro, Mechanical Equipment, Compliance to conditians of envirument /RZ NOC, Finishing to entrance lohby/s, plinthprotection, paving of areas apputenant to Building, Campound Wall and all oher requirements as may be eguired to obtain Occupation Certificate/ Campletin Certificate. TABLE-B "hdtramangal Society", Shirpau. Details S.No Common areas Proposed Percentage of and Facilities, (Yes/No) Work done Amenities 1. Intemal Roads & N N.A. Foopaths Bore Well Done & Municipal Water Cornection 50 2. Water Supply In Progress 3. Sewerage 00 (chamber, lines, Y Septic Tank, STP) In Progress 00 4. Stom Water Drains 00 5. Landiscaping & In Progess Tree Planting N.A. 6. Street Lighting N 1. Comnity N.A. Buildings 8 Treatment and di_posal of N.A. sewage and N sullage water Sohd Waste Management & N N.A. 9. Disposal Water conservation, Rain water 00 In Progress 10. harvesting Energy N.A. 11. Imanagement N 12. Fire protection And fie safety requirements 00 13. Electrical Meter roam, sub-station, receiving station 00 In Progress Yous Faithfully, M. Piyush RJain Lic.No.211