Millennium Bunglow, Behind Hotel Red Chilly, Anandi Nagar, Gangapur Road, Nashik 422013 Cell no. - 9657199999. E-mail - vinitchaudh ai@ vahoo. com Ere Vinit Prakash Chaudhari B.E. tCivil). M.S. London (Sustainable Environmental Management). GOM TP & VD State Level Registration i Certiflcate no STATE/R/2023/APL/07688 Practising Valuers Association (lndia) membershrp No. LM-1230 Annexure A Form 1. (see Regulation 3) ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Proiect and for Withdrawal of Money from Designated Account) Date:27.02.2023 To, Mr. Prakash Raman Chaudhari (Proprietor), M/s Shree Ganesh Land developers, 3rd Floor, Shree Ganesh Anand, Parijat Nagar, Mahatma Nagar, Nashik, Maharashtr a422005 . Subiect Certificate of percentage of completion of construction work of "Shree Ganesh Crown" having MahaRERA Registration Number : P497W025399 being developed by lflt Shree Ganesh Land developers. Sir, I /We Er. Vinit P Chaudhari have undertaken assignment as Architect / Licensed Surveyor of certifying percentage of Completion of Construction work "Shree Ganesh Crown" having MahaRERA Registration Number :P497W25399 being developed by IWt Shree Ganesh Land developers. Based on Site Inspection, with respect to each of the building/wing of the aforesaid Real Estate project, I certify that as on the date of this certificate, the percentage of work done for each of the building/wing of the Real Estate project as registered under MAHA RERA is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in table B. Table A Sr.No Tasly'Activity Percentage Of work Do 31..03.2023 1 Excavation 100% 2 Number of basement(s) and plinth 100% Number of Podiums 0% Stilt Floor 0% Number of Slabs Of Super Structure 100% ) Intemal Walls,Intemal Plaster, Floorings Within Flats /Premises, 50y" Doors and Windows to each of the Flat /Premises 1 Sanitary Fittings Within the Flat/Premises, Electrical Fittings 0% Within the Flat/Premises 3 Staircases, Lifts Wells and Lobbies at each Floor level 0% connecting staircases and Lifts, Overhead and Underground Water Tanks 9 The external plumbing and extemal Plaster, Elevation, 0% completion of terraces with waterproofing of the building / wings, 10 Installation of Lifts,Water pumps,Fire Fighting Fittings and 0% Equipment as per CFO NOC, Electrical Fittings to Common areas, electro, Mechanical Equipments,Compliance to conditions of environment / CRZ NOC, Finishing to entrance Lobby /s, plinth Protection, Paving of areas appurtenant to Building/Wng, Compound wall and all other requirements as may be required to obtain Occupation / Completion Certificate Table B Internal & External Development Works In respect of the entire Registered Phase Sr.Nò Common areas and Proposed Percentage Of Details Facilities, Amenities (Yesfillo) Work Done as on 37.03.2023 ■■ Internal Roads and NO 0 NA Footpaths' ︐ 一 Water Supply YES 50o/" NA 3. Sewerage (chamber, Lines, YES 0 NA Septic Tank, STP) 4. Storm Water Drains NO 0 NA 5. Landscaping & Tree Planting YES 0 NA 6. Street Lighting NO 0 NA 7. Community Buildings NO 0 NA 8. Treatment and Disposal of YES 0 NA Sewage and Sullage water 9. Solid Waste Management & NO 0 NA Disposal 10。 Water Conservation,Rain YES 0 NA Water harvesting 11. Energy Management NO 0 NA 12. Fire Protection And Fire safety NO 0 NA Requirements 13. Electrical meter room, Sub- NO 0 NA Station, Receiving station 14. Others (Option to Add more) NO 0 NA Yours Faithfully th fort^*l Er.Vinit P Chaudhari Signature & Name (In Block letters) of Architect Authority lic enc e N o. STATE/R/2 0231 APUOT 688. Agreed and accepted by: For Shree Ganesh Land developers Signature of Name: Mr. Prakash Raman Chaudhari Designation: Proprietor Date: 01.08.2023