( g VA SIU (/) C t r 7. 1N~'"'~' S. -i z C) CIVIL ENGINEER u ) II.OM SHANTI NAOAR,KORIT ROAO,NANOURBAR f> 2Z3&74 (M) 11223&2421 Forml (see Regulation 3) ARCHITECT'S CERTIFICATE (To be submitte d at the time of Registration of Ongoing project and for Withdrawal of Money from Designated Account) Date: 14.06.2024 To M/ s. Shah Enterprises, Mr. SudhirDhansukhlal Shah 1449, GanpatiMandir Road, Ritu Beauty Parlour, Nandurbar-425412. Subject Certificate of percentage of completion of construction work of "Bhanudhan Plaza" No. of Building of the project (MahaRERA Registration Number: P49700011929)Situated on the plot bearing Plot No. 28 to 30 and 36 to 40, Survey No. 174/1/1 / at Nandurb ar- 425412Demarcated by its boundaries (Latitude and longitude of the endpoints) Plot No. 31 and 36to the North,Plot No. 7 and 41to fl\e South, 12 Mtr Road And 24 MtrDp Roadto the F.ast,9 Mtr Colony Roadto the West of Division- Nashik, Village-Nandurbar, Taluka- Nandurbar, District- Nandurbar. PIN~ 425412. Admeasuring3037.75sq.mts. area being developed byShah Enterprises. Sir, Swvey-of of I/ WeHemant PremrajMaheshwari have undertaken the assignment.as Architec t/ Licensed of the certifying percentage of Completion of Construction work of the "Bhanudhan Plaza" Building at Nandurbar- Project, Situated on the plot bearing Plot No. 28 to 30 and 36 to 40, ~l.ll'Vey No. 174/1/1 / 425412Admeasuring 3037.75 sq. mts. area being developed by Shah Enterprises. 1. Following technical professionals are appointed by the Owner / Promoter:- (i) M/ s/Shri/Sm tHemant PremrajMaheshwarias L.S./ Architect; (ii) M/ s/Shri/SmtMilindShyamsundarRathias Structural Consultant (iii) M/ s/Shri/Sm t. .. ~~~X\W ~'X\ ...... as MEP consultant (iv) M/ s/Shri/Sm t. 1>.<:\~:~t ... -~ :... -~~-. ........ as Site Supervisor project, I Based on Site Inspection, with respect to each of the buildings/wings of the aforesaid Real Estate s/ wings certify that as on the date of this certificate, the percentage of work done for each of the building Tabl e A Bhanudhan Plaza Build ing No. 02 Sr.N o Task /Activity PercentageOf work done As on (31.03.20:18) 1 Excavation 100% 2 Num ber of basement(s) and plint h - 3 Num ber of Podiu ms 100% 4 Stilt Floor 100% 5 Num ber of Slabs Of Supe r Structure 100% 6 Inter nal Walls ,Internal Plaster, Floorings Within Flats /Prem ises, 50% Door s and Wind ows to each of the Flat /Prem ises 7 Sanit ary Fittings With in the Flat/Premises, Electrical Fittin gs 0% With in the Flat/ Prem ises 8 Staircases, Lifts Wells and Lobbies at each Floor level 20% conn ectin g staircases and Lifts, Over head and Undergrou nd Wate r Tank s 9 The exter nal plum bing and external Plaster, Elevation , 0% comp letion ofterraces with waterproofing of the building / wing s, 10 Installation of Lifts ,Wat er pump s ,Fire Fighting Fittings and 0% Equi pmen t as per CFO NOC , Electrical Fittings to Com mon areas , electro, Mechanical Equi pmen ts ,Compliance to cond itions of envir onme nt / CRZ NOC, Finishing to entrance Lobb y/ s, plinth.Protection, Pavin g of areas appu rtena nt to Building/ Wing ,Com poun d wall and all other requirements as may ~ requi red toobt ain Occu patio n / Completion Certificate of the Real Estate project as registered vide number: P49700011929under MahaRERA is as per table A herein below.The percentage of the work executed with respect to each activity