=VASTU RACHANA ASSOCIATE Architectural Desim&Supewision しWakharkar Nagar′ Behind Natraj Talkies′ Dhule‐424001 Add:5‐ メ Form 1 (See Regulation 3) ARCHTTECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing proiect and for Withdrawal of Money from Designated Account) Date:06。 05。 2025 To, Vrundavan Buildcon, Parola Road, Opp. Cotton Market Near APMC, Dhule, Nashik- 424004. Subiect Certificate of percentage of completion of construction work of "Vrundavatt Plaza" having MahaRERA Registration Number: P49800011285 being developed by Vrundavan Buildcon. Sir, I / We Raiendra Chhajed have undertaken assignment as Architect/Licensed Surveyor of certifying percentage of Completion of Construction work of the "Vrundavan Plaza" having MahaRERA Regishation Number: P49800011285 being developed by Vrundavan Buildcon. Based on site Inspectiory with respect to layout/each of the building/wing of the aforesaid Real Estate project. I certify that as on the date of this certificate, the percentage of work done for each of the building/wing of the Real Estate project under MahaRERA is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in table B. Table A Layout/Building/Wing No "- "(To be prepared separately for each layout/building/wing of the project) Sro No。 Tasly'Activity Percentage of actual work done(As on 30。 09。 2022) (1) (2) (3) 1。 Excavation 100% 2。 Basements (if ut y) 100% 3。 Podiums (If any) 0% 4. Plhth 100% 5. Sit Floor 100% 6. Slabs of Super Structure 100% 7。 Internal Walls, Internal Plaster, Floorings, Doors and Windows 76% Within Flats /Premises 8。 Sanitary Fittings Within the Flat/Premises 7\Yo 8 5 % 9. Staircases, Lifts Wells and Lobbies at each Floor leve1 overhead . 一 ・ ・ . . ・ ・ 一 Underground Water Tanks %一 一 ︐ 7 ・ 0 10. External plumbing and external Plaster, Elevation, completion of ・ 一 ﹁一 . terraces with waterproofing of the building/ wng. 11. Installation of Lifts, Water pumps, Fire Fighting Fittings and 0% Equipment as per CFO NOC, Electrical Fittings, Mechanical Equipment, Compliance to conditions of envirorunent / CI?Z NOC, finishing to entrance Lobby / s, plinth Protection, paving of areas appurtenant to Building/Wng, Compound wall and all other requirements as may be required to complete the project as per specifications in agreement of sale. A.y other activities. Table B Common Areas (Internal & External Development Works) in respect of the registered phase /ptoject number Sr.No. Common.rreas and Proposed Percentage of Details Facilities, Amenities (Yes/fllo) Actual Work Done (As on 30.09.2022) (1) (2) (3) (4) (5) 1. Internal Roads and No 0% NA Footpaths 9一 Water Supply Yes 100% Borewell is provided 3。 Sewerage (chamber, Lines, Yes 100% Septic tank had Septic Tank, STP) been constructed 4。 Storm Water Drains No 0% NA 5。 Landscaping &Tree Planting No 0% NA 6. Street Lighting Yes 100% Along the road side 7. Community Buildings No 0% NA 8。 Treatnent and Disposal of No 0% NA Sewage and Sullage water 9。 Solid Waste Management & No 0% NAs Disposal 10. Water Conservation/ Rain Yes 100% The pipe line from terrace had Water harvesting Been connected to the borewel 11. Energy Management No 0% NA 12. Fire Protection and Fire No 0% NA Safety Requirements 13. Electrical meter room, Sub- No 0% NA Station, Receiving station 14。 Others (Option to Add more) No 0% NA Yours Faithfully WASTU RACHANA ASSOCIATES RA,ENDRA SeCHHA,ED AR. RAIENDRA CEU:AIHD CONSULTnIG ENcINEER'S REGD N0 010 51A,WAKHARKAR NACAR,DHULI Agreed and Accepted by: ・231680 ‖OB。 9422289905,電 諄 For′ Vrundavan Bu■ dcon Signature of Promoter Name: Vijay Narayan Bhadlikar Date: 06.05.2025