Millennium Bunglow, Behind Hotel Red Chilly, Anandi Nagar, Gangapur Road, Nashik 422013. i,, Cell no. - 9657199999. E-mail - vi nitchaudhai@ vahoo.com Er.Vinit Prakash Chaudhari B.E. (Civil). M.S. London (Sustainable Environmental Management). TP, Nandurbar Registration No. ADTP-Nandurbar/Engineer/48 Practising Valuers Association (lndia) membership No. LM-3230. Annexure A Form 1. (see Regulation 3) ARCHITECT'S CERTIFICATE (To be submitted at the time of Regishation of Ongoing proiect and for Withdrawal of Money from Designated Account) Date:21.02.2023 To, Mr. Prakash Raman Chaudhari (Proprietor), M/s Shree Ganesh Land developers, 3rd Floor, Shree Ganesh Anand, Pariiat Nagar, Mahatma Nagar, Nashik, Maharashtr a-422005. Subiect Certificate of percentage of completion of construction work of "Shree Ganesh Crown" having MahaRERA Registration Number : P4970N25399 being developed by IWt Shree Ganesh Land developers. Sir, I / We Er. Vinit P Chaudhari have undertaken assigrunent as Architect / Licensed Surveyor of certifying percentage of Completion of Construction work "Shtee Ganesh Crown" having MahaRERA Registration Number :P49700025399 being developed byM/s Shree Ganesh Land developers. Based on Site Inspection, with respect to each of the building/wing of the aforesaid Real Estate project, I certify that as on the date of this certificate, the percentage of work done for each of the building/wing of the Real Estate project as registered under MAHA RERA is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in table B. Table A Sr. No Tasly'Activity Percentage Of work Do 30.09.2022 Excavation 100% Number of basement(s) and plinth 100% Number of Podiums 0% Stilt Floor 0% Number of Slabs Of Super Structure 507o Internal Walls,Internal Plaster, Floorings Within Flats /Premises, 0% Doors and Windows to each of the Flat /Premises Sanitary Fittings Within the Flat/Premises, Electrical Fittings 0% Within the Flat/ Premises I Staircases, Lifts Wells and Lobbies at each Floor level 0% connecting staircases and Lifts, Overhead and Underground Water Tanks 9 The external plumbing and external Plaster, Elevation, 0% completion of terraces with waterproofing of the building / wings, 10 Installation of Lifts,Water pumps,Fire Fighting Fittings and 0% Equipment as per CFO NOC, Electrical Fittings to Common areas, electro, Mechanical Equipments,Compliance to conditions of environment / CRZ NOC, Finishing to entrance Lobby/ s, plinth Protection, Paving of areas appurtenant to Building/Wng, Compound wall and all other requirements as may be required to obtain Occupation / Completion Certificate Table B Internal & External Development Works In respect of the entire Registered Phase Sr. No Common areas and Proposed Percentage Of Work Details Facilities, Amenities (Yes/\io) Done as on 30.09.2022 ■■ Internal Roads and NO 0 NA Footpaths' ︐ Water Supply YES 50% NA 3. Sewerage (chamber, Lines, YES 0 NA Septic Tank, STP) 4. Storm Water Drains NO 0 NA 5. Landscaping & Tree Planting YES 0 NA 6. Street Lighting NO 0 NA 7. Community Buildings NO 0 NA 8. Treatment and Disposal of YES 0 NA Sewage and Sullage water 9. Solid Waste Management & NO 0 NA Disposal 10. Water Conservation,Rain YES 0 NA Water harvesting 11. Energy Management NO 0 NA 12. Fire Protection And Fire safety NO 0 NA Requirements 13. Electrical meter room, Sub- NO 0 NA Station, Receiving station 14. Others (Option to Add more) NO 0 NA Yours FaithfullvJ 鰤。 出 Er. Vinit P Chaudhari Signature & Name (In Block letters) of Architect (ADTP-Nandurbar/ Engineer/ 48)