PARAG S. AHIRE Builder & Developer Building a Better Life r ISO: 2015 ~ ~ q W '«lGiIc11C1 tR, Annexure - A tJ5m 3'l11"l1':£1ICbg ! FORM 1 [ see Regulation 3] ARCHITECT'S CERTIFICATE ·s (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) .0 To, Date crs:11 d ''2-£/)- "l.-" ~ .r:: Parag Subhash Ahire, ~ Plot No. 103, Suprabhat, Near Patil Nagar, Nekane Road, Dhule, 424002. "" "0 E ro a. Subject: Certificate of Percentage of Completion of Construction Work of Padmashree Residency VI situated at Mauje Dhule Shiwar, Station Road, Dhule 424001 on the Plot bearing GAT No. / E o CTS / Survey No. 551/ A/220/24 Final Plot No. 24 having Maha-RERA Registration Number o ...:: Q.> P49800024286 being developed by Parag Subhash Ahire. "0 :J .0 Sir, 1/ We Mr. Parag Subhash Ahire have undertaken assignment as Architect /Licensed Surveyor Q.> ~ of certifying Percentage of Completion of Construction Work of project name Padmashree s: !/) Residency VI having Maha-RERA Registration Number P49800024286 being developed by ro E Parag Subhash Ahire. "0 ro a. Based on Site Inspection, with respect to the Layout / Each Number of Building / Wing of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the HUNDREAD i Percentage of Work Done for each ofthe Layout / Number of Building / Wing of the Real Estate N o Project is as per Table - A herein below and the percentage of the work executed with respect to o ">t each of the activity of the entire phase is detailed in Table B. N ">t Q.> TABLE -A :J .r:: (To be prepared separately for each Layout / Building / Wing Number ofthe project) o Building Name: - PADMASHREE RESIDENCYVI ....- :J Building Number / Wing: - --- a. o Q.> Date of RERA Registration: - 03 February 2020 o RERA Registration Number: - P49800024286 Proposed Date of Completion: - 31 January 2023 Sr. Tasks / Activity Percentage of No. (2) Actual Work Done (1) (3) .....: 1 Excavation 100% ro 2 Basement(If Any) --NA-- O'l ro number ofPodiums(If Any) Z 3 --NA-- 4 ONE Plinth 100% 5 StiltFloor 100% hva G.uDay ..... Page1 Of2 6 Three number of Slabs of Super Structure 100% Internal Walls, Internal Plaster, Floorings, Doors and Windows within 7 each of the Flats/Premises. 100 % 8 Sanitary Fittings, Electrical Fittings within the each Flat/Premises. 100% Staircases, Lifts Wells and Lobbies at each Floor level, Overhead and 9 Underground Water Tanks. 100% The external plumbing and external plaster, elevation, completion of 10 terraces with waterproofing of the Building/Wing. 100% Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing 11 to entrance lobby/s, plinth protection, paving of areas appurtenant to 100% Building/Wing, Compound Wall and all other requirements as may be required to obtain Occupation / Completion Certificate and complete project as per specifications in the Agreement of Sale. Any Other Activities. TABLE-B Common areas (Internal and External Development Works) in respect of the Registered Phase / Project Number. Sf. Common areas and Proposed Percentage of Details No. Facilities, Amenities (Yes/No) Actual Work done (5) (1) (2) (3) (4) 1 Internal Roads & Footpaths NO --NA-- --NA-- 2 Water Supply YES 100 % Completed 3 Sewerage YES 100% Completed (chamber, lines, Septic Tank, STP). 4 Storm Water Drains NO --NA-- --NA-- 5 Landscaping & Number of YES 100% Completed FIVE Tree Plantation. 6 Street Lighting NO --NA-- --NA-- 7 Community Buildings NO --NA-- --NA-- 8 Treatment and disposal of NO --NA-- --NA-- sewage and sullage water. 9 Solid Waste management & --NA-- NO --NA-- Disposal. 10 Water conservation, YES 100% Completed Rain water harvesting. 11 Energy management NO --NA-- --NA-- 12 Fire protection and fire NO --NA-- --NA-- safety requirements. 13 Electrical Meter Room, Sub- Wooden Box Frame for YES 100% Station, Receiving Station. Electric Meters 14 Lift YES 100% Completed 15 Others (Option to Add more). NO --NA-- --NA-- Y~OFaithf lly Eng.PARAG S.AHIRE • ' D.C.E. & B.E.CIVIL Consulting Eng.& Gov.Contractor Agreed and Accepted by MR. G S. AHI~eopur DHULE.(Reg.No.145) Eng.PARAG S.AHIRE (License No. CA/2018/96038) ~ Name: - PARAG~ r""',o' ' ' l..K./~/\.'~ )_ Page 2 of 2 Date: - 0 _)I