Mi!lennium Bung!ow, Behind Hotel Red Chil:y:Anandi Nagar, Gangapur Road,Nashik 422013 Ce‖ no ‑9657199999 匡‐ infrc力 atrdヵ a″ Oya力 οo oom mal!― ピ Er.Vinit Prakash Chaudhari B.E. (Civil), M.S, London (Sustainable Environmental Management). TP, Nandurbar Registration No. ADTP-Nandurbar/Engineer/48 Practising Valuers Association (lndia) membership No. LM-3230. Annexure A Form L (see Regulation 3) ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Proiect and for Withdrawal of Money from Designated Account) Date:27.02.2023 To, Mr. Prakash Raman Chaudhari (Proprietor), M/s Shree Ganesh Land developers, 3rd Floor, Shree Ganesh Anand, Parijat Nagar, Mahatrna Nagar, Nashik, Maharashtr a422005. Subiect Certificate of percentage of completion of construction work of "Shree Ganesh Crown" having MahaRERA Registration Number :P49700025399 being developed by Itd/t Shree Ganesh Land developers. Sir, I / \Ne Er. Vinit P Chaudhari have undertaken assignment as Architect / Licensed Surveyor of certifying percentage of Completion of Construction work "Shree Ganesh Crown" having MahaRERA Registration Number :P4970OO25399 being developed by I\d/t Shree Ganesh Land developers. Based on Site Inspection, with respect to each of the building/wing of the aforesaid Real Estate project, I certify that as on the date of this certificate, the percentage of work done for each of the building/wing of the Real Estate proiect as registered under MAHA RERA is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in table B. Table A Sro No Tasly'Activity Percentage Of work Do 31..L2.2022 1 Excavation 100% Number of basement(s) and plinth 100% Number of Podiums 0% Stilt Floor 0% Number of Slabs Of Super Structure 50% Internal Walls ,Internal Plaster, Floorings Within Flats /Premises, 0% Doors and Windows to each of the Flat /Premises Sanitary Fittings Within the Flat/Premises, Electrical Fittings 0% Within the Flat/ Premises Staircases, Lifts Wells and Lobbies at each Floor level 0% connecting staircases and Lifts, Overhead and Underground Water Tanks The external plumbing and external Plaster, Elevation, 0% completion of terraces with waterproofing of the building / wings, 10 Installation of Lifts,Water pumps,Fire Fighting Fittings and 0% Equipment as per CFO NOC, Electrical Fittings to Common areas, electro, Mechanical Equipments,Compliance to conditions of environment / CRZ NOC, Finishing to enhance Lobby /s, plinth Protection, Paving of areas appurtenant to Building/tNng, Compound wall and all other requirements as may be required to obtain Occupation / Completion Certificate Table B Internal & External Development Works In respect of the entire Registered Phase Sro No Common areas and Proposed Percentage Of Work I)etails Facilities, Amenities (Yes['{o) Done as on 37.12.2022 1. Internal Roads and NO 0 NA Footpaths' 2. Water Supply YES 50To NA 3. Sewerage (chamber, Lines, YES 0 NA Septic Tank, STP) 4. Storm Water Drains NO 0 NA 5. Landscaping & Tree Planting YES 0 NA 6. Street Lighting NO 0 NA 7. Community Buildings NO 0 NA 8. Treatment and Disposal of YES 0 NA Sewage and Sullage water 9. Solid Waste Management & NO 0 NA Disposal 10. Water Conservation,Rain YES 0 NA Water harvesting ■■ ■■ Energy Management NO 0 NA 12. Fire Protection And Fire safety NO 0 NA Requirements 13. Electrical meter room, Sub- NO 0 NA Station, Receiving station 14. Others (Option to Add more) NO 0 NA Yours FaithfullvJ Signature & Name (In Block letters)of Architect (ADTP-Nandurbar/ Engineer/ 48)