1. Annexure A FOR,IA1 lsee regulation 3l (To be submifted ot the time of registrotion of ongoing projecf ond for withdrowal of money from designoted occount) Dste: tL/O7/?424 To, Mr. Yogesh Pramodshqnkor" Desoi Subjecf: Certificate of Percentage of Completion of Construction Work Ashtovinoyak Rasiciency having rllohoRERA Regisfration Number P4970OO560O3 being deveioped by Y ogesh Pramodshonksr Desoi. 5ir, T/We have undertqken ossignmenf os Architect /Licensed Surveyor of certifying ?ercentage of Complefion of Construction work of nshtavinoyok Residency hoving MahaRERA Registraticn number P49700O560O3 Based on Site inspection, with respect to Lcyout / eachof the Building A,B,C, D snd E Wing of the sforesoid reol estate Project. I certify that os on the dote of this certificote,the?ercentage of Work done for eoch of the building/Wing of the Reol Estate Projecf under MahaRERA is as per Toble A herern below. The percentoge of the work executed with respect to each of the octivity of the enlire phase is cjetoiled in loble B. { BuiidinelNumbe-r- A Toble A To be prepared seporofely for eoch Loyout I Building lWing of the Project 5r. Tqsks / Activify tlo tsJ (1) 1 Excovotion 100% Z Bosarnents (if ony) 100% 3 Podiums (if any) U 4 Plinf h 100% 5 Stilt Flaor LAO% 6 Slobs of Super Structure 6A% 7 Internal walls, fnternol Ploster, Floorings, o% Doors and windows within Flats/Premises I Sonitory Fittings within the Flat /Premises a% I Sfoircoses. Lifts lVells ond Lobbies ot each a% Floor level Overheod and Underground Water Tonks t0 Externsl plumbing ond external ploster, Ulo elevation, completion of terraees with woferproofing of the Building I wing, 11 fnstellation of Lifts. wster pumps, Fire a% Fighting Fittings and Equipment as per CFA NOC, Electricql f ittings, mechonicql equipmenf, complionce to conditions of anvironment/CAZ NOC. Finishing to entrcnce lobby/s. plinth protection, paving of aness appurtencnt to Building / Wing. Compound Wall and oll other requirements as moy be required to complete project cs per specificotions in ogreemant of Sole, Any other octivities. 3 Toble B Common Areos (Internol ond Externol Development Works) in respect of the Registered Phose / Projact Number. 5r. Proposed Pereentage of Actual betoils no (YeslNo) work done (5) (1) (3) (As on dofe of Certif icote) (4) t fnternsl roqds and tr,ln Nil Footpaths 2 Woter Supply Yes o% 3 Sewerage (Chamber lines, Yes o% Septic Tank, STP) hl^ t\l;l 4 Stonm Woter Droins l\li E lr. l^ Landsccping & Tree Nil Plonting 6 Street Liqhtinq No Nil 7 Community Buildings No Nil I Trestment ond disposal No Nil of sewage ond sulloge wsfar v Solid Waste monogenenf No Ntl & Disposal 1n Water conservstion / No Nil Rsin woter horvesting t1 Hnergy Monogement No Nil t2 Fire protection and fire No Nil ssfety requiremants. 13 Electrical meter room, Yes o% sub-stotio n, r eceiving ststion. 14 Others (option to add rnore) i Br.rildinq Nurnber B T-able 4 To be prepored saporotely for eEch Loyout I Building /Wing of the Progeet 5r. Tosks I Activity Percentage of Actuol Work no fi\ \-, Done (as on date of (1) certificote) (3) L Exeovotion lUU /o ? Bosements (if any) 100% 3 Podiums (if any) 0 4 Plinth taa% 5 Stilt Floor 100% 6 Slabs of Super Structure 4A% 7 fnternsl wolls, fnternol Plqster, Floorings, U/o Doors qnd windows within Flqts/Premises 8 Sonitory Fittings within the Flot/Premises o% Y Stoircases. Lifts Wells qnd Lobbies ot eoch Ulo Floor level Averhaod ond Underground Water Tanks 10 External plumbing and extzrnal plaster, o"/^ elevation, completicn of terocas with woferproofing of the Building / wing, 11 fnstsllation of Lifts. woter pumps, Fire a% Fighting Fiftings and Equipment as per CFO NOC, Elactrical f ittings, machonical equiprnent, complicnce to conditions of environment/CRZ NOC. Finishing to efltraRce lobby/s. plinth protaction, paving of areas appurtenont to Building / Wing. Compound Wall ond all other reguirements as moy be required to complete project os per specif ications in agreement of Sola, Any other octivities. t oDle ts Common Areas (Internol ond External Development Works) in respect of the Registereci Phose / Project Number. 