PARAG S. AHIRE Builder.& Developer Building a Better Life! ISO: 2015 ~~q~ ~G:tlffi(1 tR, Annexure - A qyro 3lISOl1:llId5g ! FORM 1 [ see Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designate~ Account) To, Date (!)L1I~V Parag Subhash Ahire, Plot No. 103, Suprabhat, Near Patil Nagar, Nekane Road, Dhule, 424002. Subject: Certificate of Percentage of Completion of Construction Work of Padmashree Residency VI situated at Mauje Dhule Shiwar, Station Road, Dhule 424001 on the Plot bearing GAT No. I E CTS I Survey No. 5511A/220/24 Final Plot No. 24 having Maha-RERA Registration Number 8...: Q) P49800024286 being developed by Parag Subhash Ahire. '0 ::J _Q Sir, II We Mr. Parag Subhash Ahire have undertaken assignment as Architect /Licensed Q) ~ Surveyor of certifying Percentage of Completion of Construction Work of project name .c I/) Padmashree Residency VI having Maha-RERA Registration Number P49800024286 being co E '0 developed by Parag Subhash Ahire. co a. Based on Site Inspection, with respect to the Layout I Each Number of Building I Wing of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the ZERO Percentage i of Work Done for each of the Layout I Number of Building I Wing of the Real Estate Project is . ,N o as per Table - A herein below and the percentage of the work executed with respect to each of 0 -.;t the activity of the entire phase is detailed in Table B. ,-.;tN ~ TABLE-A ::J .c (To be prepared separately for each Layout / Building / Wing Number of the project) o .._- Building Name: - PADMASHREE RESIDENCYVI ::J a. Building Number I Wing: - --- o -Q) Date of RERA Registration: - 03 February 2020 0' '0 RERA Registration Number: - P49800024286 co -0 Proposed Date of Completion: - 31 January 2023 0:: Q) Sr. Tasks I Activity Percentage of c No. (2) , - Actual Work Done .sco (1) (3) Z .._- 1 Excavation 0% co 0> 2 Basement (If Any) --NA-- co Z 3 number of Podiums (If Any) --NA-- 4 ONE Plinth 0% 5 Stilt Floor 0% hva G,uDay."" Page 1 of 2 6 Three number of Slabs of Super Structure 0% Internal Walls, Internal Plaster, Floorings, Doors and Windows within 7 0% each of the FlatsLPremises. 8 Sanitary Fittings, Electrical Fittings within the each Flat/Premises. 0% Staircases, Lifts Wells and Lobbies at each Floor level, Overhead and 9 0% Underground Water Tanks. The external plumbing and external plaster, elevation, completion of 10 terraces with waterproofing of the Building/Wing. 0% Installation oflifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipmenL, Compliance to conditions of environment /CRZ NOC, Finishing 11 to entrance lobby/s, plinth protection, paving of areas appurtenant to 0% Building/Wing, Compound Wall ane! all other requirements as may be required to obtain Occupation / Completion Certificate and complete project as per specifications in the Agreement of Sale. Any Other Activities. TABLE-B Common areas (Internal and External Development Works) in respect of the Registered Phase / Project Number. Sr. Common areas and Proposed Percentage of Details No. Facilities, Amenities (Yes/No) Actual Work done (5) (1) (2) (3) (4) 1 Internal Roads & Footpaths NO --NA-- --NA-- 2 Water Supply YES 0% In Progress 3 Sewerage YES 0% In Progress (chamber, lines, Septic Tank, STP). 4 Storm Water Drains NO --NA-- --NA-- 5 Landscaping & Number of YES 0% In Progress FIVE Tree Plantation. 6 Street Lighting NO --NA-- --NA-- 7 Community Buildings NO --NA-- --NA-- 8 Treatment and disposal of NO --NA-- --NA-- sewage and sullage water. 9 Solid Waste management & NO --NA-- --NA-- Disposal. 10 Water conservation, YES 0% In Progress Rain water harvesting. 11 Energy management NO --NA-- --NA-- 12 Fire protection and fire NO --NA-- --NA-- safety requirements. 13 Electrical Meter Room, Sub- Wooden Box Frame for YES 0% Station, Receiving Station. Electric Meters 14 Lift YES 0% In Progress 15 Others (Option to Add more). NO --NA-- --NA-- Yours Faithfully, Eng.PARAG S.AHIRE O.C.E. & B.E.CIVIL Consulting Eng.& Gov.Contractor Oeopur DHULE.(Reg.No.145) Agreed and Accepted by AHIRE Eng.PARAG S.AHIRE (License No. CA/2018/96038) .~ Name: - PARAGSUBHASHAHIRE Date: - a Lt I(}71-( W'l- e> Page 2 Of2