VASTU RACHANA ASSOCIATE Architectural Des理 &Supewision Add:5‐ A′ Wakharkar Nagar′ Behhd Natrtt Talkies′ Dhule‐424001 Fonn 1 (See Regulation 3) ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing proiect and for Withdrawal of Money from Designated Account) Date:06。 05。 2025 To, Vrundavan Buildcoru Shri Krishna Marbal Compound, Parola Road, Opp. Cotton Market, Near APMC, Dhule, Nashik- 424004. Subiecfi Certificate of percentage of completion of construction work of "\y'rundavan Plaza" having MahaRERA Registration Number: P49800011285 being developed by Vrundavan Buildcon. Sir, I / We Raiendra Chhaied have undertaken assignment as Architect/Licensed Surveyor of certifying percentage of Completion of Conskuction work of the "Vnrndavan Plaza" having MahaRERA Regishation Number: P49800011285 being developed by Vrundavan Buildcon. Based on site Inspection, with respect to layout/each of the building/wing of the aforesaid Real Estate project. I certi-S, that as on the date of this certificate, the percentage of work done for each of the building/wing of the Real Estate project under MahaRERA is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in table B. Table A Layout/Building/Wing No "- "(To be prepared separately for each layout/building/wing of the project) Sr.No。 Tasly'Activity Percentage of actual work done(As on 31。 03.2022) (1) (2) (3) Excavation 100% 2. Basements (if any) 100% 3。 Podiums (If any) 0% Plmth 100% 5. Stit Floor 100% 6。 Slabs of Super Structure 100% 7. Internal Walts, Internal Plaster, Floorings, Doors and Windows 76% Within Flats f Premises 8。 Sanitary Fittings Within the Flat/Premises 751%│ 9. Staircases, Lifts Wells and Lobbies at each Floor leve1 overhead 851%│ Underground Water Tanks 10。 External plumbing and external Plaster, Elevation, comPletion of 70% terraces with waterproofing of the building/wng. 11。 Installation of Lifts, Water pumps, Fire Fighting Fittings and 0°/。 │ Equipment as per CFO NOC, Electrical Fittings, Mechanical Equipment, Compliance to conditions of environment / CI?Z NOC, finishing to entrance Lobby / s, plinth Protection, paving of areas appurtenant to Building/Wng, Compound wall and all other requirements as may be required to complete the project as per specifications in agreement of sale. A^y other activities. Table B Common Areas (Internal & External Development Works) in respect of the registered phase /proiect number Sro No。 Common areas and Proposed Percentage of Details Facilities, Amenities (YeqAIo) Actual Work Done(As on 31.03.2022) (1) (2) (3) (4) (5) 1. Internal Roads and No 0% NA Footpaths 2。 Water Supply Yes 100% Borewell is provided 3. Sewerage (chamber, Lines, Yes 100% Septic tank had Septic Tank, STP) been constructed 4。 Storm Water Drains No 0% NA 5. Landscaping &Tree Planting No 0% NA 6。 Street Lighting Yes 100% Along the road side 7. Community Buildings No 0% NA 8. Treatment and Disposal of No 0% NA Sewage and Sullage water 9. Solid Waste Management & No 0% NAs Disposal 10. Water Conservation/ Rain Yes 100% The pipe line from terrace had Water harvesting Been connected to the borewel 11. Energy Management No 0% NA 12。 Fire Protection and Fire No 0% NA Safety Requirements 13。 Electrical meter room, Sub- No 0% NA Station, Receiving station 14. Others (Option to Add more) No 0% NA Yours Faithfully WASTU RACHANA ASSOCIATES CONSULT:NG ENGINEER'S REGD NO O1O 5'A,WAKHARKAR NAGAR,DHULE Agreed and Accepted by' ilOB.g4222ggg05, G!. 231680 For, Vrundavan Buildcon e Signature-of Promoter Name: Vijay Narayan Bhadlikar Date: 06.05.2025