7 ' San dip N. Sain dan e Architect And EngiJ\eer_ Warshawadi, Mohadi Upnagar, Dhule"" ph.8275267167(m) • Forml (See Regula tion 3) ARCHITECT'S CERTIFICATE (To be submi tted at the time of Registration of Ongoi ng project and for Withd rawal of Money from Design ated Account) l f Date: 28.11.2024 To The Proprietor, M/ s. Yog Construction, Mr. YogirajShivajiraoMarathe 7, Ratnadeep Tower, Agra Road, DattaMandirChowk, Deopur, Dhule- 424 005. • Subjec t Certificate of percentage of completion of construction work of "Rohin iApertment"haying MahaRERA Registration Number: P49800011983being develo ped by Mr. YogirajShivajiraoMarathe Proprietor of M/s. ·Yog Construction. Sir, f I / WeSan dipSai ndane have undert aken assignment as Architect/Lic ensed Surveyor of certifying percentage of Completion of Construction work of the "Rohin iApertment"having MahaRERA Registration Number: P49800011983being developed by Mr. Yogira jShivajiraoMarathe. Proprietor of Mfs. Yog Construction. Based on site Inspection, with respect to layout / each of the buildin g/ wing of the aforesaid Real Estate project. I certify that as on the date of this certificate, the percen • tage of work done for each of the buildin g/wing of the Real Estate project under MahaRERA is as per table A herein below.The percentage of the work execut :d with respect to each of the activity of the entire phase is detailed in table B. ' Table A ,, . I ' Layout/Building/Wing No "Rohini Apertment" (To be prepared separat ely for each layout/ building/ wing of the project) Sr. No. Task/Activity Percentage of actw,1 t work done (As on 31.12.2022) (1) (2) (3) 1. Excavation 100% 2. Basements (if any) 100% t 3. Podiums (If any) 100% 4. Plinth . 100% 5. Stilt Floor 100% 6. Slabs of Super Structure 100% 7. Internal Walls, Internal Plaster, Floorings, Doors and Windows 100% Within Flats /Premises f 8. Sanitary Fittings Within the Flat/Premises 100% 9. Staircases, Lifts Wells and Lobbies at each Floor level overhead :md 100% Underground Water Tanks 10. External plumbing and external Plaster, Elevation, completion of 100% terraces with waterproofing of the building/wing. 11. Installation of Lifts, Water pumps, Fire Fighting Fittings and 100% Equipment as per CFO NOC, Electrical Fittings, Mechanical • Equipment, Compliance to conditions of environ ment/ CRZ NOC, finishing to entrance Lobby/s, plinth Protection, paving of areas cippurtenant to Building/Wing, Compound wall and all other requirements as may be required to complete the project as per specifications in agreement of sale. Any other activities. Table B ,Common Areas (Internal & External Development Works) in respect of the registered phase /project numbe r SR Sr. No. Common areas and Propose Percentage of Details (1) Facilities, Amenities d Actual Work (Yes/No) Done (As on 31.12.2022) (1) (2) (1 (1) (2) (3) (4) (5) • 1. Internal Roads and No 0% NA Footpaths 2. Water Supply Yes 100% Borewell 3. Sewerage (chamber, Lines, Yes 100% STP Not Applicable Septic Tank, STP) f - 4. Storm Water Drains No - NA 5. Landscaping &Tree Planting No - NA 6. Street Lighting Yes - NA 7. Community Buildings No - NA ' 8. Treatment and Disposal of No - NA Sewqge and Sullage water 9. Solid Waste Management & No - NA Disposal 10. Water Conservation/Rain No - NA Water harvesting 11. Energy Management No - NA ' 12. Fire Protection and Fire No - NA Safety Requirements 13. Electrical meter room, Sub- No - NA Station, Receiving station 14. Others (Option to Add more) No - NA ' Yours Faithfully • AR. SANDIP SAINDANE •(licens 6437) Agreu«..i_............. u epted by: For, Mis. Yo C • 10G CO ' Signature of~l~ote : Name: Mr. Yogiraj Shivajirao Marathe Designation: Proprietor Date: 28.11.2024 Place: Dhule f '