PARAG S. AHIRE Builder & Developer Building a Better Life! ISO: 2015 ~ ~ q~ '«lGik~1C1 tR, Annexure -A qm5 3l11OltMld5g ! FORM 1 [ see Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) To, Date () G }cJf-J?JYL -._ " Parag Subhash Ahire, Plot No. 103, Suprabhat, Near Patil Nagar, Nekane Road, Dhule, 424002. Subject: Certificate of Percentage of Completion of Construction Work of Padmashree Residency VI situated at Mauje Dhule Shiwar, Station Road, Dhule 424001 on the Plot bearing GAT No. I E o CTS I Survey No. 551/A/220/24 Final Plot No. 24 having Maha-RERA Registration Number o ...: Q) P49800024286 being developed by Parag Subhash Ahire. -0 ::J .0 Sir, II We Mr. Parag Subhash Ahire have undertaken assignment as Architect ILicensed Q) ~ Surveyor of certifying Percentage of Completion of Construction Work of project name .s:: sn ro Padmashree Residency VI having Maha-RERA Registration Number P49800024286 being E -0 developed by Parag Subhash Ahire. ro o, Based on Site Inspection, with respect to the Layout I Each Number of Building I Wing of the ~ aforesaid Real Estate Project, I certify that as on the date of this certificate, the HUNDREAD Percentage of Work Done for each ofthe Layout I Number of Building I Wing ofthe Real Estate N o Project is as per Table - A herein below and the percentage of the work executed with respect to o -.:t each of the activity of the entire phase is detailed in Table B. N -.:t Q) ::J TABLE-A .s:: (To beprepared separately for each Layout / Building / Wing Number of the project) o ..: Building Name: - PADMASHREE RESIDENCY VI ::J o, Building Number I Wing: - --- o Q) Date of RERA Registration: - 03 February 2020 o -0 RERA Registration Number: - P49800024286 ro o Proposed Date of Completion: - 31 January 2023 a:: Q) Sr. Tasks IActivity Percentage of c ro , .:.t:. No. (2) Actual Work Done ro (1) (3) Z 1 Excavation 100% 2 Basement (If Any) --NA-- 3 number of Podiums (If Any) --NA-- 4 ONE Plinth 100% 5 Stilt Floor 100% hva G.uDay ..... Page 1 of 2 6 Three number of Slabs of Super Structure 100% Internal Walls, Internal Plaster, Floorings, Doors and Windows within 7 each of the Flats/Premises. 100% 8 Sanitary Fittings, Electrical Fittings within the each Flat/Premises. 100% Staircases, Lifts Wells and Lobbies at each Floor level, Overhead and 9 Underground Water Tanks. 100% The external plumbing and external plaster, elevation, completion of 10 terraces with waterproofing of the Building/Wing. 100% Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing 11 to entrance lobby/s, plinth protection, paving of areas appurtenant to 100% Building/Wing, Compound Wall and all other requirements as may be required to obtain Occupation / Completion Certificate and complete project as per specifications in the Agreement of Sale. Any Other Activities. TABLE-B Common areas (Internal and External Development Works) in respect of the Registered Phase / Project Number. Sr. Common areas and Proposed Percentage of Details No. Facilities, Amenities (Yes/No) Actual Work done (5) (1) (2) (3) (4) 1 Internal Roads & Footpaths NO --NA-- --NA-- 2 Water Supply YES 100% Completed 3 Sewerage YES 100 % Completed (chamber, lines, Septic Tank, STP). 4 Storm Water Drains NO --NA-- --NA-- 5 Landscaping & Number of YES 100 % Completed FIVE Tree Plantation. 6 Street Lighting NO --NA-- --NA-- 7 Community Buildings NO --NA-- --NA-- 8 Treatment and disposal of --NA-- NO --NA-- I sewage and sullage water. 9 Solid Waste management & NO --NA-- --NA-- Disposal. 10 Water conservation, YES 100 % Completed Rain water harvesting. 11 Energy management NO --NA-- --NA-- 12 Fire protection and fire NO --NA-- --NA-- safety requirements. '13 Electrical Meter Room, Sub- Wooden Box Frame for YES 100% Station, Receiving Station. Electric Meters 14 Lift YES 100 % Completed 15 Others (Option to Add more). NO --NA-- --NA-- Yours FaithfullY,Eng.PARAG S.AHIRE D.C.E. & B.E.CIVIL Consulting Eng.& Gov.Contractor Deopur DHULE.(Reg.No.145) Agreed and Accepted by M . GS.AHlRE Eng.PARAG S.AHIRE (License No. CA/2018/96038) Name:-PARAG~ I Date: - 06 C1}f'29'2-'2- Page 20f2