Mil!ennium Bungiow, Behind Hotel Red Chilly,Anandi Nagar, Gangapur Road,Nashik 42201 3 ●` Ce‖ no ‑9657199999 圧― mall― ピ in′ rc力 aυ dゎ arκ )yaわ οo com Er.Vinit Prakash Chaudhari B.E. (Civil), M.S. London (Sustainable Environmental Management). TP. Nandurbar Registration No. ADTP-Nandurbar/Engineer/48 Practising Valuers Association (lndia) membership No. LM-3230. Annexure A Form 1 (see Regulation 3) ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing proiect and for Withdrawal of Money from Designated Account) Date:17.02.2023 To, Mr. Prakash Raman Chaudhari (Proprietor), M/s Shree Ganesh Land developers, 3rd Floor, Shree Ganesh Anand, Parijat Nagar, Mahatma Nagar, Nashik, Maharashtr a422005 . Subiect Certificate of percentage of completion of construction work of "Shree Ganesh Crown" having MahaRERA Registration Number : P49700025399 being developed by IvVt Shree Ganesh Land developers. Sir, I / We Er. Vinit P Chaudhari have undertaken assignment as Architect / Licensed Surveyor of certifying percentage of Completion of Construction work "Shree Ganesh Crown" having MahaRERA Registration Number :P49700025399 being developed by M/" Shree Ganesh Land developers. Based on Site Inspection, with respect to each of the building/wing of the aforesaid Real Estate project, I certify that as on the date of this certificate, the percentage of work done for each of the building/wing of the Real Estate project as registered under MAHA RERA is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in table B. Table A Sr.No Tasly'Activity Percentage Of work Do 30.06.2022 Excavation 100% 2 Number of basement(s) and plinth 100% ) Number of Podiums 0% L Stilt Floor 0% j Number of Slabs Of Super Structure 0% f Internal Walls,Intemal Plaster, Floorings Within Flats /Premises, 0% Doors and Windows to each of the Flat /Premises 7 Sanitary Fittings Within the Flat/Premises, Electrical Fittings 0% Within the Flat/Premises 3 Staircases, Lifts Wells and Lobbies at each Floor level 0% connecting staircases and Lifts, Overhead and Underground Water Tanks 0フ The external plumbing and external Plaster, Elevation, 0% completion of terraces with waterproofing of the building / wings, 10 Installation of Lifts,Water pumps,Fire Fighting Fittings and 0% Equipment as per CFO NOC, Electrical Fittings to Common areas, electro, Mechanical Equipments,Compliance to conditions of environment / CRZ NOC, Finishing to entrance Lobby/ s, plinth Protection, Paving of areas appurtenant to Building/Wng, Compound wall and all other requirements as may be required to obtain Occupation / Completion Certificate Table B Internal & External Development Works In respect of the entire Registered Phase Sro No Common areas and Proposed Percentage Of Work I)etails Facilities, Amenities (Yes[.Jo) Done as on 30.06.2022 1. Internal Roads and NO 0 NA Footpaths' つ一 NA Water Supply YES 50% 3. Sewerage (chamber, Lines, YES 0 NA Septic Tank, STP) 4. Storm Water Drains NO 0 NA 5. Landscaping & Tree Planting YES 0 NA 6. Street Lighting NO 0 NA 7. Community Buildings NO 0 NA 8. Treatment and Disposal of YES 0 NA Sewage and Sullage water 9. Solid Waste Management & NO 0 NA Disposal 10. Water Conservation,Rain YES 0 NA Water harvesting Energy Management NO 0 NA 12. Fire Protection And Fire safety NO 0 NA Requirements 13. Electrical meter room, Sub- NO 0 NA Station, Receiving station 14. Others (Option to Add more) NO 0 NA Yours Faithfully .-)'i G.t*"Ii- ';i Er. Vinit P Chaudhari Signature & Name (In Block letters) of Architect (ADTP-Nandurbar/ Engineer/ 48)