'\>(~ ?,) -1 , Sand,p N .. Ssirrodane Architect And Engineer.i Warshawadi, Mohadi Upnagar, Dhule, ph.8275267167(m) ------------------------------------------------~~---------------------------- Forml f (See Regulation 3) ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing project and for Withdrawa l of Money from Designated Account) ! Date: 28.11.2024 • To The Proprietor, M/ s. Yog Construc,.tion, Mr. YogirajShivajiraoMarathe 7, Ratnadeep Tower, Agra Road, DattaMandirChowk, Deopur, Dhule- 424 005. f Subject: Certificate of percentage of completion of construction work of "RohiniApe rtment"hav ing MahaRERA Registration Number: P49800011983being developed by Mr. YogirajShivajiraoMarathe Proprietor of l\.,f/s. Yog Construction. Sir, • I / WeSandipS aindane have undertaken assignment as Architect/Licensed Surveyor of certifying percentage of Completion of Construction work of the RohiniAper tment having MahaRERA 11 11 Registration Number: P49800011983being developed by Mr. YogirajShivajiraoMarathe Proprietor of .M/s. Yog Construction. Based on site Inspection, with respect to layout/. each of the building/w ing of the aforesaid Real Estate project. I certify that as on the date of this certificate, the percentage of work done for each of the building/w ing of the Real Estate project under MahaRERA is as per table A herein below.The percentage of the work executed with respect to each of the activity of the entire phase is detailed in table B. ,. Table A , Layout/Building/Wing No "Rohini Apertment" (To be prepared separately for each layout/ building/ wing of the project) ' Sr. No. Task/Activity Percentage of actw work done (As on . 10.03.2023) (1) (2) (3) 1. Excavation 100% 2. Basements (if any) 100% ' 3. Podiums (If any) 100% 4. Plinth 100% 5. Stilt Floor 100% 6. Slabs of Super Structure 100% ' 7. Internal Walls, Internal Plaster, Floorings, Doors and Windows 100% Within Flats /Premises 8. Sanitary Fittings Within the Flat/Premises 100% 9. Staircases, Lifts Wells and Lobbies at each Floor level overhead f3nd 100% Underground Water Tanks 10. External plumbing and external Plaster, Elevation, completion of 100% terraces with waterproofing of the building/wing. ' 11. Installation of Lifts, Water pumps, Fire Fighting Fittings and 100% Equipment as per CFO NOC, Electrical Fittings, Mechanical Equipment, Compliance to conditions of environment / CRZ NOC, finishing to entrance Lobby/s, plinth Protection, paving of areas appurtenant to Building/Wing, Compound wall and all other requirements as may be required to complete the project as per specifications in agreement of sale. Any other activities. ' Table B Common Areas (Internal & External Development Works) in respect of the registered phase /project number SR Sr. No Common areas and Propose Percentage of Details (1) Facilities, Amenities d Actual Work (Yes/No) Done (As on 10.03.2023) t (1) (2) (1I, (1) (2) (3) (4) (5) 1. Internal Roads and No 0% NA Footpaths 2. Water Supply Yes 100% Borewell 3. Sewerage (chamber, Lines, Yes 100% STP Not Applicable Septic Tank, STP) ' • ,. 4. Storm Water Drains No - NA 5. Landscaping &Tree Planting No - NA t 6. Street Lighting Yes - NA 7. Community Buildings No - NA 8. Treatment and Disposal of No - NA Sewage and Sullage water 9. Solid Waste Management & No - NA Disposal • 10. Water Conservation/Rain No - NA Water harvesting 11. Ener~y Management No - NA 12. Fire Protection and Fire No - \ NA Safety Requirements ' 13. Electrical meter room, Sub- No - NA t Station, Receiving station 14. Others (Option to Add more) No - \ \ \ NA Yours Faithfully ' • ~· \ AR. SANDIP SAINDANE ' \ (Lic:Bt>J,e.iq;Al2012/56437) Agree~cepted by: For, M/s. Yog Construct;J·o yoG CONSTRUCTI ,.__ - ~' Signature Name: Mr. Yogiraj Shivajirao Marathe Designation: Proprietor Date: 28.11.2024 Place: Dhule •