l ANNEXURE A FORM-ZA [See Regulation 3A.] ENGINEER'S CERTIFICAT E FOR QUALITY ASSURANCE (Site Supervisor's Certificate) (To be submitted at end of the Financial Year) Date:26/09 /2025 To, The Partners. Vrundavan Buildcon. Shri Krishna MarbaI Compound Parola Road, Opp. Cotton Market Dhule - 424004 18 Quality Assurance Certificate (Certificate No ................... ...... for the year ending March 20) Subject: Certificate for quality of materials used and quality of construction and workmanship for the work ofVrundavan Plaza having MahaRERA Registration Number P4980001128 5 being developed by Vrundavan Buildcon Sir, I/ We Abhay V. Bhadlikar have undertaken the assignment of supervision of this real est;:ite project. Our Responsibili ty. To carry out the work in accordance with the development permission and as per the approved plan, to submit certificate of supervision of work, to carry out material testing in-situ or in an authorized laboratory as per prevailing and applicable standards, to ensure quality of work and workmanship as per prescribed specifications, and as per NBC and / or other relevant code of practice. The details of the quality are as follows: 1. Structural Design, Stability and Testing Sr. I Parameters Yes No Remarks No. ✓ I f- 2 1 Whether soil investigations of the site has been conducted before the structural design and soil parameters have been accounted for in the structural design/ drawings? Whether Structural Engineer has been appointed for the project? ✓ Name: Bhanuvilas B J License No: 2007/568/2 Mobile: 9422252335 Email: bpbhawsar@ yahoo. com 3 \Vhether the inspection registers, site order book and quality control test registers are maintained at the site properly and endorsed by the Engineer-in-C harge? 4. \,Vh~ther testing facilities to check quality of material is • ✓ available at site? 5. Whether the statua1y prov1s1O11s for disaster resistance/ ✓ earth~uak~ resistant design have been incorporated, ~pec1ally m case of multistoried construction? 6. Has su itab Ie cognizance bee 10a ke_1_1_o_n_d_e_n-1a-1-·c_a_t_e_d_fl_o_o_d___✓ lines and appropriate precautions taken for protecting the site from flooding considering local flooding issues? --------- 2. Input Materials Sr. Parameters Yes No Remarks No. ✓ 1 Whether the following building materials confirm to relevant IS/BS/NBC Code, or as per Industry Standards? If yes, provide details: r-----,----'-- ✓ 1 (a) Cement, concrete and coarse aggregate I-- --'--'----- ---- - - - - ✓ ( b) Steel and its alloys 1--- ~ - - - - - - - - - - ' - - - ✓ ~ ) Electrical wire, fittings and accessories ✓ ' I (d) Plumbing and sanitary fittings •--~------------'-----=-- - - - - - - - - ✓ 2 Whether regular tests of materials and construction products are being done from accredited labs also? If yes, details of such labs ✓ 3 Whether manufacturer test certificate for cement, steel, pipes etc. have been obtained and whether supply records are being maintained? >-----+----------------------------,----:--- - 4 Whether suitable w::iter is being used for construction? ✓ (i) What is the source of water? (ii) Has water been tested and approved by Engineer-in- Charge before construction? (iii) Has water been tested subsequently as per requirement? 3. Quality of Workmanshi p - Sr. Parameters Yes No Remarks No. ✓ 1 Whether works of all the electrical wiring/ connections/ lift installation/ other electrical installations have been carried out under authorized /registered electrical engineer and whether records of the same has been I maintained? - ✓ I 2. Whether all related works of plumbing & sanitary including installation of water supply systems, drainage systems, sewage systems, sinks, toilets etc. have been carried out under authorized /registered plumbers/ sanitary contractors and whether records of the same has been maintained? ✓ - - -- - ied out und er 3. Whe ther all the wor k is bein g carr ed µrof essi onal ? suµe rvis ion of exµe rien ced and skill and qual ity is Furt her, whe ther the wor kma nshi µ wor k is with in satis fact ory and up to the mar k and the of devi atio ns as the acce µtab le and µerm issib le limi ts µer rele vant Cod e of Prac tice? -- ---- ✓ rtak en to prev ent 4. Whe ther reme dial mea sure s are unde yes, prov ide deta ils __dam pne ss and leak ages ? If ✓ und erta ken duri ng 5. v\lh ethe r safe ty prec auti ons are kers ? cons truc tion activ ities for all type of wor 4. Mis cell ane ous Rem arks Yes No Sr. Para met ers No. ✓ is bein g carr ied out 1 Whe ther third part y qual ity insp ectio n wor ks? on site duri ng/a fter com plet ion of the If yes, prov ide deta ils. ✓ has been und erta ken for 2 Whe ther anti -term ite trea tme nt the soil? ✓ ts has been und erta ken 3 Wh ethe r fire- figh ting arra nge men und er supe rvis ion of fire con sult ant? ✓ been insta lled on site / ---I 4 Whe ther prop er sign ages have ~om plet ed buil ding as per requ irem ent? ✓ to avoi d air poll utio n 5 Whe ther prec auti ons are und erta ken 1duri ng cons truc tion ? Plea se specify. rts / resu lts have been 6 Whe ther reco rds of all test repo and whe ther the sam e prop erly kep t in the pres crib ed form ats ttees and to be hand ed are avai lable at site for view ing by allo over to the asso ciati on of allo ttees ? ✓ udin g sanc tion ed buil ding 7 Whe ther all rele vant reco rds incl rts/ resu lts have been plan s, utili ty draw ings , vari ous test repo form ats to be hand ed ove r to prop erly kept in the pres crib ed the asso ciati on of allo ttees ? ✓ n tech nolo gy has been 8 Any inno vati ve/ cost effe ctiv e/ gree iency? Plea se spec ify used for imp rovi ng qual ity/ ener gy effic You rs Fait hful ly, Signat~ Name: Abh ay V. Bha dlik ar Qua lific atio n - B.E. Civil 8 Lice nse No. STA TE/ R/20 23/A PL/0 579 Pho neN o:9 422 752 529 Plac e: Dhu le Sign atu P ·om oter Nam e: Vijay Bha dlik ar T)ate: 26.0 9.20 25