PARAG S. AHIRE Builder & Developer Building a Better Life! ISO: 2015 ~ ~ q~ fdGiI<1<)IC1 CR, Annexure -A Q5m 311l"f'alICbg ! FORM 1 [ see Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) To, Date 0 !;'1, (7 ) ~( Parag Subhash Ahire, Plot No. 103, Suprabhat, Near Patil Nagar, Nekane Road, Dhule, 424002. Subject: Certificate of Percentage of Completion of Construction Work of Padmashree Residency VI situated at Mauje Dhule Shiwar, Station Road, Dhule 424001 on the Plot bearing GAT No. / E CTS / Survey No. 551/ A/220/24 Final Plot No. 24 having Maha-RERA Registration Number 8...: Q) P49800024286 being developed by Parag Subhash Ahire. ::E ·s .0 Sir, I/ We Mr. Parag Subhash Ahire have undertaken assignment as Architect /Licensed Q) ~ Surveyor of certifying Percentage of Completion of Construction Work of project name s: II) C13 Padmashree Residency VI having Maha-RERA Registration Number P49800024286 being E "0 developed by Parag Subhash Ahire. C13 a. Based on Site Inspection, with respect to the Layout / Each Number of Building / Wing of the ~ aforesaid Real Estate Project, I certify that as on the date of this certificate, the FOURTY Percentage of Work Done for each of the Layout / Number of Building / Wing ofthe Real Estate N o Project is as per Table - A herein below and the percentage of the work executed with respect to o -.:t each of the activity of the entire phase is detailed in Table B. N -.:t Q) TABLE-A :::::l .£:; (To be prepared separately for each Layout / Building / Wing Number of the project) o Building Name: - PADMASHREE RESIDENCYVI ..: :::::l --- a. Building Number / Wing: - o Q) Date of RERA Registration: - 03 February 2020 o RERA Registration Number: - P49800024286 "0 C13 o Proposed Date of Completion: - 31 January 2023 0::: Q) Sr. Tasks / Activity Percentage of c C13 No. (2) Actual Work Done ~ C13 (1) (3) Z ..: 1 Excavation 100 % C13 0> 2 Basement(If Any) --NA-- C13 Z 3 number of Podiums(If Any) --NA-- 4 ONEPlinth 100% 5 StiltFloor 60% hva G.uDay ..... ,lj Page 1 of 2 - 6 Three number of Slabs of Super Structure 80% Internal Walls, Internal Plaster, Floorings, Doors and Windows within 7 each of the Flats/Premises. 0% 8 Sanitary Fittings, Electrical Fittings within the each Flat/Premises. 0% Staircases, Lifts Wells and Lobbies at each Floor level, Overhead and 9 Underground Water Tanks. 50% The external plumbing and external plaster, elevation, completion of 10 terraces with waterproofing of the Building/Wing. 0% Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing 11 to entrance lobby/s, plinth protection, paving of areas appurtenant to 0% Building/Wing, Compound Wall and all other requirements as may be required to obtain Occupation / Completion Certificate and complete project as per specifications in the Agreement of Sale. Any Other Activities. TABLE-B Common areas (Internal and External Development Works) in respect of the Registered Phase / Project Number. Sr. Common areas and Proposed Percentage of Details No. Facilities, Amenities (Yes/No) Actual Work done (5) (1) (2) (3) (4) 1 Internal Roads & Footpaths NO --NA-- --NA-- 2 Water Supply YES 0% In Progress 3 Sewerage YES 0% In Progress (chamber, lines, Septic Tank, STP). 4 Storm Water Drains NO --NA-- --NA-- 5 Landscaping & Number of YES 50% In Progress FIVE Tree Plantation. 6 Street Lighting NO --NA-- --NA-- 7 Community Buildings NO --NA-- --NA-- 8 Treatment and disposal of NO --NA-- --NA-- sewage and sullage water. 9 Solid Waste management & NO --NA-- --NA-- Disposal. 10 Water conservation, YES 0% In Progress Rain water harvesting. 11 Energy management NO --NA-- --NA-- 12 Fire protection and fire NO --NA-- --NA-- safety requirements. 13 Electrical Meter Room, Sub- Wooden Box Frame for YES 0% Station, Receiving Station. Electric Meters 14 Lift YES 0% In Progress 15 Others (Option to Add more). NO --NA-- --NA-- Yours Faithfully, Eng.PARAG S.AHIRE D.C.E. & B.E.CIVIL Consulting Eng.& Gov.Contractor Deopur DHULE.(Reg.No.145) Agreed and Accepted by . GS.AHlRE Eng.PARAG S.AHIRE (License No. CA/2018/96038) Name: - PARAG~ Date: - 0 ~~O /'i