PARAG S. AHIRE Builder s: Developer Building a Better Life! ISO: 2015 Annexure -A ~ ~ q~ ~Gilc1lC'1 m, tl5m 31111'tlll Cf)g ! FORM 1 [ see Regulation 3] ARCHITECT'S CERTIFICATE :::J (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) .n To, Date 03} o I I ?-~'2..1 ~ ..c Parag Subhash Ahire, I ~ Plot No. 103, Suprabhat, Near Patil Nagar, Nekane Road, Dhule, 424002. -5 ttl Q. Subject: Certificate of Percentage of Completion of Construction Work of Padmashree Residency VI situated at Mauje Dhule Shiwar, Station Road, Dhule 424001 on the Plot bearing GAT No. I E CTS I Survey No. 551/A/220/24 Final Plot No. 24 having Maha-RERA Registration Number 8...: Q) P49800024286 being developed by Parag Subhash Ahire. "C :::J .n Sir, II We Mr. Parag Subhash Ahire have undertaken assignment as Architect /Licensed Q) ~ Surveyor of certifying Percentage of Completion of Construction Work of project name s: en ttl Padmashree Residency VI having Maha-RERA Registration Number P49800024286 being E "C developed by Parag Subhash Ahire. ttl Q. Based on Site Inspection, with respect to the Layout I Each Number of Building I Wing of the ~ aforesaid Real Estate Project, I certify that as on the date of this certificate, the SIXTY Percentage of Work Done for each ofthe Layout I Number of Building I Wing ofthe Real Estate Project is N o as per Table - A herein below and the percentage of the work executed with respect to each of o -q- the activity of the entire phase is detailed in Table B. N -q- .!l2 :::J TABLE-A ..c (To be prepared separately for each Layout / Building / Wing Number of the project) o ..: Building Name: - PADMASHREE RESIDENCYVI :::J Building Number I Wing: - Q. --- o Q) Date of RERA Registration: - 03 February 2020 o "C RERA Registration Number: - P49800024286 ttl o Proposed Date of Completion: - 31 January 2023 0::: Q) Sr. Tasks I Activity Percentage of C ttl No. (2) Actual Work Done ::t:. ttl (1) (3) Z ..: 1 Excavation 100 % ttl oi 2 Basement (If Any) --NA-- ttl Z 3 number of Podiums (If Any) --NA-- ONE Plinth ~ 4 100% ttl ..c 5 Stilt Floor 80% CO hva G.uDay" ... Page 1 Of2 6 Three number of Slabs of Super Structure 100% Internal Walls, Internal Plaster, Floorings, Doors and Windows within 7 each of the Flats/Premises. 40% 8 Sanitary Fittings, Electrical Fittings within the each Flat/Premises. 0% Staircases, Lifts Wells and Lobbies at each Floor level, Overhead and 9 Underground Water Tanks. 50% The external plumbing and external plaster, elevation, completion of 10 terraces with waterproofing of the Building/Wing. 0% Installation oflifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing 11 to entrance lobby/s, plinth protection, paving of areas appurtenant to 0% Building/Wing, Compound Wall and all other requirements as may be required to obtain Occupation / Completion Certificate and complete project as per specifications in the Agreement of Sale. Any Other Activities. TABLE-B Common areas (Internal and External Development Works) in respect of the Registered Phase / Project Number. Sr. Common areas and Proposed Percentage of Details No. Facilities, Amenities (Yes/No) Actual Work done (5) (1) (2) (3) (4) 1 Internal Roads & Footpaths NO --NA-- --NA-- 2 Water Supply YES 0% In Progress 3 Sewerage YES 0% In Progress (chamber, lines, Septic Tank, STP). 4 Storm Water Drains NO --NA-- --NA-- 5 Landscaping & Number of YES 50% In Progress FIVE Tree Plantation. 6 Street Lighting NO --NA-- --NA-- 7 Community Buildings NO --NA-- --NA-- 8 Treatment and disposal of --NA-- NO --NA-- sewage and sullage water. 9 Solid Waste management & NO --NA-- --NA-- Disposal. 10 Water conservation, YES 0% In Progress I Rain water harvesting. 11 Energy management NO --NA-- --NA-- 12 Fire protection and fire NO --NA-- --NA-- safety requirements. 13 Electrical Meter Room, Sub- YES 0% Wooden Box Frame for Station, Receiving Station. Electric Meters 14 Lift YES 0% In Progress 15 Others (Option to Add more). NO --NA-- --NA-- Yours Fait~fully, Eng.PARAG S.AHIRE .) C.!.:. s B.E.CIVIL Consurtmq Eng.& Gov.Contractor ,.!\greed and Accepted b_y HIĀ£(opur DHULE.(Reg.No.14S) -, ~J.PARAG S.AHIRE (License No. CA/2018/96038) Name: - PARAG~~ Date: - 0'3 I o l I Q_j)Q '2..- Page 2 of z