VASTU RACHANA ASSOCIATE Architectural Desi騨 &Supewision Add:5‑A′ Wakharkar Nagar′ Behind Natraj Talkies′ Dhule‑424001 Fo...11 (See Regulation 3) ARCHITECT′ S CERTIΠ CATE (To be submitted at the time of Registration of Ongoing proiect and for Withdrawal of Money from Designated Account) Date:06.05.2025 To, Vrundavan Buildcon, Shri Krishna Marba1 Compound, Parola Road, Opp. Cotton Market, Near APMC, Dhule, Nashik- 424004. Subject Certificate of percentage of completion of construction work of "Vrundavarr Plaza" having MahaRERA Registration Number: P498(m1285 being developed by Vrundavan Buildcon Sir, I / We Raiendra Chhaied have undertaken assignment as Architect/Licensed Surveyor of certifying percentage of Completion of Constructionwork of the "Vrundavan Plaza" having MahaRERA Registration Number: P498ffi011285 being developed by Vrundavan Buildcon. Based on site Inspection, with respect to layout/each of the building/wing of the aforesaid Real Estate project. I certify that as on the date of this certificatg the percentage of work done for each of the building/wing of the Real Estate project under MahaRERA is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in table B. Table A Layout/Building/Wing No "_ "(To be prepared separately for each layout/building/wing of the project) Sr.No。 Tasly'Activity Percentage of actual work done(As on 30。 06。 2022) (1) (2) (3) 1。 Excavation 100% 2. Basements (if u"y) 100% 3。 Podiums (If any) 0% 4. Plhth 100% 5。 Sdt Floor 100% 6。 Slabs of Super Structure 100% 7。 Internal Walls, Internal Plaster, Floorings, Doors and Windows 761% Within Flats /Premises %一 8。 Sanitary Fittings Within the Flat/Premises ・ 乃一 9. Staircases, Lifts Wells and Lobbies at each Floor level overhead 851%│ Underground Water Tanks 10. External plumbing and external Plaster, Elevation, completion of 701%│ terraces with waterproofing of the building/ wng. 11。 Installation of Lifts, Water pumps, Fire Fighting Fittings and 0% Equipment as per CFO NOC, Electrical Fittings, Mechanical Equipment, Compliance to conditions of environment / CI?Z NOC, finishing to entrance Lobby / s, plinth Protection, paving of areas appurtenant to Building/Wng, Compound wall and all other requirements as may be required to complete the project as per specifications in agreement of sale. A.y other activities. Table B Common Areas (Internal & External Development Works) in respect of the registered phase /ptoject number Sro No. Common.rreas and Proposed Percentage of Details Facilities, Amenities (Yel郭 No) Actual Work Done(As on 30。 06。 2022) (1) (2) (3) (4) (5) 1。 Internal Roads and No 0% NA Footpaths 2。 Water Supply Yes 100% Borewell is provided 3。 Sewerage (chamber, Lines, Yes 100% Septic tank had Septic Tank, STP) been constructed 4。 Storm Water Drains No 0% NA 5。 Landscaping &Tree Planting No 0% NA 6。 Street Lighting Yes 100% Along the road side 7. Community Buildings No 0% NA isPosal of No 0% NA 8。 Sewage and Sullage water Solid Waste Management & No 0% NAs 9。 Disposal Yes 100% The pipe line from terrace had 10。 Water Conservation/ Rain Been connected to the borewel Water harvesting No 0% NA 11. Energy Management No 0% NA 12. Fire Protection and Fire Safety Requirements No 0% NA 13. Electrical meter room, Sub- Station, Receiving station No 0% NA 14. Others (Option to Add more) Yours Fai WASTU RACHANA ASSOCIATES RAIENDRA SeCHHAIED ARo R倒「ENDI cONSULTING ENGINEER'S RECD N0 010 51A,WAKHARKAR NACAR,DHULE ・231680 Agreed and Accepted bY' MoB。 9422289905,1諄 For, Vrundavan Buildcon Signature Name: Vijay Narayan Bhadlikar Date: 06.05.2025