of the entire phase is detailed in Table B. Table A Bhanudhan Plaza Building No. 01 Sr.No Task/Activity PercentageOf work done As on {31.03.2018) 1 Excavation 100% 2 Number of basement(s) and plinth - 3 Number of Podiums 100% 4 Stilt Floor 100% 5 Number of Slabs Of Super Structure 100% 6 Internal Walls,Internal Plaster, Floorings Within Flats /Premises, 50% Doors and Windows to each of the Flats/Premises 7 Sanitary Fittings Within the Flat/Premises, Electrical Fittings 0% Within the Flat/Premises 8 Staircases, Lifts Wells, and Lobbies at each Floor level 30% connecting staircases and Lifts, Overhead, and Undergroun d Water Tanks 9 The external plumbing and external Plaster, Elevation, 0% completion ofterraces with waterproofing of the building/ wings, 10 Inst:anati.on of Llfts,Water pumps,Fire Fighting Fittings and 0% Equipment as per CFO NOC, Electrical Fittings to Common areas, electro, Mechanical Equipments,Compliance with conditions of environme nt/ CRZ NOC, Finishing to entrance Lobby/ s, plinth.Protection, Paving of areas appurtenan the Building/W ing,Compo und wall, a,nd all other requirements as may be required toobtain an Occupation / Completion Certificate. Table A Bhanudhan Plaza Building No. 03 Sr.No Task/Activity PercentageOf work done As on (31.03.2018) 1 Excavation 100% 2 Number of basement(s) and plinth - 3 Number of Podiums 100% 4 Stilt Floor 100% 5 Number of Slabs Of Super Structure 100% 6 Internal Walls ,Internal Plaster, Floorings Within Flats /Premises, 50% Doors and Windows to each of the Flat / Premises 7 Sanitary Fittings Within the Flat/ Premises, Electrical Fittings 0% Within the Flat/Premises 8 Staircases, Lifts Wells and Lobbies at each Floor level 30% connecting staircases and Lifts, Overhead and Underground Water Tanks 9 The external plumbing and external Plaster, Elevation , 0% completion ofterraces with waterproofing of the building / wings, 10 Installation of Lifts ,Water pumps ,Fire Fighting Fittings and 0% Equipment as per CFO NOC , Electrical Fittings to Common areas, electro, Mechanical Equipments ,Compliance to conditions of environment/ CRZ NOC, Finishing to entrance Lobby/ s, plinthProtection, Paving of areas appurtenant to Building/ Wing,Compound wall and all other requirements as may be required toobtain Occupation / Completion Certificate Table A Bhanudhan Plaza Building No. 04 Sr.No Task/Activity PercentageOf work done As on (31.03.2018) 1 Excavation 100% 2 Number of basement(s) and plinth - 3 Number of Podiums 100% 4 Stilt Floor 100% 5 Number of Slabs Of Super Structure 100% 6 Internal Walls ,Internal Plaster, Floorings Within Flats /Premises, 50% Doors and Windows to each of the Flat / Premises 7 Sanitary Fittings Within the Flat/Premises, Electrical Fittings 0% Within the Flat/Premises 8 Staircases, Lifts Wells and Lobbies at each Floor level 20% connecting staircases and Lifts, Overhead and Underground Water Tanks 9 The external plumbing and external Plaster, Elevation , 0% completion ofterraces with waterproofing of the building / wings, 10 Installation of Lifts ,Water pumps ,Fire Fighting Fittings and 0% Equipment as per CFO NOC , Electrical Fittings to Common areas, electro, Mechanical Equipments ,Compliance to conditions of environment/ CRZ NOC, Finishing to entrance Lobby/ s, plinthProtection, Paving of areas appurtenant to Building/ Wing,Compound wall and all other requirements as may be required toobtain Occupation / Completion Certificate Table A Bhanudhan Plaza Row House. 