Sandip N. Saindan e Architect And Engin,eer. Warshawadi, Mobadi Up.nagar, Dhule, ph.8275267167(~) ' Forml (See Regulation 3) ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing project and for Withdrawal of Money from Designated Account) l Date: 28.11.2024 To The Proprietor, M/ s. Yog Construction, Mr." YogirajShivajiraoMarathe 7, Ratnadeep Tower, Agra Road, DattaMandirChowk, Deopur, Dhule- 424 005. ' Subject Certificate of percentage of completion of construction work of "RohiniAperfment"having MahaRERA Registration Number: P49800011983being developed by Mr. YogirajShivajiraoMarathe Proprietor of Ivf/s. :Yog Construction. Sir, I / WeSandipSain dane have undertaken assignment as Architect/lice nsed Surveyor of certifying percentage of Completion of Construction work of the "RohiniApertm ent"having MahaRERA Registration Number: P49800011983being developed by Mr. YogirajShivajiraoMarathe, Proprietor of M/s. Yog Construction. Based on site Inspection, with respect to layout/ each of the building/~ing of the aforesaid Real Estate project. I certify that as on the date of this certificate, the percentage of work done for each of the building/wing of the Real Estate project under MahaRERA is as per table A herein below.The percentage of the work executed with respect to each of the activity of the entire phase is detailed in table B. Table A r •" , •. r , .._ ·•... - , • - ~·""• .-.., • ~ ~-~. .. IS.;ru.... !-'l."":- • f , r . Layout/Building/Wing No "Rohini Apertment" (To be prepared separately for each of the project) layout/ building/ wing Sr. No. Task/Activity Percentage of actu.1I work done (As on 30.09.2022) f (1) (2) (3) 1. Excavation 100% 2. Basements (if any) 100% 3. Podiums (If any) 100% 4. Plinth f 100% 5. Stilt Floor 100% 6. Slabs of Super Structure 100% 7. Internal Walls, Internal Plaster, Floorings, Doors and Windows 100% Within Flats /Premises 8. Sanitary Fittings Within the Flat/Premises 100% f 9. Staircases, Lifts Wells and Lobbies at each Floor level overhead ~nd 100% Underground Water Tanks 10. External plumbing and external Plaster, Elevation, completion of 100% terraces with waterproofing of the building/wing. 11. Installation of Lifts, Water pumps, Fire Fi_ghting Fittings and 100% Equipment as per CFO NOC, Electrical Fittings, Mechanical Equipment, Compliance to conditions of environment / CRZ NOC, finishing to entrance Lobby/s, plinth Protection, paving of areas f appurtenant to Building/Wing, Compound wall and all other requirements as may be required to complete the project as per specifications in agreement of sale. Any other activities. Table B Common Areas (Internal & External Development Works) in respect of the registere d phase !project number s~ Sr. No Common areas and Propose Percentage of Details (1) Facilities, Amenitie s d Actual Work (Yes!No) Done (As on 30.09.2022) (1) (2) (1 (1) (2) (3) (4) (5) 1. Internal Roads and No 0% NA Footpaths f 2. Water Supply Yes 100% Borewell 3. Sewerage (chamber, Lines, Yes 100% STP Not Applicable Septic Tank, STP) 4. Storm Water Drains No - NA 5. Landscaping &Tree Planting No - NA 6. Street Lighting Yes - NA 7. Community Buildings No - NA ' 8. Treatment and Disposal of No - NA Sewage and Sullage water 9. Solid-Waste Management & No - NA Disposal 10. Water Conservation/Rain No - NA Water harvesting 11. Energy Management No - NA f 12. Fire Protection and Fire No - NA Safety Requirements 13. Electrical meter room, Sub- No - NA Station, Receiving station 14. Others (Option to Add more) No - NA ' Yours Faithfully AR. SANDIP SAINDANE (License N 2012/56437) ·~ Agreed a d A epted by: For, Mis. Yog Construction VOG CON TRUC...Jl 1 ~'t'J' Signature Cf'ffi~!INl~"'t> Name: Mr. Yogiraj Sh ajirao Marathe ' Designation: Proprietor Date: 28.11.2024 Place: Dhule . t