Stamps of Approval of plan RESIDENTIAL FSI AREA BALCONY (15%) TERRACE (20%) LIFT TOTAL Signature Not Verified BUILDING FLOORS COMM. RESI. IND. SPECIAL MEZZ. PERM. PROP. EXCESS PERM. PROP. EXCESS FSIAREA RESIDENTIAL GROUND FLOOR 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 RESIDENTIAL STILTED GROUND FIRST SECOND FLOOR 0.00 454.08 0.00 0.00 0.00 68.11 97.80 29.69 90.82 0.00 0.00 5.40 483.77 D2 FLOOR WISE BUILT UP AREA - Total RESIDENTIAL 0.00 454.08 0.00 0.00 0.00 68.11 97.80 29.69 90.82 0.00 0.00 5.40 483.77 BALCONY CALCULATION IN SQ.MT Digitally signed by SHAIKH AZIZ FLOORS Flat No. Flat Type B/up Area + Bal. In Sq.Mt Total Tene. Above 80 Total Tene. 40 To 80 Total Tene. Up To 40 RESIDENTIAL FLOOR SQ.M. NO. AREA KARIM STILTED GROUND FIRST SECOND FLOOR 4 3 2BHK 2BHK 32.78 32.78 0.00 0.00 12.00 STILTED GROUND FIRST 2.78 SECOND 1 1.00x3.00 FLOOR 1 2.78 3.00 Date: 2019.11.05 12:21:42 IST 2 1 2BHK 2BHK 32.78 32.78 2.95x0.81 2.78 1 1 2.37 2.78 Reason: Approved Drawing Plan TOTAL 0.00 0.00 12.00 1.00x3.00 1 3.00 Location: Dhule Municipal 2.95x0.81 2.78 1 1 2.37 2.78 Corporation 1.00x3.00 1 3.00 CARPET AREA CALCULATIONS CARPET AREA CALCULATIONS CARPET AREA CALCULATIONS CARPET AREA CALCULATIONS 2.95x0.81 1 2.37 EXCLUDING OPEN BALCONY & TERRACES EXCLUDING OPEN BALCONY & TERRACES EXCLUDING OPEN BALCONY & TERRACES EXCLUDING OPEN BALCONY & TERRACES 2.78 1 2.78 FLAT NOS ROOMS AREA CARPET AREA FLAT NOS ROOMS AREA CARPET AREA FLAT NOS ROOMS AREA CARPET AREA FLAT NOS ROOMS AREA CARPET AREA 1.00x3.00 1 3.00 2BHK-4 TOILET 2.87 32.52 2BHK-3 TOILET 2.87 32.52 2BHK-2 TOILET 2.87 32.52 2BHK-1 BEDROOM 7.58 32.52 2.95x0.81 1 2.37 KITCHEN 6.16 KITCHEN 6.16 KITCHEN 6.16 TOILET 2.87 STUDYROOM 6.24 STUDYROOM 6.24 STUDYROOM 6.24 KITCHEN 6.16 TOTAL = 32.63 BEDROOM 7.58 BEDROOM 7.58 BEDROOM 7.58 STUDYROOM 6.24 HALL 9.66 HALL 9.66 HALL 9.66 HALL 9.66 ARCH.PROJ. W2 W2 W2 W2 SP SP SP SP SP D1 D1 W1 W1 CP CP BicycleBicycleBicycleBicycleBicycleBicycleBicycle D1 D1 D1 D1 D1 D1 SP SP V V D2 D2 SP SP D1 D1 CP CP BUILT UP AREA CALCULATION SP Bicycle Bicycle SP FOR STILTED GROUND FIRST SECOND FLOOR RESIDENTIAL D D Bicycle Bicycle PROPOSED AREA NAME LENGTH WIDTH Area(Sq.M) CONSTRUCTION 25.30 PARKING SP SP D D BLOCK 11.68 19.30 225.42 Bicycle Bicycle W1 ON P. NO.220/24 CP CP BLOCK AREA TOTAL =225.42Sq.M SP SP Bicycle Bicycle D DEDUCTION D2 D1 D1 D2 D-1 --> --> 2.54 V V D1 D1 D-2 --> --> 2.54 SP SP BicycleBicycle SP SP Bicycle W2 D-3 --> --> 2.54 D1 BicycleBicycle Bicycle D1 D1 D1 D1 D-4 --> --> 2.54 SP SP SP SP BicycleBicycle DUCT0 1.29 1.70 2.19 Bicycle W1 W1 SC(P)0 