Form 1 (See Regulation 3) de'sign ARCHITECT'S CERTIFICATE PANKAJ (To be submitted at the time of Registration of Ongoing ploiect and for DEORE ARCHITECT Wilhdrawal of Money from Designated Ac(ount) INTERIOR DESIGNER Date. 29 .04.2026 To The Designated Paitner, Katadya Land DeveloPers & Builders LLP, CTS No 572/ 1, Station Road, Near Nagar Palika, Nandurbar - 425412 Subject: CefiJicate of Percentage of compietion of truction work of C B MARKET having MahaRERA Regishation Number: P497000498 being developed by Kataiya Land Developer & Builders LLP. Sir, Surveyor of certifying I Pankaj Diwakai Deole have undeftaken assignment as Architect/ percentage of Completion of Conshuction work oI the C B MARKET ha MaiaRERA Reeishation Number: P49700049824 being developed by Katariya Land t & Buildels LLP Based on site inspectioD with respect to layoqt/each of the building/wing of the aloresaid Real Estate project. I ce*ify that as on tl-Ie date of this certilicate, the percentage* t:t:":n *j:" 1:ti\,3".* table A herein below The t rriiair-rg7-irrg- of the Real Estate project under MaIaRERA is as Per is detailed in p"r"",1tlg" of'tL" *olk executed with respect to each of the activity of the entire'phase table B. Table A Layout/ Building,/ Wing No (ro be prrepared separa tely for each layout/b(ilding/wing of the project) - Tasly'Activity jPe!centage Sr. No, of acfual $/ork idone (As on the o. Er { N (3) n \2) /t c 100% Jl Excavation .JI 100% {, \o ,/o-P Basements (iJ any) Podiums (If any) N.A .Ganqai,Ab ve Yamaha showroom.Rino Road.Jaloaon 042sonl rPl- 02<7- Email.- pankdeo@rediffmail.com ')l&rr'--[ 4. Plinth 100T. 5. Stilt Floor 0% 6. Slabs of Supei Structure 100% 7. Internal Walls, Intemal Plaster, Floorings, Dools ar1d Windo\ /s 100% Within Flat6 /Premises 8. Sanitary Fittings Withh the I'lat/Premises 50% 9. Staircases, Lifts Wells and Lobbies at each Floor level overhead 90% and Underglound Water Tanks 10. n*ternal plrrmbing al1a external Plastel, Elevation, comPletion of 50% teraces with waterptoofing oJ the building/wing 11. Installation of Lifts, Water pumPs, Fire Fighting littings arld 0./. Equipment as per CFO NOC, Electrical littings, Mechanical Equipment Compliarte to conditions of environment / CRZ NOC, finishing to entrance Lobby/ s, Plinth ProtectiorL Paving of areas appurtenant to Building/wing, Compound wa1l and al1 other requirements as may be required to complete the project as per specifications ir agreement o{ sale. ArIy other activities Table B Common Areas (Internal & External Development Wolks) in lesPect of the registeled phase /proiect number Sr. No. Common areag and Proposed Percentage of Details Facilities, Amenities (Yes/No) Actual Work Done (As on 37.72.20 \ (1) (2) (3) \41 (s) 1. Internal Roads al1d No 0% NA Iootpaths 2. Water Supply Yes 30% Borewell &NMC water Comechon after 3. Sewerage (chamber, Lines, Yes 50% No STP Septic Tank, STP) 4. Storm Water Drains No 0v. NA 5. Landscaping &Tree Plal1ting Yes a% Only Tree Planting 6. Sheet Lighting Yes 0% Compound wall solar lights 7. Comrnunity Buildings 0% NA 8. Treatment and Disposal of No 0% NA Sewage arrd Sullage water 4"ss Va> w -\J'^ 9. Solid Waste Management & No o?" /q:/ ,----.t+h-_ a,a Dsposal t0. Water Conservation/ Rain No 0% NA Water hawesting t1. Enel$/ Management Yes 096 Battery power backup & Solar Pannel 12. Fire Protection arld Fire Yes 0% As per tue NOC Safety Requtuements 13. Electrical meter room, Sub- Yes 0% Only Meter box Station, Receiving station 14. Others (Option to Add more) #'\b PANKAJ DIWAKAR DEORE (License No. CAl2001/27359) 6# A$eed and accepted by: For, Katadya Land Developers & Builders LLP, Name: Deepak L. Katadya Designation: Paitner Date.29.04.2026