~VA SOU C/l rr~:" TE C • 01 :• ., • ES r- • '.)l -:-~ ; . ,SIG.\• PLOTl\1ARl(l•~G ,J u --------------------- z 11.0M SHAN.Tl N~AR,KORIT ROAD,NANOURBAR f> 221574 (M) 11223&2421 ° CIVIL ENGINEER Forml (see Regulation 3) ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing project and for Withdrawal of Money from Designated Account) Date: 14.06.2024 To M/ s. Shah Enterprises, Mr. SudhirDhansukhlal Shah 1449, GanpatiMandir Road, Ritu Beauty Parlour, Nandurbar-425412. Subject Certificate of percentage of completion of construction work of "Bhanudhan Plaza" No. of Building of the project (MahaRERA Registration Number: P49700011929)Situated on the plot bearing Plot No. 28 to 30 and 36 to 40, Survey No. 174/1/1/ at Nandurbar- 425412.Demarcated by its boundaries (Latitude and l<:>ngitude of the endpoints) Plot No. 31 and 36to the North,Plot No. 7 and 41to the South, 12 Mtr Road And 24 MtrDp Roadto the F.ast,9 Mtr Colony Roadto the West of Division- Nashik, Village-Nandurbar, Taluka- Nandurbar, District- Nandurbar. PIN- 425412. Admeasuring3037.75sq.mts. area being developed byShah Enterprises. Sir, I / WeHemant PremrajMaheshwari have undertaken the assignment as Architect/ Ll.ceHSed ~mvcyor of certifying percentage of Completion of Construction work of the "Bhanudhan Plaza" Building of the Project, Situated on the plot bearing Plot No. 28 to 30 and 36 to 40, Survey No. 174/1/1/ at Nandurbar- 425412.Admeasuring 3037.75 sq. mts. area being developed by Shah Enterprises. 1. Following technic~ professionals are appointed by the Owner/ Promoter:- (i) M/ s/Shri/SmtHemant PremrajMaheshwarias L.S./ Architect; (ii) M/ s/Shri/SmtMilindShyamsundarRathias Structural Consultant (iii) M/s/Shri/Smt.\\~~---~~~~~':'O .... as MEP consultant (iv) M/ s/Shri/Smt. -~~~1t.-.... ~-: .. ........ as Site Supervisor I Based on Site Inspection, with respect to each of the buildings/wings of the aforesaid Real Estate project, I certify that as on the date of this certificate, the percentage of work done for each of the buildings/wings of the Real Estate project as registered vide number: P49700011929under MahaRERA is as per table A herein below.The percentage of the work executed with respect to each activity of the entire phase is detailed in Table B. Table A Bhanudhan Plaza Building No. 01 Sr.No Task/Activity PercentageOf work done As on (31.03.2019) 1 Excavation 100% 2 Number of basement(s) and plinth - 3 Number of Podiums 100% 4 Stilt Floor 100% 5 Number of Slabs Of Super Structure 100% 6 Internal Walls,Intemal Plaster, Floorings Within Flats /Premises, 80% Doors and Windows to each of the Flats/Premises 7 Sanitary Fittings Within the Flat/Premises, Electrical Fittings 0% Within the Flat/Premises 8 Staircases, Lifts Wells, and Lobbies at each Floor level 70% connecting staircases and Lifts, Overhead, and Underground Water Tanks 9 The external plumbing and external Plaster, Elevation, 0% completion ofterraces with waterproofing of the building / wings, 10 Installation of Lift:s,Water pumps,Fire Fighting Fittings and 0% Equipment as per CFO NOC, Electrical Fittings to Common areas, electro, Mechanical Equipments,Compliance with conditions of environment / CRZ NOC, Finishing to entrance Lobby/ s, plinthProtection, Paving of areas appurtenan the Building/Wing,Compound wall, and all other requirements as may be required toobtain an Occupation / Completion Certificate. Table A Bhanudhan Plaza Building No. 02 Sr.No Task/Activity PercentageOf work done As on (31.03.2019) 1 Excavation 100% 2 Number of basement(s) and plinth - 3 Number of Podiums 100% 4 Stilt Floor 100% 5 Number of Slabs Of Super Structure 100% 6 Internal Walls ,Internal Plaster, FJoorings Wrnun Flats /Premises, 80% Doors and Windows to each of the Flat /Premises 7 Sanitary Fittings Within the Flat/Premises, Electrical Fittings 0% Within the Flat/Premises 8 Staircases, Llfts Wells and Lobbies at each Floor level 70% connecting staircases and Lifts, Overhead and Underground Water Tanks 9 The external plumbing and external Plaster, Elevation , 0% completion ofterraces with waterproofing of the building / wings, 10 Installation of Lifts,Water pumps ,Fire Fighting Fittings and 0% Equipment as per CFO NOC , Electrical Fittings to Common areas, electro, Mechanical Equipments ,Compliance to conditions of environment/ CRZ NOC, Finishing to entrance Lobby/ s, plinthProtection, Paving of areas appurtenant to Building/ Wing,Compound wall and all other requirements as may be required toobtain Occupation / Completion Certificate Table A Bhanudhan Plaza Building No. 03 Sr.No Task/Activity PercentageOf work done As on (31.03.2019) 1 Excavation 100% 2 Numb er of basement(s) and plinth - 3 Numb er of Podiu ms 100% 4 Stilt Floor 100% 5 Numb er of Slabs Of Super Structure 100% 6 Intern al Walls ,Intern al Plaster, Floorings Within Flats /Premises, 80% Doors and Wind ows to each of the Flat /Prem ises 7 Sanita ry Fittings Withi n the Flat/P remis es, Electrical Fittings 0% Withi n the