C ~VASILI Ul s ...-~ I l I -~ '. f T, ·:ATE • -r r "IN4i",""4,,,' S. ...- .;; , 1 .1SIG\•PLOTMARl(l:\G f-z:, z u C) CIVIL ENGINEER II.OM SHANTI NAGAR,KOAIT ROAD,NANDURBAR f) 223174 (M) 1122352421 Forml (see Regulation 3) ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing project and for Withdrawal of Money from Designated Account) Date: 14.06.2024 To M/ s. Shah Enterprises, Mr. SudhirDhansukhlal Shah 1449, GanpatiMandir Road, Ritu Beauty Parlour, Nandurbar-425412. Subject: Certificate of percentage of completion of construction work of "Bhanudhan Plaza" No. of Building of the project (MahaRERA Registration Number: P49700011929)Situated on the plot bearing Plot No. 28 to 30 and 36 to 40, Survey No. 174/1/1/ at Nandurbar- 425412Demarcated by its boundaries (Latitude and longitude of the endpomts) Plot No. 31 and 36to the North,Plot No. 7 and 41to the South, 12 Mtr Road And 24 MtrDp Roadto the F.ast,9 Mtr Colony Roadto the West of Division- Nashik, Village-Nandurbar, Taluka- Nandurbar, District- Nandurbar. PIN- 425412. Admeasuring3037.75sq.mts. area being developed byShah Enterprises. Sir, I / WeHemant PremrajMaheshwari have undertaken the assignment as Architect/ Lleensed Stuveyor of certifying percentage of Completion of Construction work of the "B'1~udhan Plaza" Building of the Project, Situated on the plot bearing Plot No. 28 to 30 and 36 to 40, Survey No. 174/1/1/ at Nandurbar- 425412.Admeasuring 3037.75 sq. mts. area being developed by Shah Enterprises. 1. Following technical professionals are appointed by the O\.ynet / ·Promoter:- (i) M/ s/Shri/SmtHemant PremrajMaheshwarias L.S./ Architect; (ii) M/ s/Shri/SmtMilindShyamsundarRathias Structural Consultant (iii) M/ s/Shri/Smt. f0. ~~~W.Q.."D.......as MEP consultant ... (iv) M/s/Shri/Smt.1).~h(\:: ... $.: ..S.D.~ ....... as Site Supervisor Based on Site Inspection, with respect to each of the buildings/wings of the aforesaid Real Estate project, I certify that as on the date of this certificate, the percentage of work done for each of the buildings/wings of the Real Estate project as registered vide number: P49700011929under MahaRERA is as per table A herein below.The percentage of the work executed with respect to each activity of the entire phase is detailed in Table B. Table A Bhanudhan Plaza Building No. 01 Sr.No Task/Activity PercentageOf work done As on (31.03.2020) 1 Excavation 100% 2 Number of basement(s) and plinth 100% 3 Number of Podiums 100% 4 Stilt Floor 100% 5 Number of Slabs Of Super Structure 100% 6 Internal Walls,Internal Plaster, Floorings Within Flats /Premises, 100% Doors and Windows to each of the Flats/Premises 7 Sanitary Fittings Within the Flat/Premises, Electrical Fittings 100% Within the Flat/Premises 8 Staircases, Lifts Wells, and Lobbies at each Floor level 100% connecting staircases and Lifts, Overhead, and Underground Water Tanks 9 The external plumbing and external Plaster, Elevation, 100% completion ofterraces with waterproofing of the building / wings, 10 Installation of Lifts,Water pumps,Fire Fighting Fittings and 100% Equipmen t as per CFO NOC, Electrical Fittings to Common areas, electro, Mechanical Equipments,Compliance with conditions of environment / CRZ NOC, Finishing to entrance Lobby/ s, plinthProtection, Paving of areas appurtenan the Building/Wing,Compound wall, and all other requirements as may be required toobtain an Occupation / Completion Certificate. Table A Bhanudhan