VASTU RACHANA ASSOCIATE Architectural Desim&Supewision Add:5‐ ハしWakharkar Nagar′ BehLnd Natrai Talkies′ Dhule‐424001 Fom l (See Regulation 3) ARCHITECT′ S CERTIΠ CATE (TO be Submitted atthetime of ReJstratiOn of Ongoing project and for Withdrawal of Money from Designated Account) Date:06。 05。 2025 To, Vrundavan Buildcoru Shri Krishna Marbal ComPound, Parola Road, Opp. Cotton Market, Near APMC, Dhule, Nashik- 424004. Subiecfi Certificate of percentage of completion of construction work of 'Yrundavarr Plaza" having MahaRERA Registration Number: P49800011285 being developed by Vrundavan Buildcon. Sir, | / WeRaiendra Chhaied have undertaken assignment as Architect/Licensed Surveyor of certifying percentage of Completion of Constructionwork of the "Vrundavan Plaza" having MahaRERA Registration Number: P49800011285 being developed by Vmndavan Buildcon. Based on site Inspection, with respect to layout/each of the building/wing of the aforesaid Real Estate project. I certify that as on the date of this certificate, the percentage of work done for each of the building/wing of the Real Estate project under MahaRERA is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in table B. Table A Layout/Building/Wing No "- "(To be prepared separately for each layout/building/wing of the project) Sro No。 Tasly'Activity Percentage of actual work done(As on 30。 06。 2023) (1) (2) (3) 1。 Excavation 100% 2。 Basements (if any) 100% 3. Podiums (If any) 0% 4。 Plhth 100% 5. Stilt Floor 100% 6。 Slabs of Super Structure 100% 7 Plaster, Floorings, Doors and Windows 76% Within Flats f Premises 一8 Sanitary Fittings Within the Flat/Premises 751% 一 % 9. Stuir.ur"+ t-ifrc W"ttr and Lobbies at each Floor level overhead 誌一 一 Underground Water Tanks 一 % 〇 一一一 grt.*ul plumbing and external Plaster, Elevation, completion of 一 7 10。 terraces with waterproofing of the building/wng. % 一 0 一 一 11. I*tffitr, Wuter puffips, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical Fittings, Mechanical Equipmen! Compliance to conditions of environment / CRZ NOC, finishing to entrance Lobby / s, plinth Protection, paving of areas appurtenant to Building/Wng, Compound wall and all other requirements as may be required to complete the project as per specifications in agreement of sale. A.y other activities. Table B Common Areas (Internal & External Development Works) in respect of the registered phase /proiect number Sro No. Common areas and Proposed Percentage of Details Facilities, Amenities (Ye〔 ≠No) Actual Work Done(As on 30。 06。 2023) (1) (2) (3) (4) (5) 1. Internal Roads and No 0% NA Footpaths 2。 Water Suppty Yes 100% Borewell is provided 3. Sewerage (chamber, Lines, Yes 100% Septic tank had Septic Tank, STP) been constructed 4。 Storm Water Drains No 0% NA 5. Landscaping &Tree Planting No 0% NA 6。 Street Lighting Yes 100% Along the road side 7. Community Buildit gt No 0% NA 8。 Treahnent and Disposal of No 0% NA Sewage and Sullage water 9。 Solid Waste Management & No 0% NAs Disposal 10。 Water Conservation/ Rain Yes 100% The pipe line from terrace had Water harvesting Been connected to the borewell 11. Energy Management No 0% NA 12. Fire Protection and Fire No 0% NA Safety Requirements 13. Electrical meter room, Sub- No 0% NA Station, Receiving station 14. Others (Option to Add more) No 0% NA Yours Faithfully WASTU RACHANA ASSOCIATEこ AR.RAIENDRA』 k「巧雇D RA,ENDRA SeCHHAIED CONSULT:NG ENGINEERoS RECD N0 010 51A,WAKHARKAR NACAR,DHULE ° Agreed and Accepted by: MOB09422289905,富 231680 For′ Vrundavan Buidcon Name: Vijay Narayan Bhadlikar Date: 06.05.2025