Flat/P remis es 8 Staircases, Lifts Wells and Lobbies at each Floor level 70% conne cting stain:'ases and Lifts, Overh ead and Under groun d Water Tanks 9 The extern al plumb ing and external Plaster, Elevation , 0% comp letion ofterraces with waterproofing of the buildi ng / wings , 10 Instal lation of Lifts ,Wate r pump s ,Fire Fighti ng Fitting s and 0% Equip ment as per CFO NOC , Electrical Fittings to Comm on areas, electro, Mechanical Equip ments ,Compliance to conditions of enviro nmen t / CRZ NOC, Finishing to entrance Lobby / s, plinth Protec tion, Pavin g of areas appur tenan t to Build ing/ Wing ,Com pound wall and all other requir ement s as may be requir ed toobta in Occup ation / Comp letion Certificate Table A Bhanudhan Plaza Building No. 04 Sr.No Task/Activity PercentageOf work done As on (31.03.2019) 1 Excavation 100% 2 Number of basement(s) and plinth - 3 Number of Podiums 100% 4 Stilt Floor 100% 5 Number of Slabs Of Super Structure 100% 6 Internal Walls ,Internal Plaster, Floorings Within Flats /Premises, 80% Doors and Windows to each of the Flat /Premises 7 Sanitary Fittings Within the Flat/Premises, Electrical Fittings 0% Within the Flat/Premises 8 Staircases, Lifts Wells and Lobbies at each Floor level 70% connecting staircases and Lifts, Overhead and Underground Water Tanks 9 The external plumbing and external Plaster, Elevation , 0% completion ofterraces with waterproofing of the building / wings, 10 Installation of Lifts ,Water pumps ,Fire Fighting Fittings and 0% Equipment as per CFO NOC, Electrical Fittings to Common areas, electro, Mechanical Equipments ,Compliance to conditions of environment / CRZ NOC, Finishing to entrance Lobby/ s, plinthProtection, Paving of areas appurtenant to Building/ Wing,Compound wall and all other requirements as may be required toobtain Occupation / Completion Certificate Table A Bhanudhan Plaza Row House. 01 Sr.No Task/Activity PercentageOf work done As on (31.03.2019) 1 Excavation 100% 2 Numbe r of basement(s) and plinth - 3 Numbe r of Podium s 100% 4 Stilt Floor 100% 5 Numbe r of Slabs Of Super Structu re 50% 6 Interna l Walls ,InternaJ Plaster, Floorings Witrun Flats /Premis es, 0% Doors and Window s to each of the Flat /Premis es 7 Sanitar y Fittings Within the Flat/Pre mises, Electrical Fittings 0% Within the Flat/Pr emises 8 Staircases, Lifts Wells and Lobbies at each Floor level 0% connec ting stairras es and Lifts, Overhe ad and Underg round Water Tanks 9 The externa l plumbi ng and externa l Plaster, Elevati on, 0% comple tion ofterraces with waterpr oofing of the buildin g / wings, 10 Installa tion of Lifts ,Water pumps ,Fire Fightin g Fittings and 0% Equipm ent as per CFO NOC , Electrical Fittings to Commo n areas, electro, Mechanical Equipm ents ,Compliance to conditio ns of environ ment / CRZ NOC, Finishin g to entrance Lobby/ s, plinthP rotectio n, Paving of areas appurte nant to Buildin g/ Wing,C ompoun d wall and all other require ments as may be require d toobtai n Occupa tion / Comple tion Certificate Table A Bhanudhan Plaza Row House. 02 Sr.No Task/Activity PercentageOf work done As on (31.03.2019) 1 Excavation 100% 2 Number of basement(s) and plinth - 3 Number of Podiums 100% 4 Stilt Floor 100% 5 Number of Slabs Of Super Structure 50% 6 Internal Walls ,Internal PJaster, Floorings Within FJats /Premises, 0% Doors and Windows to each of the Flat /Premises 7 Sanitary Fittings Within the Flat/Premises, Electrical Fittings 0% Within the Flat/Premises 8 Staircases, Lifts Wells and Lobbies at each Floor level 0% connecting staircases and Lifts, Overhead and Underground Water Tanks 9 The external plumbing and external Plaster, Elevation, 0% completion ofterraces with waterproofing of the building / wings, -- 10 Installation of Lifts,Water pumps ,Fire Fighting Fittings and 0% Equipment as per CFO NOC , Electrical Fittings to Common areas, electro, Mechanical Equipments ,Compliance to conditions of environment / CRZ NOC, Finishing to entrance Lobby/ s, plinthProtection, Paving of areas appurtenant to Building/ Wing,Compound wall and all other requirements as may be required toobtain Occupation / Completion Certificate - Table B Internal & External Developme nt Worksln respect of the entire Registered Phase r.No. • Common areas and Proposed Percentage Of Work Details Facilities, Amenities (Yei;'No) Done (As On 31.03.2019) 1. Internal Roads and No 0% - Footpaths' 2. Water Supply Yes 0% - 3. Sewerage (chamber, Lines, Yes 0% - Septic Tank, S1P) 4. Storm Water Drains Yes 0% - 5. Landscaping &Tree Planting Yes 0% - 6. Street Lighting Yes 0% - 7. CommunityBuildings No 0% - 8. Treatment andDisposal of Yes 0% - Sewage andSullage water 9. Solid WasteManagement & No 0% - Disposal 10. WaterConservation,Rain Yes 0% - Waterharvesting 11. EnergyManagemen t Yes 0% - 12. Fire ProtectionAnd Fire Safety Yes 0% - Requirements 13. Electrical meterroom, Sub- Yes 0% - Station, Receiving station 14. Others (Option toAdd more) NA 0% - Yows Faithf ully~