VASTU RACHANA ASSOCIATE Architeclば al Desim&Supervision Add:5‑A′ Wakharkar Nagar′ Bchind Natrai Talkies′ Dhule 424X11 FORM‑2 (See Regula■ on 3) ENCINEER′ S CERTIFICATE (TO be Submitted atthe time of RegistraHon of Ongoing Prolect and for withdrawal of Money from Designated Account‐ Prolect wiSe) Date:06052025 To, Vrundavan Buildcon, Shri Krishna Marbal Compound, Parola Road, Opp. Cotton Marke! Near APMC, Dhule, Nashik- 424 004. Subiecfi Certi.ficate of Cost Incurred for Development of "Vrundavan Plaza" having MahaRERA Registration Number :P49800011285 being developed by Vrundavan Buildcon. S l I Er Rajendra Chhajed have undertaken assignment of certifying Estimated Cost for "Vrundavan Plaza" having MahaRERA Registration Number: P498001UE5 being developed by Vrundavan Buildcon. We have estimated the cost of civil. MEP and allied works required for completion of the apartments and proportionate completion of intemal & extemal works of the project as per specifications mentioned in agreement of sale. our estimated cost calculations are based on the drawings/ plans made available to us for the project under reference by the Developer / consultants. The schedule of items and quantity required for the entire work as calculated by Quantity Surveyor* appointed by Developer/Engineer, the assumption of the cost of material, labour and other inputs made by developer, and the site inspection carried out by us to ascertain / conlirm the above analysis given to us. 3 We estimate Total Estimated Cost of completion of the atoresaid project under reference at Rs.69,50500/- (Total of Table A and B) at the time of Registration. The estimated total cost of project is with reference to the Civil, MEP and allied works required for completion of the apartments and proportionate completion of intemal & extemal works, as per specifications mentioned in agreement of sale and for the purpose of obtaining occupation certificate/completion certificate for the building(S) / Wing(S) / Layofi / Plotted Development from the Dhule Municipal Corporation being the planning authority under whose jurisdiction the aforesaid project is being implemented. 4. The estimated Cost Incurred fill 30.06.2022 is calcutated at Rs.52,51,300/- (Total ol Table A and B). The amount of Estimated Cost Incured is calculated on the basis of input materials / services used and unit cost of these items' 5. The Balance cost of Completion of the Civil, MEP and Allied works for completion of the apartments and proportionate completion of intemal & extemal works, as per specifications mentioned in agreement of sale, of the ploject is estimated at Rs.1,6,99,200/ - (Total of Table A and B). 6. I certify that the cost of the Civil, MEP and allied work for the apartrnent and proportionate intemal & extemal works, as per specifications mentioned in agreement of sale, of aforesaid Project as completed on the date of this certificate is as given in Table A and B Below: Table A Building/ Wing/ Layout/ Plotted Development bearing Number 1 or called Vrundavan Plaza (To be prepared separately for each Building /Wng/I-,ayofi/Plotted Development of the Real Estate Proiect) Sr.No. Particulars Amounts (In Rs.) 1 Total Estimated cost of the 65,00′ 000/― building/ wingl Layout/ Plotted Developments as つ Costincurred as on 30 06 2022 52′ 51′ 300/― 3 Work done in percentage (as percentage of 8079% the estimated cost) 4 Balance Cost to be lncurred+*(Based on 12′ 48′ 700/― Estimated Cost) 5 Cost incurred on additional / Extra Items not NA included in the Estimated Cost (Table-C) Table B lntemal & Extemal Development Works In Respect of the Registered Phase Sr.No. Particulars Amounts (In Rs.) 1 Total Estimated cost of the Intemal and 4′ 50′ 500/― Extemal Development works including amenities and facilities in the layout 2 Costincurred as on 30 06 2022 000 3 Work done in percentage (as percentage of 0% the estimated cost) 4 Balance Cost to be Incurred (Based on 4′ 50′ 500/― Estimated Cost) 5 Cost incurred on additional / Extra Items not included in the Estimated Cost (Table-C) Your WASTU RACHANA ASSOCiATES RAjENDRA S.CHHA,ED CO‖ SULTING ENGINEER'S Er. Raien Chhafed RE60 N0 010 olA,WAKHARKAR NACAR,DHULじ 鵬03.9422289905,雪 ・2316Qじ Agreed and Accepted by: Signature of Name: Vijay Narayan Bhadlikar Date:06.05.2025 Note: 1. The scope of work is to complete Registered Real Estate Project as Per Drawings approved from time to time and as per specifications mentioned in agreement of sale. 2. (.) Quantig survey can be done by office of engineer or can be done by * independent Quantity Surveyor, whose Certificate of quantity calculated can be relied upon by the Engineer. In case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked (.) and in case quantity are being calculated by the Engineer, the name of the person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked (.). *y vary from Difference between Total estimated 3. (.) Balance Cost to be incurred (4) Cost (1) and Actual Cost incurred (2) due to deviation in quantity required / escalation of cost etc. As this is an estimated cost, any deviation in quantity required for development of the Real Estate Project will result in amendment of the cost incurred/ to be incurred. 4. All components of work with specifications are indicative are not exhaustive. 5. Please specify if there are any deviations / qualifications. Example: Any deviations in input material used from specification in agreement of sale. Table C List of Extra / Additional/ Deleted Items considered in cost (which were not part of the original estimated of Total Cost) Sr. List of Extra/ Additional/Deleted items Amount (In Rs.) No. Not Applicable