,\ \A A VA SO .:· U •tsr,•:,:TE ,- •, 1 •• , ·.•i'LOT','.!R~',G - II.OM-- -- -- -- -- -- -- -- -- SHANTI NAGAR.ICOAIT flOAO,NMOURIAR f> 223574 (II) 11223 - 52421 z C) CIVIL ENr',I NfEA Form l (see Regulation 3J ARCHITECT'S CERTIFICATE ing project and for (To be subm itted at the time of Registration of Ongo Withdrawal of Money from Designated Account) Date: 14.06.2024 To M/ s. Shah Enterprises, Mr. SudhirDhansukhlal Shah 1449, GanpatiMandir Road, Ritu Beauty Parlour, Nandurbar-425412. work of "Bhanudhan Plaza" No. of Subject: Certificate of percentage of completion of construction er: P49700011929)Situated on the Building of the project (MahaRERA Registration Numb y No. 174/ 1/1/ at Nandurbar- plot bearing Plot No. 28 to 30 and 36 to 40, Surve tude of the endpoints) Plot No. 425412.Demarcated by its boundaries (Latitude and longi 12 Mtr Road And 24 MtrDp Roadto 31 and 36to the North,Plot No. 7 and 41to the South, ik, Village-Nandurbar, Taluka- the F.ast,9 Mtr Colony Roadto the West of Division- Nash asuring3037.75sq.mts. area being Nandurbar, District- Nandurbar. PIN- 425412. Adme developed byShah Enterprises. Sir, the assignment as Arch itect/ I.iceased Sun•ey:or of I / WeH eman t PremrajMaheshwari have undertaken work of the ''Bhanudhan Plaza" Building of the certifying percentage of Completion of Construction and 36 to 40, Survey No. 174/ 1/1/ at Nandurbar- Project, Situated on the plot bearing Plot No. 28 to 30 oped by Shah Enterprises. 425412.Admeasuring 3037.75 sq. mts. area being devel the Owner / Promoter:- 1. Following technical professionals are appointed by Architect; (i) M/ s/Shr i/Sm tHem ant PremrajMaheshwarias L.S./ Consultant (ii) M/ s/Shri/SmtMilindShyamsundarRathias Structural (iii) M/s/ Shri/ Smt. .W-f fi~.n t... ffi~ .n~ .~ ....... .as MEP consultant (iv) M/s /Shr i/Sm t..]~ ~~~....~:.. ?.'!:.~ ......... as Site Supervisor ings/wings of the aforesaid Real :Estate project, I Bakd on Site Inspection, with respect to each of the build ntage of work done for each of the buildings/wings certify that as on the date of this certificate, the perce of the Real Estate project as registered vide number: P49700011929under MahaRERA is as per table A herein below.The percentage of the work executed with respect to each activity of the entire phase is detailed in Table B. Table A Bhanudhan Plaza Building No. 01 Sr.No Task/Activity PercentageOf work done As on (06.07.2020) 1 Excavation 100% 2 Number of basement(s) and plinth 100% 3 Number of Podiums 100% 4 Stilt Floor 100% 5 Number of Slabs Of Super Structure 100% 6 IntemaJ Walls,Internal Plaster, Floorings Within Flats /Prermses, 100% Doors and Windows to each of the Flats/Premises 7 Sanitary Fittings Within the Flat/Premises, Elecbical Fittings 100% Within the Flat/Premises 8 Staircases, Lifts Wells, and Lobbies at each Floor level 100% connecting staircases and Lifts, Overhead, and Underground Water Tanks 9 The external plumbing and external Plaster, Elevation, 100% completion ofterraces with waterproofing of the building / wings, 10 Installati.on of Lifts,Water pumps,Fire Fighting Fittings and 100% Equipment as per CFO NOC, Electrical Fittings to Common areas, electro, Mechanical Equipments,Compliance with conditions of environment / CRZ NOC, Finishing to entrance Lobby/ s, plinthProtection, Paving of areas appurtenan t:he Building/Wing,Compound wall, and all other requirements as may be required toobtain an Occupation / Completion Certificate. / Table A Bhanudhan Plaza Building No. 02 Sr.No Task/Activity PercentageOf work done As on (06.0'7.2020) 1 Excavation 100% 2 Number of basement(s) and plinth 100% 3 Number of Podiums 100% 4 Stilt Floor 100% 5 Number of Slabs Of Super Structure 100% 6 Internal Walls ,Internal Plaster, Floorings Wjthin Flats /Prenuses, 100% Doors and Windows to each of the Flat /Premises 7 Sanitary Fittings Within the Flat/Premises, Electrical Fittings 100% Within the Flat/Premises 8 Staircases, Lifts Wells and Lobbies at each Floor level 100% connecting staircases and Lifts, Overhead and Underground Water Tanks 9 The external plumbing and external Plaster, Elevation , 100% completion ofterraces with waterproofing of the building / wings, 10 Installation of Lifts ,Water pumps ,Fire Fighting Fittings and 100% Equipment as per CFO NOC, Electrical Fittings to Common areas, electro, Mechanical Equipments ,Compliance to conditions of environment / CRZ NOC, Finishing to entrance Lobby/ s, plinthProtection, Paving of areas appurtenant to Building/ Wing,Compound wall and all other requirements as may be required toobtain Occupation/ Completion Certificate Table A Bhanudhan Plaza Building No. 03 Sr.No Task/Activity PercentageOf work done As on (06.07.2020) 1 Excavation 100% 2 Number of basement(s) and plinth 100% 3 Number of Podiums 100% 4 Stilt Floor 100% 5 Number of Slabs Of Super Structure 100% 6 Internal Walls ,Internal Plaster, Floorings Within Flats /Premises, 100% Doors and Windows to each of the Flat /Premises 7 Sanitary Fittings Within the Flat/Premises, Electrical Fittings 100% Within the Flat/Premises 8 Staircases, Llfts Wells and Lobbies at each Floor level 100% connecting staircases and Lifts, Overhead and Undergroun d Water Tanks 9 The external plumbing and external Plaster, Elevation , 100% completion ofterraces with waterproofing of the building / wings, 10 Installation of Lifts,Water pumps ,Fire Fighting Fittings and 100% Equipment as per CFO NOC, Electrical Fittings to Common areas, electro, Mechanical Equipments ,Compliance to conditions of environme nt/ CRZ NOC, Finishing to entrance Lobby/ s, plinthProtection, Paving of areas appurtenan t to Building/ Wing,Comp ound wall and all other requirement s as may be required toobtain Occupation / Completion Certificate Table A Bhanudhan Plaza Building No. 04 Sr.No Task/Activity PercentageOf work done As on (06.07.2020) 1 Excavation 100% 2 Number of basement(s) and plinth 100% 3 Number of Podiums 100% 4 Stilt Floor 100% 5 Number of Slabs Of Super Structure 100% 6 Internal Walls rinternaJ Plaster, Floorings Within Flats /Premises, 100% Doors and Windows to each of the Flat /Premises 7 Sanitary Fittings Within the Flat/Premises, Electrical Fittings 100% Within the Flat/Premises 8 Staircases, Lifts Wells and Lobbies at each Floor level 100% connecting staircases and Lifts, Overhead and Underground Water Tanks 9 The external plumbing and external Plaster, Elevation, 100% completion ofterraces with waterproofing of the building / wings, 10 Installation of Lifts ,Water pumps ,Fire Fighting Fittings and 100% Equipment as per CFO NOC, Electrical Fittings to Common areas, electro, Mechanical Equipments ,Compliance to conditions of environment/ CRZ NOC, Finishing to entrance Lobby/ s, plinthProtection, Paving of areas appurtenant to Building/ Wing,Compound wall and all other requirements as may be required toobtain Occupation / Completion Certificate Table A Bhanudhan Plaza Row House. 