ARCHITECT'S CERTIFICATE Date : 20/06/2017 To The Parakh Plexus Realty Ltd, Subject : Certificate of Percentage of Completion of Construction Work of E2 Wing of the PPRL Mera Ghar, Jalgaon situated on the Final Plot no 125+126+127+128+129+130+131+132+133+134/1(125 to 134) of G.No. 284/1+2/1+2/2+2/3+2/4+2/5+2/6 demarcated by its boundaries 12 M Road to the North, Open Space to the South, 9 M Road to the East, 9 M Road to the West of village Pimprala Shiwar, Taluka Jalgaon, District Jalgaon, PIN 425001 admeasuring 1009.95 sq.mts. area being developed by Parakh Plexus Realty Ltd. Sir, I, Ar. Hitesh Parakh have undertaken assignment as Architect of certifying Percentage of Completion of Construction Work of the E2 Building of the Project, situated on the Final Plot No.125+126+127+128+129+130+131+132+133+134/1(125 to 134) of G.No. 284/1+2/1+2/2+2/3+2/4+2/5+2/6 of village Pimprala Shiwar, Taluka Jalgaon, District Jalgaon, PIN 425001 admeasuring 1009.95 sq.mts. area being developed by Parakh Plexus Realty Ltd. 1. Following technical professionals are appointed by Owner / Promoter :- (i) Shri Hitesh V. Parakh as Architect ; (ii) M/s R. G. Birla & Associates as Structural Consultant Based on Site Inspection, with respect to each of the Building of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for each of the building. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table A E2 Building, PPRL Mera Ghar, Jalgaon Sr. No Tasks /Activity Percentage of work done 1 Excavation 100 2 1 number of Plinth 15 3 0 number of Podiums n.a. 4 Stilt Floor 20 5 6 number of Slabs of Super Structure 0 6 Internal walls, Internal Plaster, Floorings within 0 Flats/Premises, Doors and Windows to each of the Flat/Premises 7 Sanitary Fittings within the Flat/Premises, Electrical Fittings 0 within the Flat/Premises 8 Staircases, Lifts Wells and Lobbies at each Floor level 0 connecting Staircases and Lifts, Overhead and Underground Water Tanks 9 The external plumbing and external plaster, elevation, 0 completion of terraces with waterproofing of the Building/Wing, 10 Installation of Lifts, Water Pumps, Fire Fighting Fittings and 0 Equipment as per CFO NOC, Electrical Fittings to Common areas, Electro, Mechanical Equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building, Compound Wall and all other requirements as may be required to obtain Occupation Certificate/ Completion Certificate. TABLE-B E2 Building, PPRL Mera Ghar, Jalgaon S.No Common areas Proposed Percentage of Details and Facilities, (Yes/No) Work done Amenities 1. Internal Roads & N N.A. Foothpaths 2. Water Supply Y 100 Will be Completed 3. Sewarage Septic Tank , Y 0 Will be Completed STP) 4. Storm Water Y 0 Drains Will be Completed 5. Landscaping & Y 100 Tree Planting In Progress 6. Street Lighting N N.A. 7. Community Buildings N N.A. 8. Treatment and disposal of sewage and N N.A. sullage water Solid Waste Management & 9. Disposal N N.A. Water conservation, Rain water 10. harvesting Y 0 Will be Completed Energy 11. management N N.A. Fire protection and fire safety 12. requirements N N.A. Electrical meter room, sub-station, receiving station 13. Y 0 Will be Completed Yours Faithfully, Ar. Hitesh Parakh CA/2016/79282