PARAG S. AHIRE Builder & Developer ~ BUILDERS Building a Better Life! 180:2015 ~ ~ cr ~ ~G"fI co 2 Z 3 number of Podiums (If Any) --NA-- 4 ONE Plinth 0% 5 Stilt Floor 0% hva G.uDay ..... Page 1 of 2 6 Three number o(Slabs of Super Structure 0% Internal Walls, Internal Plaster, Floorings, Doors and Windows within 7 each ofthe _Flats/Premises. 0% 8 Sanitary Fittings, Electrical Fittings within the each Flat/Premises. 0% Staircases, Lifts Wells and Lobbies at each Floor level, Overhead and 9 Underground Water Tanks. 0% The external plumbing and external plaster, elevation, completion of 10 terraces with waterproofing of the Building/Wing. 0% Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing 11 to entrance lobby/s, plinth protection, paving of areas appurtenant to 0% Building/Wing, Compound Wall and all other requirements as may be required to obtain Occupation / Completion Certificate and complete project as per specifications in the Agreement of Sale. Any Other Activities. TABLE-B Common areas (Internal and External Development Works) in respect of the Registered Phase / Project Number. Sr. Common areas and Proposed Percentage of Details No. Facilities, Amenities (Yes/No) Actual Work done (5) (1) (2) (3) (4) 1 Internal Roads & Footpaths NO --NA-- --NA-- 2 Water Supply YES 0% In Progress 3 Sewerage YES 0% In Progress (chamber, lines, Septic Tank, STP). 4 Storm Water Drains NO --NA-- --NA-- 5 Landscaping & Number of YES 0% In Progress FIVE Tree Plantation. 6 Street Lightin_g_ NO --NA-- --NA-- 7 Community Buildings NO --NA-- --NA-- 8 Treatment and disposal of NO --NA-- --NA-- sewage and sullage water. 9 Solid Waste management & NO --NA-- --NA-- Disposal. -,_--- 10 Water conservation, YES 0% In Progress Rain water harvesting. 11 Energy management NO --NA-- --NA-- 12 Fire protection and fire NO --NA-- --NA-- safety requirements. 13 Electrical Meter Room, Sub- Wooden Box Frame for YES 0% Station, Receiving Station. Electric Meters 14 Lift YES 0% In Progress 15 Others (Option to Add more). NO --NA-- --NA-- Yours Faithfully, Eng.PARAG S.AHIRE D.C.E. & B.E.CIVIL onsulting Eng.& Gov.Contractor Deopur DHULE.(Reg.No.145) Agreed and Accepted by MR -fIRE Eng.PARAG S.AHIRE (License No. CA/2018/96038) Name: - PARAGS~ Date: - () siOL{) 0-0W Page 2 of 2