VASTU RACHANA ASSOCIATE Archttectural Des Add:5‐ ん Wakharkar Nagar′ Behind Natrai Talkies′ Dhule‐424001 Fo...11 (See Regulation 3) ARCHITE(gr′ S cERTIHCATE (TO be Submitted atthe time of ReJstratiOn of Ongoing project and for Withdrawal of Money ttom Designated Account) Date:06。 05。 2025 To, Vrundavan Buildcoru Shri IGishna Marba1 Compound, Parola Road, Opp. Cotton Market, Near APMC, Dhule, Nashik- 424004. Subieck Certificate of percentage of completion of construction work of "\y'rundavan Plaza" having MahaRERA Registration Number: P498(X)011285 being developed by Vrundavan Buildcon. Sir, I / We Raiendra Chhaied have undertaken assignment as Architect/Licensed Surveyor of certifying percentage of Completion of Construction work of the "Vrundavan Plaza" having MahaRERA Registration Number: P49800011285 being developed by Vrundavan Buildcon. Based on site Inspection, with respect to layout/each of the building/wing of the aforesaid Real Estate project. I certify that as on the date of this certificate, the percentage of work done for each of the building/wing of the Real Estate project under MahaRERA is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in table B. Table A Layout/Building/Wing No "- "(To be prepared separately for each layout/building/wing of the project) Sr.No. Tasly'Activity Percentage of actual work done(As on 31。 03.2023) (1) (2) (3) 1. Excavation 100% 2。 Basements (if any) 100% 3. Podiums (If any) 0% 4. Plhth 100% 5. Stilt Floor 100% 6. Slabs of Super Structure 100% 7。 Internal Walls, Internal Plaster, Floorings, Doors and Windows Within Flats /Premises 8. Sanitary Fittings Within the Flat/Premises 75:% 9。 Staircases, Lifts Wells and Lobbies at each Floor level overhead 85% Underground Water Tanks 10。 External plumbing and external Plaster, Elevation, completion of 701%‐ terraces with waterproofing of the buildingf wntg. 11. Installation of Lifts, Water pumps, Fire Fighting Fittings and 0% Equipment as per CFO NOC, Electrical Fittings, Mechanical Equipment, Compliance to conditions of environment / CI?Z NOC, finishing to entrance Lobby / s, plinth Protection, paving of areas appurtenant to Building/Wng, Compound walI and all other requirements as may be required to complete the project as per specifications in agreement of sale. A.y other activities. Table B Common Areas (Internal & External Development Works) in respect of the registered phase /proiect number Sro No。 Common areas and PrOPOSed Percentage of Details Facilities, Amenities (Ye〔 郭No) Actual Work Done(As on 31.03。 2023) (1) (2) (3) (4) (5) 1. Internal Roads and No 0% NA Footpaths 2。 Water Supply Yes 100% Borewell is provided 3. Sewerage (chamber, Lines, Yes 100% Septic tank had Septic Tank, STP) been constructed. 4. Storm Water Drains No 0% NA 5。 Landscaping &Tree Planting No 0% NA 6. Street Lighting Yes 100% Along the road side 7. Community Buildirgt No 0% NA 8。 Treahnent and Disposal of No 0% NA Sewage and Sullage water 9。 Solid Waste Management & No 0% NAs Disposal 10。 Water Conservation/ Rain Yes 100% The pipe line from terrace had Water harvesting Been connected to the borewel 11。 Energy Management No 0% NA 12. Fire Protection and Fire No 0% NA Safety Requirements 13。 Electrical meter room, Sub- No 0% NA Station, Receiving station 14。 Others (Option to Add more) No 0% NA ruu'YM Yours Faithfully \ WASTU RACHANA ASSOCIATES RAIENDRA SeCHHA,ED AR. RAIENDRA CriualED CONSULTING ENG:NEER'S RECD N0 010 51A,WAKHARKAR NACAR,DHULE‐ Agreed and Accepted by' MoB.94222899059奮 │・ 231680 For, Vrundavan Buildcon Name: Vijay Narayan Bhadlikar Date: 06.05.2025