VASTU RACHANA ASSOCIATE Architectural Desisn & Supervision Add : 5-A, Wakharkar Nagar , Behind Natraj Talkies, Dhule 42tOO1 FORM-2 (See Regulation 3) ENGINEER'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Proiect and for withdrawal of Money from Desigrrated Account-Project wise) Date1 06 05 2025 To, Vrundavan Buildcon, Shri Krishna Marbal Compound, Parola Road, Opp. Cotton Market, Near APMC, Dhule, Nashik- 424 0M. Subject Certificate of Cost lncurred for Development of "Vrundavan Plaza" having MahaRERA Registration Number :P498fi[11285 being developed by Vrundavan Buildcon. S l I Er. Rajendra Chhajed have undertaken assignment of certi{ying Estimated Cost for "Vrundavan Plaza" having MahaRERA Registration Number: P4980011285 being developed by Vrundavan Buildcon, We have estimated the cost of civil. MEP and allied works required for completion of the apartments and proportionate completion of intemal & extemal works of the proiect as per specifications mentioned in agfeement of sale. our estimated cost calculations are based on the drawings/plans made available to us for the project under reference by the Developer / consultants. The schedule of items and quantity required for the entire work as calculated by Quantity Surveyor* appointed by Developer/ Engineer, the assumption of the cost of material, labour and other inputs made by developer, and the site inspection carried out by us to ascertain / confirm the above analysis given to us. .1. we estimate Total Estimated Cost of completion of the aforesaid project under reference at Rs.69,50,500/- (Total of Table A and B) at the time of Registration. The estimated total cost of project is with reference to the Civil, MEP and allied works required for completion of the apartments and proportionate completion of intemal & extemal works, as per specifications mentioned in agreement of sale and for the purpose of obtaining occupation certificate/completion certificate for the building(S) / Wing(S) / Layout / Plotted Development from the Dhule Municipal Corporation being the planning authority under whose jurisdiction the afotesaid proiect is being implemented. 4. The estimated Cost Incurred titl 30.09.2022 is calculated at Rs.52,51,300/- (Total of Table A and B). The amount of Estimated Cost Incurred is calculated on the basis of input materials / services used and unit cost of these items. The Balance cost of Completion of the Civil, MEP and Allied works for completion of the apartments and proportionate completion of intemal & external works, as per specifications mentioned in agreement of sale, of the project is estimated at RsJ1.6,99,200/- (Total of Table A and B). / 0 I certify that the cost of the Civil, MEP and allied work for the apartment and proportionate internal & extemal works, as per specifications mentioned in agreement of sale, of aforesaid Project as completed on the date of this certificate is as given in Table A and B Below: Table A Building/Wtng/Layout/Plotted Development bearing Number L or called Vrundavan Plaza (To be prepared separately for each Building /Wng/I-ayout/Plotted Development of the Real Estate Project) Sr. No. Particulars Amounts (In Rs.) ■■ Total Estimated cost of the 65′ 00′ 000/― building/ wrng/ Lay out/ Plotted Developments as つ4 Costincurred as on 30.09.2022 52′ 51′ 300/― 3 Work done in percentage (as percentage of the 80.79% estimated cost) 4 Balance Cost to be Incurred**(Based on 12′ 48′ 700/― Estimated Cost) 5 Cost incurred on additional / Extra Items not NA included in the Estimated Cost (Table-C) Table B Internal & Extemal Development Works In Respect of the Registered Phase Sr. No. Particulars Amounts (In Rs.) ■■ Total Estimated cost of the Internal and 4′ 50′ 500/― External Development works including amenities and facilities in the layout つ4 Cost incurred as on 30.09.2022 0.00 3 Work done in percentage (as percentage of the 0% estimated cost) 4 Balance Cost to be Incurred (Based on 4′ 50′ 500/― Estimated Cost) 5 Cost incurred on additional / Extra Items not included in the Estimated Cost (Table-C) WASTU RACHANA ASSOCIATES RAjENDRA SeCHHA,ED CONSuLTING ENGINEERIS RECD N0 010 Chhaied 51A,WAKHARKAR NACAR,DHULE ‖OB。 9422289905,13・ 231680 dWお Agreed and Accepted bY: bⅧ Signature of Iromoter Name: Viiay NaraYan Bhadlikar Date:06.05.2025 Note: j.. The scope of work is to complete Registered Real Estate Project as per Drawings approved from time to time and as per specilications mentioned in agreement of sale. 2. (.) euantity survey can be done by office of engineer or can be done by * independent uPon by the euantity Surveyor, whose Certificate of quantity calculated can be relied name Engineer. In case of independent quantity surveyor being appointed by Developer, the has to be mentioned at the place marked (.) and in case quantity are being calculated by the Engineer, the name of the person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked (.). 3. f) Balance Cost to be incurred (4) may vary from Difference between Total estimated Cost (1) and Actual Cost incurred (2) due to deviation in quantity required / escalation of cost etc. As this is an estimated cost, any deviation in quantity required for development of the Real Estate Project will result in amendment of the cost incurred/ to be incurred. 4. Atl components of work with specilications are indicative are not exhaustive. 5. Please specify if there are any deviations / qualifications. Example: Any deviations in input material used from specilication in agreement of sale. Table C List of Extra / Additional/ Deleted Items considered in cost (which were not part of the original estimated of Total Cost) Sr。 List of Extra/AdditionavDeleted items Amount (In Rs.) No. Not Applicable