Plaza Building No. 02 Sr.No Task/Activity PercentageOf work done As on (31.03.2020) r 1 Excavation 100% 2 Number of basement(s) and plinth 100% 3 Number of Podiums 100% 4 Stilt Floor 100% 5 Number of Slabs Of Super Structure 100% 6 Internal Walls ,Internal Plaster, Floorings Within Flats /Premises, 100% Doors and Windows to each of the Flat /Premises 7 Sanitary Fittings Within the Flat/Premises, Electrical Fittings 100% Within the Flat/Premises 8 Staircases, Lifts Wells and Lobbies at each Floor level 100% connecting staircases and Lifts, Overhead and Underground Water Tanks 9 The external plumbing and external Plaster, Elevation , 100% completion ofterraces with waterproofing of the building / wings, 10 Installation of Lifts,Water pumps ,Fire Fighting Fittings and 100% Equipment as per CFO NOC , Electrical Fittings to Common areas, electro, Mechanical Equipments ,Compliance to conditions of environment/ CRZ NOC, Finishing to entrance Lobby/ s, plinthProtection, Paving of areas appurtenant to Building/ Wing,Compound wall and all other requirements as may be required toobtain Occupation / Completion Certificate Table A Bhanudhan Plau Building No. 03 Sr.No Task/Activity PercentageOf work done As on (31.03.2020) 1 Excavation 100% 2 Numbe r of basement(s) and plinth 100% 3 Numbe r of Podiums 100% 4 Stilt Floor 100% 5 Numbe r of Slabs Of Super Structure 100% 6 Internal Walls ,Internal Plaster, Floorings Within Flats /Premises, 100% Doors and Windows to each of the Flat / Premises 7 Sanitary Fittings Within the Flat/Premises, Electrical Fittings 100% Within the Flat/Premises 8 Staircases, Lifts Wells and Lobbies at each Floor level 100% connecting staircases and Lifts, Overhea d and Underground Water Tanks 9 The external plumbing and external Plaster, Elevation , 100% completion ofterraces with waterproofing of the building / wings, 10 Installation of Lifts ,Water pumps ,Fire Fighting Fittings and 100% Equipm ent as per CFO NOC , Electrical Fittings to Common areas, electro, Mechanical Equipments ,Compliance to conditions of environment / CRZ NOC, Finishing to entrance Lobby/ s, plinthProtection, Paving of areas appurte nant to Building/ Wing,Compound wall and all other requirements as may be required toobtain Occupation / Completion Certificate Table A Bhanudhan Plaza Building No. 04 PercentageOf Sr.N o Task/Activity work done As on (31.03.2020) 100% 1 Excavation 100% 2 Num ber of basement(s) and plinth 100% 3 Num ber of Podiums 100% 4 Stilt Floor 100% 5 Number of Slabs Of Supe r Structure /Premises, 100% 6 Internal Walls ,Internal Plaster, Floorings Withi n Flats Doors and Windows to each of the Flat /Prem ises Fittings 100% 7 Sanitary Fittings Within the Flat/Premises, Electrical Within the Flat/Premises 100% 8 Staircases, Lifts Wells and Lobbies at each Floor level nd connecting staircases and Lifts, Overhead and Undergrou Water Tanks 100% 9 The external plumbing and external Plaster, Elevation, ing / completion ofterraces with waterproofing of the build wings, gs and 100% 10 Installation of Lifts ,Water pump s ,Fire Fighting Fittin mon Equipment as per CFO NOC , Electrical Fittings to Com plian ce to cond itions areas, electro, Mechanical Equipments ,Com y/ s, of envir onme nt/ CRZ NOC, Finishing to entrance Lobb to Build ing/ plinthProtection, Paving of areas appu rtena nt as may be Wing,Compound wall and all other requirements required toobtain Occupation / Completion Certificate Table A Bhanudhan Plaza Row House. 