Form 1 (See Regulation 3) de'sign ARCHITECT'S CERTIFICATE PANKAJ for DEORE (To be submitted at the time of Regisfation of Ongoing proiect and ARCHITECT Withdrawal of Money from Designated Account) INTERIOR DE S IGN ER Date: 29.04.2026 To The Designated Paitner, Katariya Land Developers & Buildels LLP, CTS No 572/ 1, Station Road, Near Nagar Palika, N a-nd.urbar ' 4254'12. Subjectl CeIt Jicate of percentage of completion of h'tlction work of C B MARKET having MahaRERA Registation Number: P4970004 being developed bY KatariYa Land Developer & Builders LLP. Sir, ed Surveyor of celtiJying I Pankai Diwakar Deore have undeftaken assignment as Architect/ percentage of Completlon of Conshuchon work of the C B MARKET ha MahaRERA Resistuation Numberr P49700049824 being develoPed by Kataiiya Land Dev oper & Builde6 LLP. aforesaid Real Estate of Based on site Inspectlon, with respect to iayout/each of the building/wing of done for each o{ the Droiect. I certifv that as on the date of this certrficate, the percentage herein below. The ioiiair'rg7*i"g of the Real Estate project 1rrlder MaIaRERA is as Per table enttue hase is detailed in percen;ge of the work executed with resPect to each of the activity of the table B. Table A No.- Building/ Wing N Layout/Building/ (lo be prepared separately for each layout/briilding/wing of (To the project) A A 5r. No, TasVActivity ]Percentage f, of acfual wolk (As on the 7 idone 31.03.2026 'l+\^ (3) 5{9t N 12\ ,Ac 100% Excavation \_/ 'c; --f I ^,ct tcJi i?t 100% {4 r\g ./ a-P '.\o-l Basements (if any) Podiurns (If any) N.A .Ganqai,Ab, veYamaha showroom Rino Road.Jaloaon o425oo1 rel- 02q7- 223'i124 1\ Email.- pankdeo@rediffmail.com 4. Plinth n0'/. 5. Stilt Floor 0v. 6. Slabs of Super Stucture 700v. 7. Intemai Walis,Internal Plaster, Floo ngs, Doors and Windows 10a% Within Flats /Premises B. Sanitary Fittings Within the llat/Premises 740./. 9. StaiJcases, Lifts Wells and Lobbies at each Floor level overhead '100% and Underground Water Tanks 10. Extemal plumbing and extemal Plaster, Elevatiotv completion of 1.00% terraces with waterptoofing of the building/wing. 11. Installation of Lifts, Water pumps, Iire Fighting Fittings and 100y" Equipment as per CFO NOC, Electdcal littings, Mechanical Equipment Compliance to conditions of environment / CRZ NOC, finishing to enhance Lobby/s, plinth ProtectiorL paving of areas appurtenant to Building/Win& Compound wall and all other requirements as may be required to complete the project as pet specifications in agreement of sale. Any other activities. Table B Common Areas (Internal & External Development Works) in respect of the tegistered phase /proiect number Sr. No. Common areas and Proposed Percentage of Details Facilities, Amenities (YesAo) Actual Work Done (As on 31.72.2025) 31.03.2026 (1) 12) (3) (4) (s) 1. Inter'nal Roads and No 0v. NA Iootpaths 2. Water Supply Yes L00y. Borewell &NMC water Connection after completion 3. Sewelage (chamber, Lines, Yes 100% No STP Septic Tank, STP) 4. Storm Water Drains No 0v. NA 5. Landscaping &Tree Planting Yes 0% OnIy Tree Planting 6. Sh-eet Lighting Yes 0v. Compound wall solar lights 7. Community Buildings No a% NA 8. Treatment and Disposal of t\o 0% NA Sewage and Sullage water 4tr b..l * 9. Solid Waste Management & No 0% /<\),,- t4l \a N ,9e'5lgn 3zzoo1 I Disposal t0. Water ConseNation/ Rain 0% NA Water haruesting 11. Ene.rgy Management Yes 1.00% Battery power backup & Solar Pannel 12. Fire Protection and Fire Yes 100./. As per fire NOC 'Safety Requirements t3. Electrical meter room, Sub- Yes 700% Only Meter box Statiort Receiving station 14. Others (Option to Add more) Yours laithfully PANKAJ DIWAKAR DEORE Qu-zoo1 (License No. CA/2001/27359) Agreed and accepted by: For, Katadya Land Developers & Builders LLB Name: Deepak L. Kataria Designahon: Partner Dale: 29 .04.2026