VASTU RACHANA ASSOCIATE Architectural Desi8n & SuPervision Add : 5-A, Wakharkar Nagar , Behind Natraj Talkies, Dhule 424fi)1 FORM‑2 (Eた e Regulauon 3) ENGINEER′S CERTIFICATE hdrawal of (TO be Submitted at the time of Registration of Ongoing Project and for w Money from Designated Account‐ Project wise) Date:06052025 To′ Vrundavan Bu■ dcon′ Shri Krishaヽ 〔arbal Compound′ ParOla Road′ Opp Cotton Market Near APMC′ Dhule′ Nash」 に 424004 SubieCt Certticate of Cost hcurred for Devebpment of″ Vrundavan Plaza″ hav蛇 MahaRERA Reglstrauon Number:P498m11285 bemg devebped by V― davan Buildcon. ■ ■ 1/VVe have undertaken assignment of certifying Estimated Cost for "Vrundavan Plaza" having MahaRERA Registration Number: P4980ffi11285 being developed by Vrundavan Buildcon. We have estimated the cost of civil. MEP and allied works required for completion of the apartments and proportionate completion of intemal & extemal works of the project as per specilications mentioned in agreement of sale. our estimated cost calculations are based on the drawings/plans made available to us for the project under reference by the Developer / consultants. The schedule of items and quantity required for the entire work as calculated by Quantity Surveyor* appointed by Developer/Engineer, the assumption of the cost of material, labour and other inputs made by developer, and the site inspection carried out by us to ascertain / confirm the above analysis given to us. 3 We estimate Total Estimated Cost of completion of the aloresaid project under reference at Rs.69,50,500/- (Total of Table A and B) at the time of Registration. The estimated total cost of project is with reference to the Civil, MEP and allied works required for completion of the apartments and proportionate completion of internal & extemal works, as per specifications mentioned in agreement of sale and for the purpose of obtaining occupation certificate/completion certificate for the building(S) / Wing(S) / Layout / Plotted Development from the Dhule Municipal Corporation being the planning authority under whose jurisdiction the aforesaid project is being implemented. 4. The estimated Cost Incurred tilI30.09.2024 is calculated at Rs.52,51,300/- (Total of Table A and B). The amount of Estimated Cost Incurred is calculated on the basis of input materials / services used and unit cost of these items' 5. The Balance cost of Completion of the Civil, MEP and Allied works for completion of the apartments and proportionate completion of intemal & external works, as Per specifications mentioned in agreement of sale, of the project is estimated at Rs.L6,99,200/- (Total of Table A and B). 6. I certify that the cost of the Civil, MEP and allied work for the aparhnent and proportionate intemal & external works, as per specifications mentioned in agreement of sale, of aforesaid Project as completed on the date of this certificate is as given in Table A and B Below: Table A Building/Wrng/Layout/Plotted Development bearing Number L or called Vrundavan Plaza (To be prepared separately for each Building /Wng/Layout/Plotted Development of the Real Estate Project) Sr. No. Particulars Amounts (In Rs.) 1 Total Estimated cost of the 65′ 00′ 000/― building/ w tng/ Lay out/ Plotte d Developments as 2 Costincurred as on 30.09.2024 52′ 51′ 300/― 3 Work done in percentage (as percentage of the 80。 79% estimated cost) 4 Balance Cost to be Incurred**(Based on 12′ 48′ 700/― Estimated Cost) 5 Cost incurred on additional / Extra Items not NA included in the Estimated Cost (Table-C) Table B Internal & External Development Works In Respect of the Registered Phase Sro No. Particulars Amounts (In Rs.) 1 Total Estimated cost of the Intemal and 4′ 50′ 500/― External Development works including amenities and facilities in the layo.lt 2 Costincurred as on 30.09.2024 0.00 3 Work done in percentage (as percentage of the 0% estimated cost) 4 Balance Cost to be Incurred (Based on 4′ 50′ 500/― Estimated Cost) 5 Cost incurred on additional / Extra Items not included in the Estimated Cost (Table-C) WASTU RACHANA ASSOCIATES RA,ENDRA S.CHHA,ED CONSULTING ENGINEER'S REGD N0 010 51A,WAKHARKAR NACAR,DHUL[ ° MOB.9422289905,■ や231680 Agreed and Accepted by: W For, Vrundavan Buildcoi *e Signature of Promoter Name: Vijay Narayan Bhadlikar Date:06.05.2025 Note: L. The scope of work is to complete Registered Real Estate Project as Per Drawings approved from time to time and as per specifications mentioned in agreement of sale. 2. (.) Quantity survey can be done by office of engineer or can be done by a. independent euantity Surveyor, whose Certificate of quantity calculated can be relied uPon by the Engineer. In case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked C) and in case quantity are being calculated by the Engineer, the name of the person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked (.). 3. (.) Balance Cost to be incurred (4) -ay vary from Difference between Total estimated Cost (1) and Actual Cost incurred (2) due to deviation in quantity required / escalation of cost etc. As this is an estimated cost, any deviation in quantity required for development of the Real Estate Project will result in amendment of the cost incurred/ to be incurred. 4. A1l components of work with specifications are indicative are not exhaustive. 5. Please specify if there are any deviations / qualifications. Example: Any deviations in input material used from specification in agreement of sale. Table C List of Extra /Additional/ Deleted Items considered in cost (which were not part of the original estimated of Total Cost) Sr. List of Extra/ Additiona/ Deleted items Amount (In Rs.) No. Not Applicable