5r- Proposed Percentage of Actuol Detoils no (YeslNo) work done (5) (1) (3) (As on date of Certificate) (4) 1 fnternai raqds and No Nil Footpoths 2 Water Suoolv Ye,< a% 5 not ? Sewerage (Chomber lines, Yes vlo Septic Tsnk, STP) t\ l:l +i Storm Woter Droins No l\ll 5 Londscoping &Trae No Nil Planting 6 Street Lighting No Nil 7 Community Buildings No Nil I Treotment ond disposal No Nil of sewoge ond sulloge ulater 9 Solid Waste monagement No Nil & Disposol 10 Woter conservotion 1 No Nil Rein water harvesting 1L Energy Monogement No Nil L2 Fira protection ond fire No Nil sofety requirements. 13 Electricoi meler room, Yes 0% sub-stotr o n, r eceiv tng ststion. 1A il+ Cfhers (option to odd more) Buildino Number C Toble A To be pregored separately for aach Loyout I Building /Wing of the Praject.) Sr. Tasks / Activity Percentage of Actuol Work no t2) Done (os on dote of (1) certif icote) ,r\ tiU 1 I Excavstion 1003 ? Basements (if any) LA0% 3 Podiums (if cny) 0 4 Plinth rco% 5 Stilt Floor 100% 6 Slabs of Super Structure ?a% 7 fnternol wolls, fnternal Ploster. Floorings, a% Doors cnd windows within Flats/Premises I Sanitary Fittings witlrin the Flat /Premises taol ll lo o Sfcircoses. Lifts Wells and Lobbies ct eqch lJlo Floor level Overheod ond Underground Water Tanks 6 iU Externol plumbing ond external plaster, a% elevstion, completion of terroces with wqtarproofing of the Building / wing, 44 11 Instollation of Lifts. water pumps, Fire o% Fighting Fittings ond Equipmenf os per CFO NOC, Eleetrical f ittings, mechqnical equipment, compliance to conditions of environme nt / CPZ NOC. Fi nishing to entrance lobby/s. plinth protaction, poving of areos oppurtencnt to Building / Wing. Compound Wqll qnd all other reguirements as may be required to complete projact as per specificaticns in agreemer* of Sala, Any other octivities. Tqble B Common Areas (Internol and Externol bevelopment Works) in respect of the Registered / Phose Project Number. 5r" Common Areos ond facilities Proposed Detoils RO (?) (YeslNo) (5) 1,. ,, t5J 1 Inte,rnal roads and No Nil Footpaths ? Woier Supply Yes U7" J Sewerage (Chamber lines, Yes a% Septic Tank, STP) 4 Storm Woter Drains No Nil 5 Londscoping & Tree No Nil Plonting 6 Street Lighting No Nil 7 Community Buildings No Nil 8 Trectment ond disposal No Nil of sewage anci suiioge water Solid Waste management No Ntil & Disposal 10 Woter conservotion 1 No Nil Roin water harvesting 11 Energy fulanogemenf No Nil t2 Fire protection and fire No Nil safety requirements. 7 13 Electricol meter room, Yes a% sub-statio n, receiving stqtion. L4 Others (option to qdd more) Building Number D Toble A To be prepared seporotely for eoch Loyout / Building /Wing of the Project 5r- Tosks / Percentoge of Actual Work no Done (as on dote of (1) certificote) (3) t Excavstien toa% /- Bosements (if ony) 100% 3 Podiums (if any) 0 4 Plinth 100% E Stilt Floor 100% o Slobs of Super Structure a% 7 Internal wolls, fnternal Plqster, Floorings, a% Doors ond winciows within FlatslPremises R Sonitory Fittings within the Flqt/Premises o% I Stcirccses. Lifts Walls and Lobbies qf each a% Floor level Overhead ond Underground Woter Tanks 10 Extarnal plumbing ond external plcster, a% elevqtion, completion of terraces with uroterproof ing of the Building I wing, _ 1L fnsfollotion of Lifts. water pumPs, Fire 0% Fighting Fittings cnd Equipment es per CFO NOC, Electrical fiftings, mechqnical equipment, complicnca to conditions of environment/CPZ NOC. Finishing to entronce lobby/s. plinth protection, poving of areas oppurtenont to Building I Wing. Compound Woll and all other requirements as moy be required to complete project as per specificstions in ogreement of Sole, Any other cetivities. 