VASTU RACHANA ASSOCIATE 鮨 chitectural Desi即 &Supewision しWakharkar Nagar′ Behind Natraj Talkies′ Dhule‐ 424001 Add:5‐ メ Fonn 1 (See Regulation 3) ARCHTTECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing project and for Withdrawal of Money from Designated Account) Date:06.05.2025 To, Vrundavan Buildcoru Shri Krishna Marbal Compound, Parola Road, Opp. Cotton MarkeL Near APMC, Dhule, Nashik- 424004. Subiect Certificate of percentage of completion of construction work of "Vrundavatt Plaza" having MahaRERA Registration Number: P4980m11285 being developed by Vrundavan Buildcon. Sir, I / WeRaiendra Chhaied have undertaken assignment as Architect/Licensed Surveyor of certifying percentage of Completion of Construction work of the 'Vrundavan Plaza" having MahaRERA Registration Number: P49800011285 being developed by Vmndavan Buildcon. Based on site Inspection, with respect to layout/each of the building/wing of the aforesaid Real Estate project. I certify that as on the date of this certificate, the percentage of work done for each of the building/wing of the Real Estate project under MahaRERA is as per table A herein below. The percentage of the work executed with respect to each of the activrty of the entire phase is detailed in table B. Table A Layout/Building/Wing No "_ "(To be prepared separately for each layout/building/wing of the project) Sr.No。 Tasly'Activity Percentage of actual work done(As on 30.06.2024) (2) (3) (1) 1。 E*"""ti"" 100% 2。 Basements (if any) 100% 3. Podiums (If any) 0% Plhth 100% 5. Stilt Floor 100% 6. Slabs of Super Structure 100% 7. Internal Walls, Internal Plaster, Floorings, Doors and Windows 76% Within Flats /Premises 8。 Sanitary Fittings Within the Flat/Premises 75‐ %│ 9. Staircases, Lifts Wells and Lobbies at each Floor level overhead 85% Underground Water Tanks 10。 External plumbing and external Plaster, Elevation, comPletion of 70% terraces with waterproofing of the building/wng. 11. Installation of Lifts, Water pumps, Fire Fighting Fittings and 0%‐ Equipment as per CFO NOC, Electrical Fittings, Mechanical Equipment, Compliance to conditions of environment / CIiZ NOC, finishing to entrance Lobby / s, plinth Protection, paving of areas appurtenant to Buildin1/Wng, Compound wall and all other requirements as may be required to complete the project as per specifications in agreement of sale. Any other activities. Table B Common Areas (Internal & External Development Works) in respect of the registered phase /proiect number Sr.No. Common Erreas and Proposed Percentage of Details Facilities, Amenities (Yel≠ No) Actual Work Done(As on 30。 06。 2024) (2) (3) (4) (5) (1) 1。 Internal Roads and No 0% NA Footpaths 2。 Water Supply Yes 100% Borewell is provided 3. Sewerage (chamber, Lines, Yes 100% Septic tank had been constructed Septic Tank, STP) 4. Storm Water Drains No 0% NA No 0% NA 5。 Landscaping &Tree Planting 6。 Street Lighting Yes 100% Along the road side No 0% NA 7。 Commu五 ty Buidhgs 8。 Treatment and Disposal of No 0% NA Sewage and Sullage water 9. Solid Waste Management & No 0% NAs Disposal 10. Water Conservation/ Rain Yes 100% The pipe line from terrace had Water harvesting Been connected to the borewel 11。 Energy Management No 0To NA 12。 Fire Protection and Fire No 0% NA Safety Requirements T3, Electrical meter room, Sub- No 0% NA Station, Receiving station 14。 Others (Option to Add more) No 0% NA \ yours Faitltfuuy \ \, \ \ IIASTU RACHAIIA ASSOCIATES \W l*n'n:if;fi:13*ED AR. TTAIENDRACAUAIED T^:#^il3oJ,II* NAGAR,DHULE Agreed and Accepted by' |[oB'g 422289905' 8' 231680 Signature of Pro Name: Vijay Narayan Bhadlikar Date: 06.05.2025