2.64 3.20 8.45 SP SP BicycleBicycle SP SP Bicycle D1 W2 W2 D1 PASS(P)0 --> --> 18.88 LEGENDS: W2 W2 LIFT(R)0 1.20 1.50 1.80 PLOT BOUNDRY SHOWN WHITE PROPOSED WORK SHOWN RED ARCH.PROJ. TOTAL =41.46Sq.M DRAINAGE LINE SHOWN YELLOW LIGHT WATER LINE SHOWN BLUE DOTTED Open Balcony Deduction ENCLOSED BAL SHOWN BROWN TERRACE SHOWN DARK YELLOW BAL0 --> --> 2.78 OPEN BAL SHOWN BRAWN BAL1 1.00 3.00 3.00 EXSTING SHOWN BLUE HATCHED 7.62 M. WIDE ROAD BAL2 2.95 0.81 2.37 CERTIFICATE OF AREA CERTIFIED THAT THE PLOT UNDER REFERENCE WAS BAL3 --> --> 2.78 SERVEYED BY ME ON -- / / AND THE DIAMENSIONS OF SIDES etc. OF PLOT STATED ARE MEASURE ON SITE AND THE AREA SO WORKED OUT TALLIES WITH BAL4 1.00 3.00 3.00 THE AREA STATED IN BAL5 2.95 0.81 2.37 DOCUMENT OF OWNERSHIP / T.P SCHEME RECORD / LAND RECORD / CITY SURVEY RECORDS. N BAL6 --> --> 2.78 NAME OF DEVELOPER: PARAG SUBHASH AHIRE Address - DHULE BAL7 1.00 3.00 3.00 Plot No - 220/24 Phone No. - 9404572639 BAL8 2.95 0.81 2.37 DESCRIPTION OF PROJECT : BAL9 --> --> 2.78 PROPOSAL NO.- 1 PROPOSED RESIDENTIAL BAL10 1.00 3.00 3.00 BUILDING ON CTS. NO./SURVEY NO.- 220 BAL11 2.95 0.81 2.37 TAL. DHULE MUNICIPAL CORPORATION NAME OF ARCHITECT: ER PARAG S AHIRE TOTAL =32.63Sq.M LOGO OF ARCHITECT ADDRESS OF OFFICE SCHEDULE OF OPENING: Total Deduction =74.09Sq.M OFFICE : DHULE Net BuiltUp Area=151.34Sq.M NAME LENGTH HEIGHT NOS. D 1.20 2.10 8 OWNERS SIGN: ARCHITECTS SIGN: D1 0.90 2.10 12 PARKING STATEMENT D2 0.75 2.10 4 MANHOLE TENAMENT PARKING NO.OF REQUIRED PROPOSED FREE BOARD SUMP WELL 18000 LITRES CAPACITY. AREA RATIO TENA. PARKING PARKING INLET BAFFLE OUTLET SCHEDULE OF OPENING: FOR 4 TENA. BELOW 40 S.MT. M.S.GATE BK.WALL P.C.C. SECTION THROUGH WATER STORAGE REQUIREMENT PREMIUM STATEMENT 1:5:5 12.00 3:15:15 -- CROSS SECTION U. WATER TANK. OVER HEAD WATER TANK REQUIRED NAME LENGTH HEIGHT NOS. SCALE: 100 12 TENAMENT = 12X 5 PERSON X 135.0 Ltr. VISITOR PARKING (5%) P.C.C.COPING = 8100.00 Ltr. S.NO. DESCRIPTION AREA SCALE 1:100 100 0:0:0 0.00 1:1:1 -- VENT PIPE .23 thk.BK.WALL V 0.60 1.20 4 1.50 0.25thk.BK.WALL GL. MANHOLE 1. TOTAL PAID F.S.I. CONSUMED 0.00 -- ST_WID .45 thk.STONE WALL. UNDER GR. WATER TANK REQUIRED W1 1.80 1.20 8 P.C.C. STUDY OUTLET = 8100.00 Ltr. X 1.5 = 12150.00 Ltr. JOB No. JobNO chkby PROPOSED - O.H.W.T = 15000.00 LTS. 2. TOTAL ENCLOSED BALCONY 0.00 -- COMPOUND WALL PLAN OF UNDERGROUND W2 1.20 1.20 8 DETAIL INLET ST_LEN WATER STORAGE TANK U.G.W.T. = 15000.00 LTS. 3. TOTAL PROPOSED TERRACE 0.00 TOTAL 4:16:16 6:27:27 SCALE: 100 SEPTIC TANK DETAIL SCALE: 100 SCALE: 100 S U B M I S S I O N D R A W I N G