8 tit I oDle ts Common Arecs (Internal and Externql Development Works) in raspect of the Registered Phose I Prajzct Number. 5r. Common Areos ond focilities Proposed Percentogz of Actual betails no {2) {YeslNo) work done (5) (1) (s) (As on dote of Certif,ieote) /d\ tq 1 fnternal rocds qnd No Nil Footpoths 2 Woter Supply Yes o% 5 Sawerage (Chamber lines, Yes a% Septic Tonk, SfP) 4 Storm Water Droins No Nil 5 Landseoping & Trea No Nil Plonting 6 Streat Lightinq No Nil 7 Community Buildings No Nil 8 Treatment and disposol No Nil of sewage ond sullaga water I Solid Wqsta monogemenf No Nrl & Disposol 1\J Wster eonservction r' No Nii Rain water harvesting. TL Enerqy Manogement No Nil L2 Fire protection snd fire No Nil safaty requiraments. 13 Electrical meter room" Yes Vlo sub-stqti o n, r eceiving stotion. L4 Others (option to qdd n'icnei a Building Number E Table A Tobe prepored separately for eoch Loyou? / Building /I{ling of the Project.) 5r Tasks I Activity Percentage of Actuol Work no t2) Done (as on dote of (1) certificate) /2\ tJ, 1 Excavotion o% 2 Basements (if any) a% 3 Podiums (if U + Plinth a% 6 Stilt Floor a% A Slobs of Super Struc?ure a% 7 Internol utolls, fnternql Plaster, Floorings. Ulo Doors ond windows within Flats/Prernises I Sanitq Firti within the Flqt/P remises 0% I Stoircoses. Lifts Wells ond Lobbies ot eoch o% Floor level Overhead and Underground Water Tqnks tu External plumbing and externol ploster, 0% elevotion, completion of teraces with waterproofing of the Building / wing, 11 fnstollotion of Lifts. wqter puffips, Fire - a% Fighting Fittings ond Eguipment as per CFA NOC, Electrical fittings, mechqnicol equipment, cornplionce to conditions of environment/CHZ NOC. Finishing to entrance lobby/s. plinth protection, poving of araas cppurtenont to Building / Wing. Compound Woll ond oll other requiremants os msy be required to complete projact as per spacifications in agreement of Sole, Any other activities. {{$ui}i.s..$ i u*nipit3 liw53 qnltlueri*3 : :il,df$Eeg8 ".ffi r;JrilhEr.+i$ i 1n Toble B Common Areas (Internot and External Development Works) in respect of the Registered Phose / Project Number. 5r" Common Areos and focilities Proposed Percentage of Actuol Defoils no (2) (YeslNo) work done (1i (sj (As on riote of Certificote) (4) 1 Internol roods qnd No Nil Fooipoths c. Water Supply Yes o% 3 Sawerage (Chomber linas, Yes a% Septic Tenk, ST?) 4 Storm Woter Drqins No Nil 5 Landscoping &Tree No Nil Plonting 6 Street Lighting No Nil 7 Community Buildings No Nil e I Treotment qnd disposol No Nil of sewoge anci sulloge woter Y Solid Ulcste moncgement No Nil & Disposcl 10 Water conservotion / No Nil Rcin wctar harvasting. 11 Energy Monogement No Ntl t2 Fire protection ond fire No Nil safef requirements. t5 Eiectricol meter room, Yes a% sub-sfotio n, receiving statian. 14 Others (option to odd more) Yours foithfully, v Signoture ond Nome of Arch Agreed ond Accepted by Tanveer Shaikh B.E.(CMl) s59 YOGISTI DESAI kh Gaffor PROMOTER ASHTAVINAYAK RESIDENCY Address: Ghodopir Mohollo, Nondurbor Signature of Promoter Aacihar No.: 2691 1398 0753 Nome: Yogesh Promodshonkor Desoi Pon No: IROP55510L Date:i0107/2024