Annexure B FORM 2 [see Regulation 3] ENGINEER'S CERTIFICATE fi'om (To be submitted at the time of Registration of Ongoing Project and for withdrawal of lVloney Designated Account-Project Wise) Date: I glal lZclzS To, Yogesh Pramodshankar Desai Nand urbar, MAHARASHTRA,42B41 2 Registration subject: certificate of cost lncurred for Development of Ashtavinayak Residency having MahaRERA Number p4g700056003 (oniy Appiicable after project Registartion) being cieveloped by Yogesh Pramodshankar Desai Sir, having llwe shaikh Tanveer shaikh Gaffar have of certifying Estirnated cost for Ashtavinayak Residency being developed by MahaRERA Registration Number p4g700056003 (onty Applicable after project Registration, Yogesh Pramodshankar Desai ) the apartments and 2.We have Estimated the cost of civil, MEP and ailied works required for eompietion of in agreements proportionate completion of internal & external works of the project as per specifications mentioned of sale. Our estimated cost calculations are bassd on the drawingslplans made available to us for the project under quantity required for the entire work as reference by the Developer / Consulatants. The Schedule of items and cost of material,labour and calculated by euantity Surveyor* appointed by Developer/Engineer, the assumption ofthe / confirm the above analysis other inputs made by developer,and the site inspection carried out by us to ascertain given to us. project under reference at Rs. 78959635'00 3, we estimate Total estimated the cost of completion of thc aforesaid reference to thc civil, (Total of rable A and B) at the time of Registration. The estimated rotal cost ofproject is with of internal & external MEp and Allied works required for completion of the apartments and proportionate completion purpose of the obtaining occupation works,as per specifications mentioned in agreements of sale and {or the from the The office of certificate i completion certificate for the Buitding(s) /wing(s)/ Layout /Plotted Deveiopment planning Authority under whose jurisidiction the aforesaid project is Munciple coorporation of Nandurbar being the being implemented. (Total of rable A and B).The amount of 4.The Estimated cost incured till date is calculated at Rs. 33540000.00 and unit cost of these items' Estimated Cost incurred is calculated on the basis of input materials/services used Page I of5 and MEP and Allied works for completion of the apartments 5. The Balance Cost of Completion of the Civil, of sale' of the as per specification mentioned in agreement proportionate comprition of internar & external works, (Total of Table A and B) Project is estimated at Rs 454{9635'00 proportionate ate tnternal & and atied works the for the apartments and 6. r certify that the cost of the civir, MEp prolect as completed on the date in agreement of sare, of the aforesaid externar works,as per specification mentioned of this certificate is as given in Table A and B below: Table-A Building A/NA bearing Number :AshtavinaYak ResidencY Building/ Wing llaYout Plotted DeveloPment Amount (ln Rs.) $r. Nq. 12821628.40 1 TotalEstimated Cost of the Buildin IS on 1 1550000.00 ? rncu as on of 08 of th 3 1271 4 to be rredn" 0 Cost lncu rre d o n the Add itiona llExtra items not included in the 5 Cost Number :AshtavinaYak Resi B/NA Building/ Wing Plotted DeveloPment Amount (ln Rsl- 12821628.40 1 TotalEstimated Cost of the Buil on 11207000.00 2 asond of ce 87.41 done in AS of the 3 161 00 4 be rred"* 0 Cos t lncurred on the Add itional/Extra items not included in the 5 ResidencY Building C/NA Buildingi Plotted DeveloPment bearing Number :AshtavinaYak Amount (ln Rs') 12821628.00 1 Total Estimated Cost of the on on IS 8033000.0c a Cost rred date .65 Work in of the 3 4788628.00 Cost to ln on 4 0 included in the 5 Cost lncu rred on the Addit ional/Extra items not Cost Ptotted DeveloPment bea Number :AshtavinaYak ResidencY Building D/NA Building/ Amount {ln Rs.) Sr. No. 12821628.00 1 Total Estimated Cost of the AS S 2750000.00 2 AS date of cate 45 in esti cost 3 10071628.00 4 Cost to lncu on Esti 0 Co st lncurred on the Additiona l/Extra items not included in the 5 Cost Plotted DeveioPment Number :AshtavinaYak ResidencY Building E/NA Building/ Win Amount (ln Rsl- Sr. No. 26150723.00 1 T otal Estimated Cost of the is nt on date 0 2 Cost i rred date 0 of esti cost 3 ln Page 2 of 5 4 lncurred on the AdditionallExtra items not included in the 5 Page 3 of 5 Table B Phase lnternal and External Development Works in resPect of the Amount (ln Rs') Sr. No. 1522400.00 1 Esti mated Cost of the Build on 0 2 as in of the J 1 00 4 to in the 5 Cost lncurred on the Add itionallExtra items not included Yamvee." Sfu**k$"e s*;,*urrin* onf JffIL-- &icenc:* - $t*tql[it*?di'l 3*71, SHAIKH TANVEER SHAIKH GAFFA&aneiurbar t*io"- 6+ri*4 3,i u$g of Engineer Signatur"e & Name (lN BLOCK LETTERS)with Stamp per scction 2(u) of thc Act] [Not Less than bachelor's Degree Holder or equivalent as (if appi icable) Local Authority license no. STATEIRI/2024/APL/1 3675 .*@,, Date of Certificate:l9lt:l>;25 Y' Asreed and Accepted bv-: yOGESH I)ISAI f l PRoMoTER hsnrnvtrtrnynKRES|DENCY signatureofPromoter Name: Yogesh Pramodshankar Desai Date: i 3lr:11.2,d>{ 1.The scope of work is to complete Registered Real Estate Project as per drawings approved from time to time and as per specifications mentloned in agreement of sale' done by an independent Quantity Surveyor'whose 2.(*) euantity survey can be done by office of Engineei- or can be by Developei", the name has to be mentioned certificate of In case of independent quantity surveyor being appointed by office of Engineer,the name of the person in the at the place marked (") and in case quantity are being calculated be mentioned at the place marked (.)' office of Engineer, who is responsible for the quantity calculated should Total estimated Cost (1) and Actual 3.(**) Balance Cost to be incurred (4) may vary from Difference between of cost etc. As this is an estimated cost, any Cost incurred (2) due to deviation in quantity required / escalation will result in amendment of the cost deviation in quantity required for development of the Real Estate Project incurred / to be incurred. 4.All components of work with specifications are indicative and not exhaustive Any deviations in input material used from 5.please specify if there are any deviations i qualifications. Example: specifications in agreement of sale. Page 4 of 5 ,) TABLE C in Cost. List of Extra/Additional/Deleted ltems considered of Total Cost) (which were not part of the original Estimate Page 5 of 5