de'sign PANKAJ DEORE ARCHITECT INTE RIOR DESIGNER (To be srbmitted at the time of Ongoing proiect and for Withdrawal of Money Designated Account) Data:06.12.2024 To The Designated Parhrer, Katariya Land Developers & Builders LLP, CTS No 57211, Station Roa4 Near Nagar Palika, Nandurbar - 425412. Subject: Certificate of percentage of compbtion of work of C B MARKET having MahaRERA Regis tration Number: P497W9824 developed bv Katariva [and Developer & Builders LLP. s4 I Pankaj Diwakar Deore have undertaken assignment as Architect/ Surveyor of certifying percentage of Completion of Construction work of the C B MARKET MahaRERA Regis tration Number P497 [49824 being developed by Katariya Land Developer & B LLP. Based on site Inspection, with respect to layout/each of the building/ of the aforesaid Real Estate profect. I certi& that as on the date of this certificate, the percentage of done for each of the building/wing of the Real Estate project under MahaRERA is as per table A below. The percentage of the work executed with respect to each of the activity of the entire phase is in table B. 22, Gongol, Abow Yomoho Show room, Rlng Rood, Jolgoon ' 425 0Ol, Tel.: 0257 2234124, Mcts.i 94222 968 Emoll : ponkdeo@redlffmoll,corn Table A Layout/ Building/Wing No.- (To be prepared separately for each layout/building/wing of the project) 5r. No. Tasly'Activify Percentage of acfual work done (As on the 30.o9.20E4). (1) (2t (3) 1. Excavation L00% 2. Basements (if any) 1.00% 3. Podiums (If any) N.A 4. Plinth 100% Stilt Floor 0v. o, Slabs of Suoer Structure 100% 7. Intemal Walls ,Intemal Plaster, Floorings, Doors and Windows 100% Within Flats /Premises 8. Sanitary Fittings Within the Flat/Premises 50% 9. Staircases, Lifts Wells and Lobbies at each Floor level overhead 90% and Underground Water Tanks 10. External plumbing and external Plaster, Elevatiory completion of s0% terraces with waterproofing of the building/wing. 11. Installation of Lifts, Water pumps ,Fire Fighting Fittings and 0% Equipment as per CFO NOC, Electrical Fiftings, Mechanical Equipments ,Compliance to conditions of environment / CRZ NOC, Finishing to entrance Lobby/s, plinth Protection, Paving of areas appurtenant to Building/Wing, Compound wall and all other requirements as may be required to complete the project as per specifications in agreement of sale. Any other activities. Table B Cornmon Areas (Internal & External Development Works) in respect of the registered phase /project number Sr. No. Common areas and Proposed Percentage of Details Facilities, Amenities (Yes/No) Actual Work Done (As on 30.O9.2024) (1) (2) (3) (4) (s) 1. Lrtemal Roads and No 0% NA Footpaths Water Supply Yes 30y, Borewell &NMC water Cormection after completion 3. Sewerage (chamber, Lines, Yes 50% No STP Septic Tank, STP) Storm Water Drains No 0Yo NA 5. Landscaping &Tree Planting Yes 0v, Only Tree Planting 6. Street Lighting Yes a% Compound wall solar lights 7. Community Buildings No 0% NA 8. Treatrnent and Disposal of No 0v. NA Sewage and Sullage water 9. Solid Waste Managernent & No 0% NA Disposal t0. Water Conservation/ Rain No 0% NA Water harvesting t1. Energy Management Yes 0% Battery power backup & Solar parurel L1. Fire Protection and Fire Yes OYo As per fire NOC Safety Requirements 13. Electrical meter room, Sub- Yes 0% Only Meter box Station, Receiving station 14. Others (Option to Add more) KAJ DIWAKAR DEORE Agreed and Accepted by: For, Katariya Land Developers & Builders LLP, ffi r'4zrnnl