01 Sr.No Task/Activity PercentageOf work done As on (06.07.2020) 1 Excavation 100% 2 Number of basement(s) and plinth 100% 3 Number of Podiums 100% 4 Stilt Floor 100% 5 Number of Slabs Of Super Structure 100% 6 Internal Walls ,Internal Plaster, Floorings Within Flats /Premises, 100% Doors and Windows to each of the Flat /Premises 7 Sanitary Fittings Within the Flat/Premises, Electrical Fittings 100% Within the Flat/Premises 8 Staircases, Lifts Wells and Lobbies at each Floor level 100% connecting staircases and Lifts, Overhead and Underground Water Tanks 9 The external plumbing and external Plaster, Elevation , 100% completion ofterraces with waterproofing of the building / wings, 10 Installation of Lifts ,Water pumps ,Fire Fighting Fittings and 100% Equipment as per CFO NOC , Electrical Fittings to Common areas, electro, Mechanical Equipments ,Compliance to conditions of environment / CRZ NOC, Finishing to entrance Lobby/ s, plinthProtection, Paving of areas appurtenant to Building/ Wing,Compound wall and all other requirements as may be required toobtain Occupation / Completion Certificate Table A Bhanudhan Plaza Row House. 02 Sr. No Task/Activity PercentageOf work done As on (06.07.2020) 1 Excavation 100% 2 Number of basement(s) and plinth 100% 3 Number of Podiums 100% 4 Stilt Floor 100% 5 Number of Slabs Of Super Structure 100% 6 Internal Walls ,Internal Plaster, Floorings Within Flats /Premises, 100% Doors and Windows to each of the Flat /Premises 7 Sanitary Fittings Within the Flat/Premises, Electrical Fittings 100% Within the Flat/Premises 8 Staircases, Lifts Wells and Lobbies at each Floor level 100% connecting staircases and Lifts, Overhead and Underground Water Tanks 9 The external plumbing and external Plaster, Elevation, 100% completion ofterraces with waterproofing of the building / wings, 10 Installation of Lifts,Water pumps ,Fire Fighting Fittings and 100% Equipment as per CFO NOC , Electrical Fittings to Common areas, electro, Mechanical Equipments ,Compliance to conditions of environment/ CRZ NOC, Finishing to entrance Lobby/ s, plinthProtection, Paving of areas appurtenant to Building/ Wing,Compound wall and all other requirem~ts as may be required toobtain Occupation / Completion Certificate Table B Internal & External Development Worksln respect of the entire Registered Phase r.No. Common areas and Proposed Percentage Of Work Details Facilities, Amenities (Y~o) Done (As On 06.07.2020) 1. Internal Roads and No 0% Footpaths' 2. Water Supply Yes 100% Completed 3. Sewerage (chamber, Lines, Yes 100% Completed Septic Tank, STP) 4. Storm Water Drains Yes 100% Completed 5. Landscaping &Tree Planting Yes 100% Completed 6. Street Lighting Yes 0% 7. CommunityBuildings No 0% 8. Treatment andDisposal of Yes 100% Completed Sewage andSullage water 9. Solid WasteManagement & No 100% Completed Disposal 10. WaterConservation,Rain Yes ' 100% Completed Waterharvesting 11. EnergyManagement Yes 100% Completed . 12. Fire ProtectionAnd Fire Safety Yes 100% Completed Reqll?"ements 13. Electrical meterroom, Sub- Yes 100% Completed Station, Receiving station , 14. Others (Option toAdd more) NA 0% t iiJ iffftf f 4'1'ftfl(~ ,~. ~ll Yours Faithfull;:::~ «- { ff;jJ, •'f~p;~) I~ ,~s1.r • c~-1 4\ T-cl~c tJH,~l~~ 4l r.Mfc ~lfcJ>* " c. 'l, 3l1~ ,rtfll -,nt cJ>llle ;:;~li!H AR. HEMANI PREMRAJ MA~™-~ifi Mob 982235242'9 (License No.N.nlC.3~.........)