VASTU RACHANA ASSOCIATE Architectural Desigrl dL Slllpervision 424001 Add:5‐ へ Wakharkar Nagar′ Behind Natraj Talkies′ Dhule‐ Fo...11 (See RegulatiOn 3) ARCHFECT′ S CERTIHCATE (TO be Submitted atthe time of Registration of Ongoing pro;eCt and for Withdrawal of Money ttom Desり ■ated Account) Date:06.05。 2025 To′ Vrundavan Bu五 dco]町 Shri Krishna Marbal Compound′ Par01a Road′ Oppe CottOn Markeし Near APIMC′ Dhule′ Nashttk‑424004. Subiect: Cerdficate of percentage of cOmpledon of construcuon work of″ Vrundavan Plaza″ havmg MahaRERA Reglstradon Nlumber: P49800011285 bemg developed by Vmndavan Buildcon. Sir′ eyor of Cer的 hg 1/We Ra;endra chhajed have undertaken assittnt as Archtect/Lた ensed SuⅣ ′ ′ percentage of COmpledon Of COnsttucuon wOrk of the Vmndavan Plaza″ havhg MahaRERA Registration N― ber:P49800011285 being developed by VmndaVan BuildCon。 Based on site Inspection, with respect to layout/each of the building/wing of the aforesaid Real Estate project. I certify that as on the date of this certificate, the percentage of work done for each of the Luilding/wing of the Real Estate project under MahaRERA is as per table A herein below. The percentage of the work executed with respect to each of the activrty of the entire phase is detailed in table B. Table A Layout/Building/Wing No "- "(To be prepared separately for each layout/building/wing of the project) Sr.No。 Tasly'Activity Percentage of actual work done(As on 31。 03。 20241 (1) (2) (3) 1。 E*r""ti." 100% 2。 Basements (if any) 100% Podiums (If anY) Stilt Floor Slabs of Super Structure :′ Floorhgs′ Doors and Whdows Within Flats f Ptemises Sa"itary Fittings Within the Flat/Premises ies at each Floor leve1 overhead Underground Water Tanks ternal Plaster, Elevation, comPletion of terraces with waterproofing of the building/wng' PumPs, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical Fittings, Mechanical Equipment, Compliance to conditions of environment / CIW NOC, finishing to entrance Lobby / s, plinth Protection, paving of areas appurtenant to Buildin g/Wng, Compound wall and all other requirements as may be required to complete the project as per specifications in agreement of sa1e. Any other activities. Table B phase Common Areas (Internal & External Development Works) in respect of the registered /proiect number Proposed Percentage of Details Sro No。 Common Erreas and Facilities, Amenities (Yey'fro) Actual Work Done (As on 3L.03.2024) (3) (4) (s) (1) (2) 1。 Internal Roads and No 0% NA Footpaths 2。 Water Supply Yes 100% Borewell is provided 3。 Sewerage (chamber, Lines, Yes 100% Septic tank had Septic Tank, STP) been constructed 4. Storm Water Drains No 0% NA 5. Landscaping &Tree Planting No 0% NA 6. Street Lighting Yes 100% Along the road side 7. Community Buildings No 0To NA 8。 Treatment and Disposal of No 0% NA Sewage and Sullage water 9. Solid Waste Management & No 0% NAs Disposal 10. Water Consenration/ Rain Yes 100% The pipe line from terrace had Water harvesting Been connected to the borewell 11. Energy Management No 0% NA 12. Fire Protection and Fire No 0% NA Safety Requirements 13。 Electrical meter room, Sub- No 0% NA Station, Receiving station 14。 Others (Option to Add more) No 0% NA Yours Faithfully WASTU RACHANA ASSOCIATES RAIENDRA SeCHHA,ED AR.RAIENDRA CI cONSULTING ENGINEEROS REGD N0 010 51A,WAKHARKAR NACAR,DHUL〔 MoB。 9422289905.籠 │° 231680 3 Agreed and Accepted by, For′ Vrundavan Bu丑 dco書 Signature of Pro Name: Vijay Narayan Bhadlikar Date: 06.05.2025 :LT農 ′ ィき奏 :