01 Sr. No Task/Activity PercentageOf work done As on (31.03.2020) 1 Excavation 100% 2 Number of basement(s) and plinth 100% 3 Number of Podiums 100% 4 Stilt Floor 100% 5 Number of Slabs Of Super Structure 100% 6 Internal Walls rlnternal Plaster, Floorings Within Flats /Premises, 100% Doors and Windows to each of the Flat /Premises 7 Sanitary Fittings Within the Flat/Premises, Electrical Fittings 100% Within the Flat/Premises 8 Staircases, Llfts Wells and Lobbies at each Floor level 100% connecting staircases and Llfts, Overhead and Undergroun d Water Tanks 9 The external plumbing and external Plaster, Elevation , . - 100% completion ofterraces with waterproofing of the building / wings, 10 Installation of Lifts ,Water pumps ,Fire Fighting Fittings and 100% Equipment as per CFO NOC, Electrical Fittings to Common areas, electro, Mechanical Equipments ,Compliance to conditions of environmen t/ CRZ NOC, Finishing to entrance Lobby/ s, plinthProtection, Paving of areas appurtenant to Building/ Wing,Comp ound wall and all other requirements as may be required toobtain Occupation / Completion Certificate Table A Bhanudhan Plaza Row House. 02 Sr.No Task/Activity PercentageOf work done As on (31.03.2020) 1 Excavation 100% 2 Number of basement(s) and plinth 100% 3 Number of Podiums 100% 4 Stilt Floor 100% 5 Number of Slabs Of Super Structure 100% 6 Internal Walls ,Internal Plaster, Floorings Within Flats /Premises, 100% Doors and Windows to each of the Flat /Premises 7 Sanitary Fittings Within the Flat/Premises, Electrical Fittings 100% Within the Flat/Premises 8 Staircases, Lifts Wells and Lobbies at each Floor level 100% connecting staircases and Llfts, Overhead and Underground Water Tanks 9 The external plumbing and external Plaster, Elevation , 100% completion ofterraces with waterproofing of the building / wings, 10 Installation of Lifts ,Water pumps ,Fire Fighting Fittings and 100% Equipment as per CFO NOC , Electrical Fittings to Common areas, ~lectro, Mechanical Equipments ,Compliance to conditions of environment/ CRZ NOC, Finishing to entrance Lobpy(s, . plinthProtection, Paving of areas appurtenant to Building/ Wing,Compound wall and all other requirements as may be required toobtain Occupation / Completion Certificate Table B Internal & External Development Worksln respect of the entire Registered Phase r.No. Common areas and Proposed Percentage Of Work Details Facilities, Amenities (Ye!VNo) Done (As On 31.03.2020) 1. Internal Roads and No 0% Footpaths' 2. Water Supply Yes 100% Completed 3. Sewerage (chamber, Lines, Yes 100% Completed Septic Tank, STP) 4. Storm Water Drains Yes 100% Completed 5. Landscaping &Tree Planting Yes 100% Completed 6. Street Lighting Yes 0% 7. CommunityBuildings No 0% 8. Treatment andDisposal of Yes 100% Completed Sewage andSullage water 9. Solid WasteManagement & No 100% Completed Disposal 10. WaterConservation,Rain Yes 100% Completed Waterharvesting 11. EnergyManagement Yes 100% Completed 12. Fire ProtectionAnd Fire Safety Yes 100% Completed Requirements 13. Electrical meterroom, Sub- Yes 100% Completed Station, Receiving station 14. Others (Option toAdd more) NA 0% I ii, 41,a • arJtflltt ,~. . ~'ef ~.ou.i\s Fai . ( t fur." a-;-'f~•f~ ) • 4.) !·cl~c ~q~c~l\Jl-l • t<1jlc lllfcliTf 4) t, 9, 31)~ '1if11 ~1H q;h)c 1.§!?-223514 Mob 9822352429 AR. HEMANT PREMRAJ MAHESHWARI (License No.NM.C ..3.,.....)