VASTU RACHANA ASSOCIATE Architectural Desi即 &Supewision Add:5‐ A′ W」 凸 arkar Nagar′ Behind Natraj Talkies′ Dhule‐424001 Fo....1 (See Regulation 3) ARCHITECT′ S CERTIFICATE (To be submitted at the time of Registration of Ongoing proiect and for Withdrawal of Money from Designated Account) Date:06.05.2025 To, Vrundavan Buildcon, Shri IGishna Marbal Compound, Parola Road, Opp. Cotton Market Near APMC, Dhule, Nashik- 424004. Subiech Certificate of percentage of completion of construction work of "Vrundavatr Ylaza" having MahaRERA Registration Number: P4980m11285 being developed by Vrundavan Buildcon. Sir, I / We Raiendra Chhajed have undertaken assignment as Architect/Licensed Surveyor of certifying percentage of Completion of Construction work of the "Vrundavan Plaza" having MahaRERA Registration Number: P498m011285 being developed by Vrundavan Buildcon. Based on site Inspection, with respect to layout/each of the building/wing of the aforesaid Real Estate project. I certify that as on the date of this certificate, the percentage of work done for each of the building/wing of the Real Estate project under MahaRERA is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in table B. Table A Layout/Building/Wing No "- "(To be prepared separately for each layout/building/wing of the project) Sr.No。 Tasly'Activity Percentage of actual work done(As on 31。 12。 2023) (1) (2) (3) 1。 Excavation 100% 2. Basements (if u^y) 100% 一3 ︒ Podiums (If any) 0% 4. Plhth 100% 5。 St■ t Floor 100% 6. Slabs of Super Struchrre 100% 7。 tr-,t"rr,ul Walls, Internal Plaster, Floorings, Doors and Windows 76% Within F1ats f Premises 8. Sanitary Fittings Within the Flat/Premises 751% 一9 . els and Lobbies at each Floor level overhead 85% Underground Water Tanks 一% ・知 10。 U*t"*A ptrr*Uing and external Plaster, Elevation, completion of terraces with waterproofing of the building/wng. 11. t"staUtio" of Lifts, Water pumps, Fire Fighting Fittings and 0% Equipment as per CFO NOC, Electrical Fittings, Mechanical Equipment, Compliance to conditions of envirorunent / CRZ NOC, finishing to entrance Lobby /s, plinth Protection, Paving of areas appurtenant to Buildin g/Wing, Compound wall and all other requirements as may be required to complete the project as per specifications in agreement of sale. A^y other activities. Table B Common Areas (Internal & External Development Works) in respect of the registered phase /project number Sro No。 Common areas and Proposed Percentage of Details Facilities, Amenities (Ye〔 √No) Actual Work Done(As on 31。 12。 2023) (1) (2) (3) (4) (5) 1。 Internal Roads and No 0% NA Footpaths 9一 Water Supply Yes 100% Borewell is provided 3。 Sewerage (chamber, Lines, Yes 100% Septic tank had Septic Tank, STP) been constructed 4。 Storm Water Drains No 0% NA 5. Landscaping &Tree Planting No 0% NA 6。 Street Lighting Yes 100% Along the road side 7。 Community Buildings No 0% NA No 0% NA 8. Treahent and DisPosal of Sewage and Sullage water So1id Waste Management & No 0% NAs 9。 Disposal 10. Water Conservation/ Rain Yes 100% The pipe line from terrace had Been connected to the borewel Water harvesting No 0% NA 11. Energy Management No 0% NA 12。 Fire Protection and Fire Safety Requirements No 0% NA 13。 Electrical meter room, Sub- Station, Receiving station to Add more) No 0% NA 14。 WASTU RACHANA ASSOCIATES RAIENDRA SeCHHA,ED CONSULTING ENGINEER'S REGD N0 010 51A,WAKHARKAR NACAR,DHULE Agreed and Accepted bY' MoB.94222899059篭 │° 231680 For, Vrundavan Buildcon Name: Vijay Narayan Bhadlikar Date: 06.05.2025