1380, First Floor, Near Panat Hospital | nivara construction Lane No.5, DHULE - 424 001 (M.S.) Consulting Engineers Tel. (02562) O. 240627 Prop. Er.Hemant Isai FORM 1 | See Regulations| ARCHITECT'S CERTIFICATES (To be submitted at the time of Registration ofOngoing Project and for withdrawal of Money from Designated Account) DATE:11/10/2022 To Mr. Gopal Kashinath Kele& Other 2 (HUF) Plot no.01,Sur.no 74/1/B-1, Deopur Dhule-424002 Subject:Certificate of Percentage of Completion of Construction Work of01 No. of Building/ Wing of the 01 Phase of the Project [MahaRERA Registration Number.P49800045814] situated on the Plot bearing C.N. No/CTS No. /Survey no.133/2/ Final Plot No.01 Demarcated by its boundaries (latitudeand longitude of the end points) To the North :-6Mtrs Road, To the South:-Road, To the East :- Plot no 27, To the West:-Plot no 29, of Division: Nashik, City: Dhule, Taluka: Dhule, District: Dhule, Pin:424002 Admeasuring as per 7/12- 239sq.mts& CTS- 000 sq.mtsArea being developed by Mr.Gopal Kashinath Gopal & Other 2. Sir /We Nivara Construction undertaken assignment as Architect Licensed Surveyor of certifying Percentage of Completion of Construction Work of the 01 Building/Wing of the 01Phase of the Project, situated on the plot bearing C.N. No/CTS No./Survey no.133/2/ Final Plot No.01 Of Division: Nashik, Villege WalwadiCity Dhule, Taluka: Dhule, District: Dhule, Pin:424002Admeasuring :-as per 7/12- 239sq.mts& CTS- 000sq.nmts. area being developed byM/s Vimal Developers. 1. Following technical professionals are appointed by Owner/Promoter: a) M/s/Shri Nivara Construction,Hemant Isai as Architect; M/s /Shri Abhay V Bhadalikar as Structural Consultant b) M/s /Shri NO ANY ONE as MEP Consultant c) d) M/s /Shri NO ANY ONE as Site Supervisor 2. Based on Site Inspection, with respect to each of the Building/Wing of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project as registered vide number P49800045814 under MahaRERA is as per table A herein below. The percentage ne work executed with respect to each of the activity of the entire phase is detailed in Table B. Table A Building/Wing Number 01 nos. (To be prepared separately for each Building /Wing of the Project) Percentage of Sr. N Task/Activity work done 0. Excavation 100% 100% Inos. Plinth 0% 00 number of Podiums 0% StiltFloor 100% 03 number of Slabs of Super Structure 100% Internal walls, Internal Plaster, Flooring within Flats/premises Door and windows to each of the Flat/ premises Sanitary Fitting within the Flat/ premises 100% Electric Fitting within the Flat/ premises Lifts Wells and Lobbies at each Floor level 100% Staircases, connecting Staircases and Lifts, Overhead and Underground Water Tanks The external plumbing and external plaster, elevation, 100% 9 completion of terraces with waterproofing of the Building/Wing. and 100% 10 Installation of lifts, water pumps, Fire Fighting Fittings Common Equipment as per CFO NOC, Electrical fittings conditions to to Areas.electro, mechanical equipment Compliance NOC, Finishing to entrance lobby/s of environment CRZ paving of areas appurtenant to Plinth protection Building/Wing. compound wall and all other requirements as Obtain Occupation /Completion Certificate may be required to TABLE B Internal &External Development Works in Respect of theentire Registered Phase Common areas and Proposed Percentage of Sr.No. Facilities, Amenities (Yes/No) Work done Detais Internal Roads & No NA NA Footpaths 2 Water Supply Yes 100 As per DMC Sewarage (chamber, As per 3 lines, Septic Tank . Yes 100 STP) drawing Storm Water Drains No 00 NA 5 Landscaping & Tree Yes 100 As per rules Planting Street Lighting No 00 NA Community Buildings No 00 NA Treatment and disposal 8 of sewage and sullage Yes 100 As per rules water Solid Waste 9 No 00 NA management &Disposal Water conversation and 10 Yes 100 As per rules rain water harvesting Energy Management No 00 NA Fire protection and fire 12 No 00 NA safety Requirements Electrical meter room 13 sub-station receiving Yes 100 As drawing station Other (Option to Add 14 more) Yours Faithfull Signature Name :-Hemant Isai HEMANT B.ISA Consulting Engineer 1380,1st Floor, Near Panat Hospital, Dhule License No.-00219