VASTU RACHANA ASSOCIATE Architectural DesiSrr & Supereision Add : 5-A" Wakharkar Nagar , Behind Natrai Talkies, Dhule 42t1fi)l FORM-2 (See Regulation 3) ENGINEER S CERTIFICATE (To be submitted at the time of Registration of ongoing Proiect and for withdrawal of Money from Designated Account-Proiect wise) Date:06052025 To, Vrundavan Buildcon, Shri Krishna Marbal ComPound, Parola Road, Opp. Cotton Market, Near APMC, Dhule, Nashik- 424 004. subiect Certilicate of Cost Incurred for Development of "vrundavan Plaza" having MahaRERA Registration Number :P498fi[11285 being developed by Vrundavan Buildcon. & ■ I/We Er. Ralendra chhaied have undertaken assignment of certilying Estimated Cost for "Vrundavan Plaza" having MahaRERA Registration Number: P4980fi)11285 being developed by Vrundavan Buildcon. 2. We have estimated the cost of civil. MEP and allied works required for completion of the apartments and proportionate completion of intemal & extemal works of the project as per specifications mentioned in agreement of sale. our estimated cost calculations are based on the drawings/plans made available to us for the project under reference by the Developer / consultants. The schedule of items and quantity required for the entire work as calculated by Quantity Suweyor* appointed by Developer/ Engineer, the assumption of the cost of material, labour and other inputs made by developer, and the site inspection carried out by us to ascettain / conlirm the above analysis given to us. 3. We estimate Total Estimated Cost of completion of the aforesaid project under reference at Rs.69,50,500/- (Total of Table A and B) at the time of Registration. The estimated total cost of project is with reference to the Civil, MEP and allied works required for completion of the apartments and proportionate completion of intemal & extemal works, as per specifications mentioned in agreement of sale and for the purpose of obtaining occupation certificate/completion certificate for the building(S) / Wing(S) / Layott / Plotted Development from the Dhule Municipal Corporation being the planning authority under whose iurisdiction the aforesaid proiect is being implemented. 4. The estimated Cost Incurred t11131..12.2021 is calculated at Rs.52,51,300/- (Total of Table A and B). The amount of Estimated Cost hrcurred is calculated on the basis of input materials / services used and unit cost of these items. 5. The Balance cost of Completion of the Civil, MEP and Allied works for completion of the apartments and proportionate completion of intemal & external works, as per specifications mentioned in agreement of sale, of the project is estimated at Rs.1.6,99,200/- (Total of Table A and B). I certify that the cost of the Civil, MEP and allied work for the apartment and proportionate intemal & external works, as per specifications mentioned in agreement of sale, of aforesaid Project as completed on the date of this certificate is as glven in Table A and B Below: fable A Building/Wing/Layout/Plotted Development bearing Number L or called Vrundavan Plaza (To be prepared separately for each Building /Wng/Layout/Plotted Development of the Real Estate Project) Sro No。 Particulars Amounts (In Rs.) 1 Total Estimated cost of the 65′ 00′ 000/― building/ wing/ Layout/ Plotted Developments as 2 Costincurred as on 31.12.2021 52′ 51′ 300/― 3 Work done in percentage (as percentage of the 80。 79% estimated cost) 4 Balance Cost to be Incurred**(Based on 12′ 48′ 700/― Estimated Cost) 5 Cost incurred on additional / Extra Items not NA included in the Estimated Cott (Tq!I"-CI- Table B Internal & External Development Works In Respect of the Registered Phase Sro No。 Particulars Amounts (In Rs.) 1 Total Estimated cost of the Intemal and 4′ 50′ 500/― External Development works including amenities and facilities in the layout 2 Costincurred as on 31.12.2021 0.00 3 Work done in percentage (as percentage of the 0% estimated cost) 4 Balance Cost to be lncurred (Based on 4′ 50′ 500/― Estimated Cost) 5 Cost incurred on additional / Extra Items not included in the Estimated Cost (Table-C) Yours WASTU RACHANA ASSOCIATES RAJENDRA S.CHHA,ED Er. Raien haied CONSULTI‖ G ENG:NEER'S RECD N0 010 Local Authority licence no. 0lO (If appticable) 51AlWAKHARKAR NACAR,DHULE MOB,9422289905,13・ 231680 0,0 Agreed and AccePted bY: For. Vrundavan Buildcon \tu*''.--- Signature oFPrfmoter Name: Vijay NaraYan Bhadlikar Date:06.05.2025 Note: 1. The scope of work is to complete Registered Real Estate Project as per Drawings approved from time to time and as per specifications mentioned in agreement of sale' 2. (.) Quantity survey can be done by office of engineer or can be done by * independent relied uPon by the euantity Surveyor, whose Certificate of quantity calculated can be the name Engineer. ln case of independent quantity surveyor being appointed by Developer, has to be mentioned at the place marked (.) and in case quantity are b"ing calculated by the Engineer, the name of the Person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked (.). 3. (,.,*) Balance Cost to be incurred (4) *y vary from Difference between Total estimated Cost (1) and Actual Cost incurred (2) due to deviation in quantity required / escalation of cost etc. As this is an estimated cost, any deviation in quantity required for development of the Real Estate Project will result in amendment of the cost incurred/ to be incurred. 4. All components of work with specifications are indicative are not exhaustive. 5. please specify if there are any deviations / qualifications. Example: Any deviations in input material used from specification in agreement of sale. Table C List of Extra /Additional/ Deleted Items considered in cost (which were not part of the original estimated of Total Cost) Sr. iirt of Extra/ Additiona/ Deleted items Amount (In Rs.) No. Not Applicable 0・ ′