VASTU RACHANA ASSOCIATE Architectural Desi四 &Supewision Add:5‐ ん Wakharkar Nagar′ Behhd Natra,Talkies′ Dhule‐ 424001 Fom l (See Regulation 3) ARCHrrECT′ S CERTIHCATE (TO be Submitted atthetime of Registration of Ongohgproject and for Withdrawal of Money from Designated Account) Date:06。 05。 2025 To, Vrundavan Buildcon, Shd Kdshna Marbal Compound, Parola Road, Opp. Cotton Market, Near APMC, Dhulg Nashik- 424004. Subiect Certificate of percentage of completion of construction work of 'Yrundavatt Ylaza" having MahaRERA Registration Number :P49800011285 being developed by Vmndavan Buildcon. Sir, T / We Raiendra Chhaied have undertaken assignment as Architect/Licensed Surveyor of certifying percentage of Completion of Construction work of the "Vrundavan Plaza" having MahaRERA Regishation Number: P498m0U285 being developed by Vmndavan Buildcon. Based on site Inspectiorl with respect to layout/each of the building/wing of the aforesaid Real Estate project. I certify that as on the date of this certificate, the percentage of work done for each of the building/wing of the Real Estate project under MahaRERA is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in table B. Table A Layout/Building/Wing No "- "(To be prepared separately for each layout/building/wing of the project) Sr.No. Tasly'Activity Percentage of actual work done(As on 31。 12。 2024) (1) (2) (3) 1。 Excavation 100% 5︒ 100% 3︒ ︲け卜︲トー 2︒ 一 Basements(I any) 0% Plhth 100% Stit Floor 100% 6. Slabs of Super Structure 100% 一7 . 76% ht.r"rl Wrlls, Internal Plaster, Floorings, Doors and Windows Within Flats /Premises 8 75‐ │% Within the Flat/ Premises 一9 r at each Floor level overhead 85% Underground Water Tanks 10. and external Plaster, Elevation, comPletion of 70% terraces with waterproofing of the building/ wn1. 11。 0% Equipment as per CFO NOC, Electrical Fittings, Mechanical Equipment, Compliance to conditions of envirorunent / CRZ NOC, finishing to entrance Lobby / s, plinth Protection, paving of areas appurtenant to Buildin g/Wng, Compound wall and all other I requirements as may be required to complete the project as per I specifications in agreement of sale. A1y other activities. Table B Common Areas (Internal & External Development Works) in respect of the registered phase /proiect number Sro No. Common,rreas and Proposed Percentage of Details Facilities, Amenities (Ye〔 プNo) Actual Work Done(As on 31。 12。 2024) (2) (3) (4) (5) (1) 1。 Internal Roads and No 0% NA Footpaths 2. Water Supply Yes 100% Borewell is provided 3. Sewerage (chamber, Lines, Yes 100% Septic tank had Septic Tank, STP) been consttucted 4. Storm Water Drains No 0% NA 5. Landscaping &Tree Planting No 0% NA 6。 Street Lighting Yes 100% Along the road side 7。 Community Buildings No 0% NA 8. Treatnent and Disposal of No 0% NA Sewage arld Sullage water 9. Solid Waste Management & No 0% NAs Disposal 10。 Water Conservation/ Rain Yes 100% The pipe line from terrace had Water harvesting Been connected to the borewel 11。 Energy Management No 0% NA 12。 Fire Protection and Fire No 0% NA Safety Requirements 13。 Electrical meter room, Sub- No 0% NA Station, Receiving station 14. Others (Option to Add more) No 0% NA Yours Fai量 ぜully WASTU RACHANA ASSOCIATES AR.RAIENDRA RAIENDRA S.CHHA,ED CONSULTING ENGINEER'S REGD N0 010 51A,WAKHARKAR NACAR,DHULE ・ Agreed and Accepted by' MoB。 9422289905,電 爵 231680 For, Vrundavan Buildcon Signature ofPromoter Name: Vijay Narayan Bhadlikar Date: 06.05.2025