01 Sr. No Task/Activity PercentageOf work done As on (31.03.2018) 1 Excavation 100% 2 Number of basement(s) and plinth - 3 Number of Podiums 100% 4 Stilt Floor 100% 5 Number of Slabs Of Super Structure 50% 6 Internal Walis ,Internal Plaster, Floorings Within Flats /Premises, 0% Doors and Windows to each of the Flat /Premises 7 Sanitary Fittings Within the Flat/ Premises, Electrical Fittings 0% Within the Flat/Premises 8 Staircases, Lifts Wells and Lobbies at each Floor level 0% connecting staircases and Lifts, Overhead and Underground Water Tanks 9 The external plumbing and external Plaster, Elevation , 0% completion ofterraces with waterproofing of the building / wings, 10 Installation of Lifts ,Water pumps ,Fire Fighting Fittings and 0% Equipment as per CFO NOC, Electrical Fittings to Common areas, electro, Mechanical Equipments ,Compliance to conditions of environment / CRZ NOC, Finishing to entrance Lobby/ s, plinthProtection, Paving of areas appurtenant to Building/ Wing,Compound wall and all other requirements as may be required toobtain Occupation / Completion Certificate Table A Bhanudhan Plaza Row House. 02 Sr. No Task/Activity PercentageOf work done As on (31.03.2018) 1 Excavation 100% 2 Number of basement(s) and plinth - 3 Number of Podiums 100% 4 Stilt Floor 100% 5 Number of Slabs Of Super Structure 50% 6 Internal Walls ,Internal Plaster, Floorings Within F1als / Premises, 0% Doors and Windows to each of the Flat /Premises 7 Sanitary Fittings Within the Flat/Premises, Electrical Fittings 0% Within the Flat/Premises 8 Staircases, Lifts Wells and Lobbies at each Floor level 0% connecting staircases and Lifts, Overhead and Underground Water Tanks 9 The external plumbing and external Plaster, Elevation, 0% completion ofterraces with waterproofing of the building / wings, 10 Inst:allation of Lifts , Water pumps ,Fire Fighting Fittings and 0% Equipment as per CFO NOC, Electrical Fittings to Common areas, electro, Mechanical Equipments ,Compliance to conditions of environment / CRZ NOC, Finishing to entrance Lobby/ s, plinthProtection, Paving of areas appurtenant to Building/ Wing,Compound wall and all other requirements as may be required toobtain Occupation / Completion Certificate Table B Internal & External Development Worksln respect of the entire Registered Phase r.No. Common areas and Proposed Percentage of Details Facilities, Amenities (Yes/No) Work Done As on (31.03.2018) 1. Internal Roads and No 0% Footpaths' 2. Water Supply Yes 0% - 3. Sewerage (chamber, Lines, Yes 0% - Septic Tank, STP) 4. Storm Water Drains Yes 0% - 5. Landscaping &Tree Planting Yes 0% - 6. Street Lighting Yes 0% - 7. CommunityBuildings No 0% - 8. Treatlnent andDisposal of Yes 0% - Sewage andSullage water 9. Solid WasteManagemen t & No 0% - Disposal 10. WaterConservation,Rain Yes 0% - Waterharvesting 11. EnergyManageme nt Yes 0% - 12. Fire ProtectionAnd Fire Safety Yes 0% - Requirements 13. Electrical meterroom, Sub- Yes 0% - Station, Receiving station 14. Others (Option toAdd more) NA 0% - •' '·fiT cii+a' ~•tfll~ ,~. ' 11 C!\ ( i fur. rfj'f ) Yours Faithfully • ~T.cl~c ~q~c~l\if-l a) 4) cMfc ~1fcl,n AR HEMANT PREMRAJ MAHESHWARI . • l,. 3llJf ffl<"11 q;hlc ~ti~61H (License No.~.t0.Cc3.6. ........) ~-223574 Mob 9122352429